Filter interviews by
Clear (1)
I applied via Naukri.com and was interviewed in Jun 2021. There were 3 interview rounds.
The height of a washbasin should be between 800mm to 850mm from the finished floor level.
The height of the washbasin should be comfortable for the user to use.
It should be installed at a height that allows for easy access to the faucet and drain.
The height should also be appropriate for the type of users, such as children or wheelchair users.
The height can vary depending on the type of washbasin and the location of ins...
Conductor load carrying capacity refers to the maximum amount of electrical current that a conductor can safely carry without overheating or causing damage.
The load carrying capacity of a conductor depends on its size, material, and insulation.
The National Electrical Code (NEC) provides tables and formulas to calculate the maximum current a conductor can carry.
Factors such as ambient temperature, installation method, a...
Transformers are of two types - Step-up and Step-down. Step-up transformers increase voltage while Step-down transformers decrease voltage.
Step-up transformers are used in power plants to increase voltage for transmission over long distances.
Step-down transformers are used in households to decrease voltage for safe use.
Other types of transformers include isolation transformers, autotransformers, and instrument transfor...
Safety devices on transformers protect against overloading and overheating.
Safety devices include fuses, circuit breakers, and thermal protectors.
Fuses are designed to melt and break the circuit when the current exceeds a certain level.
Circuit breakers trip and open the circuit when the current exceeds a certain level.
Thermal protectors sense the temperature and disconnect the transformer when it exceeds a certain leve...
The procedure for lift installation involves several steps including site preparation, equipment delivery, installation of guide rails and car frame, electrical and mechanical connections, and testing.
Site preparation including excavation and foundation work
Delivery of equipment including guide rails, car frame, and lift machinery
Installation of guide rails and car frame
Electrical and mechanical connections including w...
Verify contractor bill by checking quantities, rates, and work done.
Check quantities of materials used
Verify rates charged for each item
Ensure work done matches the bill
Compare bill with contract terms
Check for any discrepancies or errors
Request supporting documents if necessary
Top trending discussions
I appeared for an interview in Oct 2024.
I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.
A solution for solving the Rubik's cube
Use the layer-by-layer method
Solve the first layer cross
Solve the first layer corners
Solve the second layer
Solve the third layer cross
Solve the third layer corners
Orient the third layer corners
Permute the third layer corners
Permute the third layer edges
I am open to working in any location as long as the job is challenging and rewarding.
Open to relocation
Prioritize job satisfaction over location
Flexible with work arrangements
based on 3 reviews
Rating in categories
Accountant
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Accounts Officer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Fire & Safety Officer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Company Secretary
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Videocon d2h
Whirlpool
Godrej Industries Group
Voltas