Filter interviews by
I applied via Naukri.com and was interviewed in Jun 2021. There were 3 interview rounds.
The height of a washbasin should be between 800mm to 850mm from the finished floor level.
The height of the washbasin should be comfortable for the user to use.
It should be installed at a height that allows for easy access to the faucet and drain.
The height should also be appropriate for the type of users, such as children or wheelchair users.
The height can vary depending on the type of washbasin and the location of ins...
Conductor load carrying capacity refers to the maximum amount of electrical current that a conductor can safely carry without overheating or causing damage.
The load carrying capacity of a conductor depends on its size, material, and insulation.
The National Electrical Code (NEC) provides tables and formulas to calculate the maximum current a conductor can carry.
Factors such as ambient temperature, installation method, a...
Transformers are of two types - Step-up and Step-down. Step-up transformers increase voltage while Step-down transformers decrease voltage.
Step-up transformers are used in power plants to increase voltage for transmission over long distances.
Step-down transformers are used in households to decrease voltage for safe use.
Other types of transformers include isolation transformers, autotransformers, and instrument transfor...
Safety devices on transformers protect against overloading and overheating.
Safety devices include fuses, circuit breakers, and thermal protectors.
Fuses are designed to melt and break the circuit when the current exceeds a certain level.
Circuit breakers trip and open the circuit when the current exceeds a certain level.
Thermal protectors sense the temperature and disconnect the transformer when it exceeds a certain leve...
The procedure for lift installation involves several steps including site preparation, equipment delivery, installation of guide rails and car frame, electrical and mechanical connections, and testing.
Site preparation including excavation and foundation work
Delivery of equipment including guide rails, car frame, and lift machinery
Installation of guide rails and car frame
Electrical and mechanical connections including w...
Verify contractor bill by checking quantities, rates, and work done.
Check quantities of materials used
Verify rates charged for each item
Ensure work done matches the bill
Compare bill with contract terms
Check for any discrepancies or errors
Request supporting documents if necessary
I was interviewed in Oct 2024.
Discussed about Previous Experience
I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.
About working in field work
Targets, achievements etc
I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jan 2023. There were 4 interview rounds.
Data structures, linq and .net core related questions
I applied via LinkedIn
The probability of bit error in a binary symmetric channel can be calculated using the formula P = 1/2 * erfc(sqrt(Eb/N0)), where erfc is the complementary error function.
Probability of bit error in a binary symmetric channel is influenced by the signal-to-noise ratio (Eb/N0).
The error function erfc is used to calculate the probability of bit error.
The formula for calculating the probability of bit error is P = 1/2 * e
Write a code to fill the water tank
The slope of a random voltage waveform can be measured by calculating the rate of change of voltage over time.
Calculate the difference in voltage between two points on the waveform
Divide the voltage difference by the time interval between the two points to get the slope
Repeat this process for multiple points on the waveform to get an average slope
Design a circuit for Water Tank Filling
Use a float switch to detect water level in the tank
Connect the float switch to a relay to control the water flow
Include a solenoid valve to regulate the water flow
Use a microcontroller to monitor the water level and control the relay and solenoid valve
I applied via Job Fair and was interviewed in Apr 2024. There was 1 interview round.
Targets achievements and working etc
posted on 5 Jun 2024
I applied via Naukri.com and was interviewed before Jun 2023. There were 2 interview rounds.
SQL coding and MCQ duration 45 min
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
based on 3 reviews
Rating in categories
Accountant
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Accounts Officer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Fire & Safety Officer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Company Secretary
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Videocon d2h
Whirlpool
Godrej Industries Group
Voltas