Eros Group Project Engineer MEP Interview Questions, Process, and Tips

Updated 10 Dec 2021

Eros Group Project Engineer MEP Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. Height of washbasin?
  • Ans. 

    The height of a washbasin should be between 800mm to 850mm from the finished floor level.

    • The height of the washbasin should be comfortable for the user to use.

    • It should be installed at a height that allows for easy access to the faucet and drain.

    • The height should also be appropriate for the type of users, such as children or wheelchair users.

    • The height can vary depending on the type of washbasin and the location of ins...

  • Answered by AI
  • Q2. Conductor load caring capacity?
  • Ans. 

    Conductor load carrying capacity refers to the maximum amount of electrical current that a conductor can safely carry without overheating or causing damage.

    • The load carrying capacity of a conductor depends on its size, material, and insulation.

    • The National Electrical Code (NEC) provides tables and formulas to calculate the maximum current a conductor can carry.

    • Factors such as ambient temperature, installation method, a...

  • Answered by AI
  • Q3. Types of transformer and use of particular type?
  • Ans. 

    Transformers are of two types - Step-up and Step-down. Step-up transformers increase voltage while Step-down transformers decrease voltage.

    • Step-up transformers are used in power plants to increase voltage for transmission over long distances.

    • Step-down transformers are used in households to decrease voltage for safe use.

    • Other types of transformers include isolation transformers, autotransformers, and instrument transfor...

  • Answered by AI
  • Q4. How to safety device works on transformer?
  • Ans. 

    Safety devices on transformers protect against overloading and overheating.

    • Safety devices include fuses, circuit breakers, and thermal protectors.

    • Fuses are designed to melt and break the circuit when the current exceeds a certain level.

    • Circuit breakers trip and open the circuit when the current exceeds a certain level.

    • Thermal protectors sense the temperature and disconnect the transformer when it exceeds a certain leve...

  • Answered by AI
  • Q5. What is the procedure for lift installation?
  • Ans. 

    The procedure for lift installation involves several steps including site preparation, equipment delivery, installation of guide rails and car frame, electrical and mechanical connections, and testing.

    • Site preparation including excavation and foundation work

    • Delivery of equipment including guide rails, car frame, and lift machinery

    • Installation of guide rails and car frame

    • Electrical and mechanical connections including w...

  • Answered by AI
  • Q6. How to verify the contractor bill?
  • Ans. 

    Verify contractor bill by checking quantities, rates, and work done.

    • Check quantities of materials used

    • Verify rates charged for each item

    • Ensure work done matches the bill

    • Compare bill with contract terms

    • Check for any discrepancies or errors

    • Request supporting documents if necessary

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and break the line.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Jun 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. ALL MEP EXECUTION related questions taken by Rajeev Chakroborty was outstanding, he was so cooperative during my interview and many more can't express everything.

Interview Preparation Tips

Topics to prepare for Colliers India Project Engineer MEP interview:
  • Guidance
Interview preparation tips for other job seekers - Just be professional.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

General knowledge skills

Round 2 - Technical 

(5 Questions)

  • Q1. Your previous company experience
  • Ans. 

    Worked as a Project Engineer at a construction company for 5 years.

    • Managed multiple civil engineering projects simultaneously

    • Coordinated with architects, contractors, and clients to ensure project success

    • Performed site inspections and quality control checks

    • Prepared project schedules and budgets

    • Resolved any issues or conflicts that arose during construction

  • Answered by AI
  • Q2. Asking your previous work experience
  • Q3. Structure related questions
  • Q4. Finishing related question
  • Q5. Water proofing related question and Bbs

Interview Preparation Tips

Interview preparation tips for other job seekers - Development your technical knowledge
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Project management process
  • Ans. 

    Project management process involves initiating, planning, executing, monitoring, and closing a project.

    • Initiating: Define project scope, objectives, and stakeholders.

    • Planning: Create a detailed project plan, including timelines, resources, and budget.

    • Executing: Implement the project plan and manage resources effectively.

    • Monitoring: Track project progress, identify risks, and make necessary adjustments.

    • Closing: Finalize...

  • Answered by AI
  • Q2. How to manage risk and mitigation plan
  • Ans. 

    Risk management involves identifying, assessing, and prioritizing risks, as well as developing mitigation plans to minimize their impact.

    • Identify potential risks by conducting a thorough risk assessment

    • Assess the likelihood and impact of each risk on the project

    • Prioritize risks based on their severity and potential impact

    • Develop a mitigation plan for each identified risk, including strategies to minimize or eliminate t...

  • Answered by AI
  • Q3. How will you track Long lead item
  • Ans. 

    Long lead items can be tracked by creating a detailed schedule, monitoring progress regularly, and communicating with suppliers.

    • Create a detailed schedule outlining the delivery dates of long lead items

    • Regularly monitor the progress of long lead items to ensure they are on track

    • Communicate effectively with suppliers to address any delays or issues

    • Utilize project management software to track and manage long lead items

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Salary expectation
  • Q2. Notice period
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Share about yourself,
  • Q2. What are the gypsum brands
  • Ans. 

    Some popular gypsum brands include USG, CertainTeed, and Georgia-Pacific.

    • USG

    • CertainTeed

    • Georgia-Pacific

  • Answered by AI
  • Q3. Explain fire fighting syatem in highrise buildings
  • Ans. 

    Fire fighting system in highrise buildings includes fire alarms, sprinkler systems, fire extinguishers, and fire hoses.

