Filter interviews by
Types of cables include coaxial, twisted pair, fiber optic, and ribbon cables.
Coaxial cables are used for high-frequency transmission and have a central conductor surrounded by insulation and a shield.
Twisted pair cables are commonly used for Ethernet networks and consist of two insulated copper wires twisted together.
Fiber optic cables use light to transmit data and are used for long-distance communication.
Ribbon cabl...
Conductors are materials that allow electric current to flow through them. There are different types of conductors.
Metallic conductors (copper, aluminum, silver, gold, etc.)
Non-metallic conductors (graphite, silicon, etc.)
Superconductors (materials that have zero electrical resistance at very low temperatures)
Semiconductors (materials that have intermediate conductivity)
Ionic conductors (materials that conduct electric
Joints are used to connect two or more electrical conductors together.
Joints are used to extend the length of a conductor.
They are also used to repair a broken conductor.
Joints can be made using various methods such as soldering, crimping, or using connectors.
Proper insulation must be used to prevent short circuits and ensure safety.
Joints should be made with care to ensure good electrical conductivity and avoid resist...
Materials are inspected using various techniques such as visual inspection, testing, and quality control measures.
Visual inspection involves examining materials for any visible defects or abnormalities.
Testing methods include conducting electrical, mechanical, and chemical tests to ensure the materials meet specifications.
Quality control measures involve monitoring and evaluating the materials throughout the production...
BOQ stands for Bill of Quantities, which is a document that lists all the materials, labor, and equipment needed for a construction project.
BOQ is used in construction projects to estimate the cost of materials, labor, and equipment.
It lists all the items needed for the project, along with their quantities and prices.
BOQ helps in budgeting and cost control during the project.
It is prepared by a quantity surveyor or an ...
Top trending discussions
I applied via Approached by Company and was interviewed in Oct 2018. There were 3 interview rounds.
I want to join to further develop my skills, seeking new challenges. I am leaving for career growth opportunities. You should hire me for my experience and expertise.
Seeking new challenges and opportunities for skill development
Leaving for career growth and advancement
Experience and expertise in the field
Ability to contribute effectively to the team and projects
posted on 25 Jun 2021
I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.
posted on 9 Oct 2021
I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed before Aug 2020. There were 3 interview rounds.
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
posted on 18 Oct 2021
I appeared for an interview before Oct 2020.
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Field Engineer
59
salaries
| ₹2.7 L/yr - ₹5 L/yr |
Assistant Manager
53
salaries
| ₹3 L/yr - ₹9 L/yr |
Resident Engineer
46
salaries
| ₹6.6 L/yr - ₹21.5 L/yr |
Section Engineer
46
salaries
| ₹3.2 L/yr - ₹5.5 L/yr |
Site Engineer
42
salaries
| ₹2.8 L/yr - ₹7.8 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International