Filter interviews by
I applied via Naukri.com and was interviewed in Sep 2023. There were 3 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
Some general questions
Initiating substructure to finishing work involves proper planning, coordination, and communication.
Develop a detailed project plan outlining the sequence of activities from substructure to finishing work
Coordinate with subcontractors and suppliers to ensure timely delivery of materials and equipment
Communicate effectively with the project team to ensure everyone is clear on their roles and responsibilities
Regularly mo...
I handle my activities by prioritizing tasks, setting goals, creating schedules, delegating when necessary, and staying organized.
Prioritize tasks based on deadlines and importance
Set specific goals for each activity to stay focused
Create a schedule or to-do list to track progress
Delegate tasks to team members when needed to improve efficiency
Stay organized by keeping track of documents, emails, and meetings
My previous company was a construction firm specializing in commercial building projects.
Managed project timelines and budgets
Coordinated with architects, engineers, and subcontractors
Ensured compliance with building codes and regulations
Implemented quality control measures
Completed projects on time and within budget
Waterproofing is the process of making a structure or object resistant to water penetration.
Waterproofing can be done using various materials such as membranes, coatings, and sealants.
Proper surface preparation is essential before applying waterproofing materials.
Regular maintenance and inspections are necessary to ensure the effectiveness of waterproofing.
Examples of waterproofing methods include using waterproof memb...
BBS stands for Behavior-Based Safety, a systematic approach to preventing workplace accidents by focusing on behaviors that can lead to incidents.
Conduct a thorough analysis of the workplace to identify potential hazards and at-risk behaviors
Develop safety procedures and protocols based on the identified hazards
Train employees on the importance of following safety protocols and encourage reporting of unsafe behaviors
Im...
The allowable tolerance on tiles depends on the type of tile and the installation method.
Allowable tolerance for ceramic tiles is typically +/- 1/16 inch
For larger format tiles, the allowable tolerance may be greater
Tolerance for natural stone tiles can vary based on the type of stone and finish
Consult manufacturer guidelines for specific tolerance recommendations
I applied via Naukri.com and was interviewed in Mar 2023. There were 3 interview rounds.
We conduct quality checks at every stage of the project to ensure compliance with standards and specifications.
Performing visual inspections of materials and equipment
Conducting tests and measurements to verify performance
Reviewing documentation for accuracy and completeness
Implementing corrective actions when deviations are found
I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.
The coefficient of cement is a measure of its ability to expand or contract due to changes in temperature or moisture.
The coefficient of cement is also known as the coefficient of thermal expansion.
It is an important factor to consider in construction projects to prevent cracking or damage to structures.
The coefficient of cement varies depending on the type and composition of the cement.
For example, Portland cement typ...
Escalation of materials refers to the process of increasing the priority or urgency of obtaining necessary materials for a project.
Escalation may occur when there are delays in the delivery of materials or when the demand for materials exceeds the supply.
Project managers may escalate materials by contacting suppliers to expedite delivery or by seeking alternative sources for the materials.
Escalation can impact project ...
posted on 27 Aug 2024
I applied via Referral and was interviewed before Aug 2023. There were 2 interview rounds.
I am not comfortable disclosing the salary of my previous company.
It is not appropriate to discuss previous salary in an interview setting.
Focus on discussing the skills and experiences that make you a strong candidate for the position.
Salary expectations can be discussed during the negotiation phase if an offer is extended.
My expected salary is negotiable and dependent on the overall compensation package offered.
My expected salary is based on my experience, skills, and the responsibilities of the role.
I am open to discussing the salary range for this position during the interview process.
I am looking for a competitive salary that reflects the market value for my skills and experience.
I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.
Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.
Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.
Regular maintenance and cleaning of chiller components can improve efficiency.
Upgrading to a more energy-efficient chiller model can also increase efficiency.
Proper ...
Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.
Water has higher heat transfer capabilities compared to air
Water cooled systems can maintain more consistent temperatures
Water cooled systems are typically used in high performance applications such as data centers and industrial machinery
Duct velocity can be improved by increasing the fan speed or reducing the duct size.
Increase the fan speed to increase the air velocity in the duct.
Reduce the duct size to increase the air velocity.
Use dampers or adjustable louvers to control and optimize the airflow.
Ensure proper sealing of duct joints to minimize air leakage.
Consider using smooth and straight ducts to reduce friction and improve airflow.
Regularly cle...
The chiller system uses various types of gases for cooling purposes.
Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.
R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.
R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.
Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.
Other ...
The VRF system capacity is determined based on the area's cooling and heating load requirements.
Calculate the total cooling load and heating load for the area
Consider factors such as insulation, windows, occupancy, and equipment
Select VRF system capacity based on the calculated load requirements
Consult with HVAC professionals for accurate sizing
I applied via LinkedIn and was interviewed before Jul 2022. There were 3 interview rounds.
Mivan shuttering is a construction technique using aluminum formwork for casting concrete walls, slabs, columns, etc.
Mivan shuttering involves setting up aluminum formwork panels on site
The formwork is assembled and fixed using pins, wedges, and wallers
Concrete is poured into the formwork and allowed to set
Once the concrete has cured, the formwork is removed and reused for the next casting
Mivan shuttering is known for
based on 2 reviews
Rating in categories
Accountant
8
salaries
| ₹4.2 L/yr - ₹5.9 L/yr |
Assistant Manager
7
salaries
| ₹5.5 L/yr - ₹9.5 L/yr |
Fire & Safety Officer
7
salaries
| ₹6 L/yr - ₹9.2 L/yr |
Civil Foreman
7
salaries
| ₹4 L/yr - ₹5 L/yr |
Accounts Officer
7
salaries
| ₹5 L/yr - ₹6.5 L/yr |
Videocon d2h
Whirlpool
Godrej Industries Group
Voltas