    • Fire alarms are installed throughout the building to alert occupants of a fire emergency.

    • Sprinkler systems automatically activate to extinguish fires in the early stages.

    • Fire extinguishers are strategically placed on each floor for manual fire suppression.

    • Fire hoses are available on each floor for trai...

  • Answered by AI
  • Q4. Is mivan shuttering used before
  • Ans. 

    Yes, Mivan shuttering is a popular construction technique used for casting walls and slabs in buildings.

    • Mivan shuttering is a formwork system that allows for rapid construction of concrete walls and slabs.

    • It involves setting up aluminum formwork panels that are easily assembled and dismantled.

    • Mivan shuttering is commonly used in high-rise buildings, residential complexes, and commercial projects.

    • The use of Mivan shutte...

  • Answered by AI
  • Q5. What mix is used for marble flooring
  • Ans. 

    The mix used for marble flooring typically consists of marble chips, cement, sand, and water.

    • Marble chips are the main component for marble flooring mix

    • Cement is used as a binding agent

    • Sand is added for strength and durability

    • Water is used to create a workable mixture

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through with basic study of all department.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Indeed and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Is standard code for concrete mix design
  • Ans. 

    Yes, standard codes are used for concrete mix design to ensure quality and safety.

    • Standard codes provide guidelines for selecting materials, proportions, and testing procedures for concrete mix design.

    • Examples of standard codes include ACI 318 for structural concrete and ASTM C94 for ready-mixed concrete.

    • Following standard codes helps ensure the durability, strength, and workability of the concrete mix.

  • Answered by AI
  • Q2. Site test for steel

Interview Preparation Tips

Topics to prepare for Lodha Group Project Engineer - Civil interview:
  • Concrete technoloy
Interview preparation tips for other job seekers - Study basic concrete technology
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. It was about waterproofing
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Personal Interview Current CTC Current location Expected CTC
Round 2 - One-on-one 

(1 Question)

  • Q1. Projects Details Area of projects Types of projects
  • Ans. 

    The area of projects and types of projects I have worked on vary greatly.

    • I have worked on projects in various industries including construction, healthcare, and technology.

    • Types of projects I have worked on include software development, building construction, and medical equipment installation.

    • I am adaptable and able to quickly learn about new industries and project types.

    • I have experience working on both small and lar

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please don't join on third party payroll, join only on company payroll.

I applied via Recruitment Consulltant

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Case Study 

How to execute a project and delay analysis skills

Round 3 - HR 

(2 Questions)

  • Q1. Negotiate about salary particulars.and other allowances,
  • Q2. Managerial skills for senior level

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice company and very knowledge full. Very strict timings and we have to roam around the city of various projects
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Pressure in fire hydrant pipe
  • Ans. 

    Pressure in fire hydrant pipe is determined by factors like water flow rate, pipe diameter, and elevation difference.

    • Pressure in fire hydrant pipe is directly related to the flow rate of water through the pipe.

    • The diameter of the pipe also affects the pressure, with larger diameter pipes resulting in lower pressure loss.

    • Elevation difference between the hydrant and the point of discharge can impact the pressure in the p...

  • Answered by AI
  • Q2. What is NRC full form
  • Ans. 

    NRC stands for National Register of Citizens.

    • NRC is a register containing names of all genuine Indian citizens in the state of Assam, India.

    • It was first prepared in 1951 and is now being updated to identify illegal immigrants.

    • The NRC process involves verifying the citizenship status of individuals based on documents like birth certificates, land records, etc.

  • Answered by AI

Eros Group Interview FAQs

What are the top questions asked in Eros Group Project Engineer MEP interview?

Some of the top questions asked at the Eros Group Project Engineer MEP interview -

  1. What is the procedure for lift installati...read more
  2. How to safety device works on transform...read more
  3. How to verify the contractor bi...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Samsung Interview Questions
3.9
 • 560 Interviews
LG Electronics Interview Questions
4.0
 • 193 Interviews
Blue Star Interview Questions
4.0
 • 158 Interviews
Voltas Interview Questions
4.0
 • 128 Interviews
Sobha Interview Questions
3.9
 • 127 Interviews
Lodha Group Interview Questions
4.0
 • 124 Interviews
Whirlpool Interview Questions
4.0
 • 92 Interviews
View all
Eros Group Project Engineer MEP Salary
based on 4 salaries
₹6.1 L/yr - ₹7.3 L/yr
12% more than the average Project Engineer MEP Salary in India
View more details

Eros Group Project Engineer MEP Reviews and Ratings

based on 3 reviews

2.9/5

Rating in categories

2.9

Skill development

2.3

Work-life balance

2.9

Salary

1.9

Job security

3.7

Company culture

2.2

Promotions

3.8

Work satisfaction

Explore 3 Reviews and Ratings
Accountant
8 salaries
unlock blur

₹4.2 L/yr - ₹5.9 L/yr

Accounts Officer
7 salaries
unlock blur

₹5 L/yr - ₹6.5 L/yr

Assistant Manager
7 salaries
unlock blur

₹5.5 L/yr - ₹9.5 L/yr

Fire & Safety Officer
7 salaries
unlock blur

₹6 L/yr - ₹9.2 L/yr

Company Secretary
7 salaries
unlock blur

₹3.6 L/yr - ₹8.2 L/yr

Explore more salaries
Compare Eros Group with

Videocon d2h

3.8
Compare

Whirlpool

4.0
Compare

Godrej Industries Group

3.9
Compare

Voltas

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview