Econstruct Design And Build Interview Questions and Answers

Updated 21 Jun 2024

Econstruct Design And Build Interview Experiences

Popular Designations

3 interviews found

Trainee Interview Questions & Answers

user image Anonymous

posted on 21 Jun 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Basic Arithmetic from RS AGARWAL

Round 2 - Group Discussion 

Current affairs topics

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & Prepare arithmetics well

Trainee Interview Questions asked at other Companies

Q1. Ques1: There is a big file of words which is dynamically changing. We are continuously adding some words into it. How would you keep track of top 10 trending words at each moment? Ques2:Write a function that returns the length of the longes... read more
View answer (2)

I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

GD about ArcGIS and Trimble

Interview Preparation Tips

Interview preparation tips for other job seekers - You have to take patience. And keep kalm and answer smoothly what you know don't be hectic.

Construction-General Building Interview Questions asked at other Companies

Q1. How to find the Quantity
View answer (1)

I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Tell me about yourself
  • Ans. 

    I am a motivated and detail-oriented individual with a strong background in project management.

    • Bachelor's degree in Business Administration with a focus on project management

    • Experience in coordinating and managing cross-functional teams

    • Proficient in project management software such as Microsoft Project

    • Strong communication and leadership skills

    • Successfully completed a project to implement a new CRM system for a company,...

  • Answered by AI
  • Q2. Which ERP software do you know
  • Ans. 

    I am familiar with SAP and Oracle ERP software.

    • Familiar with SAP and Oracle ERP software

    • Knowledge of ERP modules like finance, supply chain, and HR

    • Experience in implementing ERP systems

  • Answered by AI
  • Q3. Estimation of a building
  • Ans. 

    Estimation of a building involves calculating the cost and time required for construction.

    • Estimation includes calculating the cost of materials, labor, and equipment.

    • The time required for construction is estimated based on the size and complexity of the building.

    • Factors such as location, permits, and regulations also impact the estimation process.

    • Estimation is important for budgeting and scheduling purposes.

    • Software to...

  • Answered by AI
  • Q4. How many types of contracts are there
  • Ans. 

    There are several types of contracts in project management.

    • There are 3 main types of contracts: Fixed Price, Cost Reimbursable, and Time and Material.

    • Fixed Price contracts have a set price for the project, regardless of actual costs.

    • Cost Reimbursable contracts reimburse the contractor for actual costs incurred, plus a fee.

    • Time and Material contracts pay the contractor for time and materials used, plus a fee.

    • Other types...

  • Answered by AI
  • Q5. Ow much do you know about BIM
  • Ans. 

    BIM stands for Building Information Modeling, a process that involves creating and managing digital representations of physical and functional characteristics of a project.

    • BIM is used in the construction industry to improve collaboration, efficiency, and decision-making throughout the project lifecycle.

    • It allows for the creation of 3D models that integrate various aspects of a building, such as architectural, structura...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident. Do read IS 456 and know CPM, PERT along with softwares.

Skills evaluated in this interview

Project Management Trainee Interview Questions asked at other Companies

Q1. Difference between planning and scheduling
View answer (1)

Interview questions from similar companies

I applied via LinkedIn

Round 1 - Technical 

(1 Question)

  • Q1. What parameters would you consider while designing MSB.
  • Ans. 

    Parameters considered while designing MSB.

    • Load capacity

    • Material selection

    • Safety factors

    • Environmental conditions

    • Ease of maintenance

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Why do you want to join Ramboll

Interview Preparation Tips

Interview preparation tips for other job seekers - Join Ramboll only if you are in your intermediate Job level and want a stable company where you do not have to work much or it is not must for you to do technical work.
If you can do drafting work for your whole life and follow instructions. Because there is no engineering work done here.
Round 1 - Aptitude Test 

Basic aptitude & Questions related to Mechanical Engineering syllabus

Round 2 - Technical 

(1 Question)

  • Q1. Questions related to SOM and metallurgy
Round 3 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Ans. 

    I am an engineer with a passion for problem-solving and innovation.

    • Experienced engineer with expertise in mechanical design and analysis

    • Proficient in CAD software such as AutoCAD and SolidWorks

    • Strong analytical and problem-solving skills

    • Excellent communication and teamwork abilities

    • Successfully completed projects like designing a new product for a client and optimizing manufacturing processes

  • Answered by AI
  • Q2. What is your family background?

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare basics of Mechanical Engineering subjects - mainly SOM, DME, Metallurgy etc.
Show willingness to learn

Interview Questionnaire 

11 Questions

  • Q1. Introduce Yourselves.
  • Q2. What projects are you working on?
  • Q3. Questions related to past projects - Which projects did you work on? What were you responsibilities? How many Engineers & CAD technicians did you manage?
  • Q4. Explain the organization chart at your current work place?
  • Q5. Are you a Professional/Chartered Engineer? Current Status?
  • Q6. Geometric Departures, Design Considerations, Client Requirements, Mitigation of superelevation spillover at reverse curves (if horizontal alignment is fixed), etc.
  • Q7. BIM Application in Highway Models?
  • Ans. 

    BIM application in highway models involves creating a digital representation of the road and its infrastructure.

    • BIM can be used to design and visualize highway projects

    • It allows for collaboration between different stakeholders

    • BIM can help with clash detection and reduce errors in construction

    • It can also be used for maintenance and asset management

    • Examples include the use of BIM in the construction of the M25 motorway i

  • Answered by AI
  • Q8. How do you review/check work of an originator in Civil3D Models?
  • Ans. 

    I review/check work of an originator in Civil3D Models by following a systematic approach.

    • I check for errors and inconsistencies in the model.

    • I verify that the model adheres to the project standards and specifications.

    • I ensure that the model is accurate and complete.

    • I communicate with the originator to clarify any issues or concerns.

    • I document any changes or revisions made to the model.

    • I perform a final review before s

  • Answered by AI
  • Q9. Roundabout Parameters and values for urban and rural roundabouts
  • Ans. 

    Roundabout parameters and values vary based on urban and rural settings.

    • Urban roundabouts typically have smaller diameters and tighter curves than rural roundabouts.

    • Rural roundabouts may have larger diameters and wider curves to accommodate larger vehicles.

    • Speed limits, traffic volume, and pedestrian and cyclist activity also influence roundabout design.

    • Roundabout parameters may include lane widths, splitter island wid...

  • Answered by AI
  • Q10. What input is required in ARCADY and PICADY software?
  • Ans. 

    ARCADY and PICADY software require input such as road geometry, traffic flow, and vehicle characteristics.

    • Road geometry data such as lane widths, radii, and gradients

    • Traffic flow data such as traffic volume, speed, and composition

    • Vehicle characteristics such as dimensions, speed, and acceleration

    • Other inputs such as signal timings and pedestrian crossings

  • Answered by AI
  • Q11. What are your capabilities in Civil3D?
  • Ans. 

    I am proficient in Civil3D and have extensive experience in using it for designing and drafting civil engineering projects.

    • Expertise in creating and editing surfaces, alignments, profiles, and corridors

    • Ability to generate 3D models and perform earthwork calculations

    • Experience in creating plan and profile sheets, cross-sections, and quantity takeoffs

    • Familiarity with Civil3D add-ons such as AutoTURN and Hydraflow

    • Proficie...

  • Answered by AI

Interview Questionnaire 

8 Questions

  • Q1. Good English skills
  • Q2. Ready for good communication and be confident
  • Q3. Have work experience document ready and studies document
  • Q4. Every thing ready for cross check
  • Q5. Have knowledge of what you work before
  • Q6. Have to answer about your job knowledge with good communication
  • Q7. Have passport for this
  • Q8. Have a valid passport for travel to work

I applied via Naukri.com and was interviewed in Feb 2021. There was 1 interview round.

Interview Questionnaire 

14 Questions

  • Q1. 1.Tell me about yourself ?
  • Q2. 2.what kind of input required for single line diagram?
  • Ans. 

    The input required for a single line diagram includes information about the electrical system components and their connections.

    • Information about the electrical system components such as generators, transformers, switchgear, and loads

    • The connections between these components including the type of connection and the ratings of the equipment

    • The voltage level of the system and the type of system grounding

    • The protective devi...

  • Answered by AI
  • Q3. 3.Motor Feeder & Power Feeder requirements?
  • Ans. 

    Motor feeder and power feeder requirements are essential for electrical design engineers to ensure proper functioning of electrical systems.

    • Motor feeder requirements include selecting the appropriate motor size, voltage, and current rating.

    • Power feeder requirements involve determining the load requirements and selecting the appropriate cable size and voltage drop.

    • Proper coordination and protection devices such as circu...

  • Answered by AI
  • Q4. 4.Hazardous area classification? What is Temperature Class? How do we categorized hazardous area?
  • Ans. 

    Hazardous area classification involves categorizing areas based on the presence of flammable gases, vapors, or dusts.

    • Hazardous areas are classified based on the likelihood of the presence of flammable substances.

    • Temperature Class refers to the maximum surface temperature of equipment that can be used in a hazardous area.

    • Hazardous areas are categorized into zones based on the frequency and duration of the presence of fl...

  • Answered by AI
  • Q5. 5.Why we take 1.25 FLA for circuit breaker? 1.5 times for Contactor?
  • Ans. 

    1.25 FLA is taken for circuit breaker and 1.5 times for contactor to ensure protection against overloading and short circuits.

    • 1.25 FLA is the maximum current that a circuit breaker can handle without tripping.

    • 1.5 times FLA is taken for contactor to ensure that it can handle the inrush current during motor starting.

    • This also provides protection against short circuits and overloading.

    • For example, if the full load current...

  • Answered by AI
  • Q6. 6.What is Percentage Impedance? Importance in short circuit current? Calculate short circuit current?
  • Ans. 

    Percentage Impedance is a measure of the voltage drop in a transformer during a short circuit. It determines the ability of the transformer to withstand short circuit currents.

    • Percentage Impedance is the ratio of the rated voltage of a transformer to the short circuit current at its terminals, expressed as a percentage.

    • It represents the internal impedance of the transformer and is usually provided by the manufacturer.

    • A...

  • Answered by AI
  • Q7. 7.Protection schemes for Transformer & Generator?
  • Ans. 

    Protection schemes for transformers and generators.

    • Overcurrent protection

    • Differential protection

    • Distance protection

    • Restricted earth fault protection

    • Backup protection

    • Buchholz relay protection

    • Thermal overload protection

    • Under/over voltage protection

    • Neutral grounding protection

  • Answered by AI
  • Q8. 8.How do we calculate Cabel sizing? Formula for Voltage drop? How do we calculate resistive & Inductive drop? Why do we limit voltage drop to 5 percent?
  • Ans. 

    Cable sizing is calculated using the formula for voltage drop, which takes into account resistive and inductive drop. Voltage drop is limited to 5% to ensure efficient power transmission.

    • Cable sizing is determined by calculating the voltage drop using the formula: VD = (I * L * R * 2) / 1000

    • Resistive drop is calculated using Ohm's Law: Vr = I * R

    • Inductive drop is calculated using the formula: Vi = I * X

    • Voltage drop is ...

  • Answered by AI
  • Q9. 9Earthing Calculation? Standard used for earthing calculation? Resistance in substation ? Resistance for lightning protection?
  • Ans. 

    Earthing calculation standards and resistances for substation and lightning protection.

    • Earthing calculation involves determining the resistance of the earth electrode system.

    • The standard used for earthing calculation is IEEE 80.

    • The resistance in substation should be less than 1 ohm.

    • The resistance for lightning protection should be less than 10 ohms.

    • Factors affecting earthing calculation include soil resistivity, electr...

  • Answered by AI
  • Q10. 10.motor contribution to the short circuit current?
  • Ans. 

    The motor contribution to the short circuit current is significant and needs to be considered in electrical design.

    • The motor's impedance affects the short circuit current level.

    • The motor's starting current can cause a significant increase in short circuit current.

    • The motor's location in the electrical system can affect its contribution to the short circuit current.

    • The motor's size and type can also impact its contribut...

  • Answered by AI
  • Q11. 11.Types of Contactor? Maximum efficiency of Transformer?
  • Ans. 

    Types of contactors include AC, DC, reversing, and definite purpose. Maximum efficiency of transformer depends on load and design.

    • AC contactors are used for alternating current circuits

    • DC contactors are used for direct current circuits

    • Reversing contactors are used to reverse the direction of current flow

    • Definite purpose contactors are designed for specific applications

    • Maximum efficiency of transformer is achieved at fu...

  • Answered by AI
  • Q12. 12.What is non linear loads ? Difference between non linear loads & linear loads?
  • Ans. 

    Non-linear loads are electrical devices that do not have a linear relationship between the voltage and current.

    • Non-linear loads draw non-sinusoidal current waveforms.

    • They can cause harmonic distortion in the electrical system.

    • Examples of non-linear loads include computers, televisions, and variable speed drives.

    • Linear loads have a linear relationship between voltage and current, such as incandescent light bulbs.

    • Linear

  • Answered by AI
  • Q13. 13.Lighting calculation? What is light loss factor ? What is utilisation factor ? Formula ? Minimum lux required in substation ?
  • Ans. 

    Explanation of lighting calculation, light loss factor, utilisation factor, and minimum lux required in substation.

    • Lighting calculation involves determining the amount of light required in a space.

    • Light loss factor is the reduction in light output due to factors such as dirt, dust, and aging of lamps.

    • Utilisation factor is the ratio of light received by a surface to the total light output of the lamps.

    • Formula for lighti...

  • Answered by AI
  • Q14. What is Apfc ? What is series reactor ?
  • Ans. 

    APFC stands for Automatic Power Factor Correction. Series reactor is a device used to limit current flow.

    • APFC is a system that automatically corrects the power factor of an electrical network.

    • It uses capacitors to improve the power factor and reduce energy consumption.

    • Series reactor is a device that is used to limit the flow of current in a circuit.

    • It is used to protect equipment from overvoltage and to reduce harmonic...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. Prepare & write HR questions & answers for confidence. That provides extra edge for ex. Salary expectations, Tell me about yourself, why do you want left current organization etc
2.Prepare & analyse your CV thoroughly and prepare questions from that.
3.Be confident

I applied via Naukri.com and was interviewed in Oct 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. About simulation, GIS mapping, calculation of SR as per flow rate and potential, Integrated CNG stations, specification of MDPE, GI, welded riser, type of joint, specification of Fusion machine, and projec...

Interview Preparation Tips

Interview preparation tips for other job seekers - Be stable, hear the questions properly and answer without any hesitation whatever you know about.

Interview Questionnaire 

5 Questions

  • Q1. Draw a simple line chart for 10 km action plan with in 10 min ( including all safety precautions , procurement , manpower , equipment's , all )
  • Ans. 

    A line chart for a 10 km action plan with safety precautions, procurement, manpower, and equipment.

    • Identify safety precautions needed for the project

    • Procure necessary equipment and manpower

    • Create a timeline for the project

    • Allocate resources efficiently

    • Ensure compliance with regulations and standards

    • Monitor progress and adjust plan as needed

  • Answered by AI
  • Q2. Calculate pup-piece length for - two section are already lowered and overlap 5m and s- bend rolling ,two 90 degree LR bends for 12 inch pipeline ?
  • Ans. 

    To calculate pup-piece length for a 12 inch pipeline with two sections already lowered and overlap 5m and s-bend rolling, two 90 degree LR bends.

    • Calculate the total length of the pipeline

    • Subtract the length of the two sections already lowered and overlap 5m

    • Add the length of the two 90 degree LR bends

    • Divide the result by 2 to get the length of each pup-piece

  • Answered by AI
  • Q3. How you calculate collapse and damage percentage for HDD crossings ?
  • Ans. 

    Collapse and damage percentage for HDD crossings are calculated based on various factors such as soil type, borehole diameter, and drilling fluid properties.

    • Collapse percentage is calculated using the Mohr-Coulomb failure criterion

    • Damage percentage is calculated based on the tensile strength of the pipe and the bending stress induced during the pullback process

    • Factors such as soil type, borehole diameter, and drilling ...

  • Answered by AI
  • Q4. What is methodology for rock excavation and how to measure the quantity?
  • Ans. 

    Methodology for rock excavation involves drilling, blasting, and removal of debris. Quantity is measured by volume or weight.

    • Drilling holes in rock using specialized equipment

    • Placing explosives in the holes and detonating them

    • Removing the debris using heavy machinery

    • Measuring the quantity of rock excavated by volume or weight

    • Using software to calculate the amount of explosives needed for a specific excavation project

  • Answered by AI
  • Q5. In Radiography Interpretation at 30 segment position seems like a crake , but you dint find in UT test how you solve this situation?

Interview Preparation Tips

Interview preparation tips for other job seekers - Pipeline field is full of stress and based on will power management at site fields activities , apart from technical questions have to test his stress handling ,planning and site management .And also confirm that candidate is suitable for pipeline based on his will power and how passionate in pipeline field he can fulfill his responsibilities of any critical situations and targets.

Econstruct Design And Build Interview FAQs

How many rounds are there in Econstruct Design And Build interview?
Econstruct Design And Build interview process usually has 2 rounds. The most common rounds in the Econstruct Design And Build interview process are Group Discussion, Resume Shortlist and Aptitude Test.
How to prepare for Econstruct Design And Build interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Econstruct Design And Build. The most common topics and skills that interviewers at Econstruct Design And Build expect are AutoCAD, Bim, Civil, Civil 3D and Communication Skills.
What are the top questions asked in Econstruct Design And Build interview?

Some of the top questions asked at the Econstruct Design And Build interview -

  1. How many types of contracts are th...read more
  2. Which ERP software do you k...read more
  3. Estimation of a build...read more

Tell us how to improve this page.

Econstruct Design And Build Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 127 Interviews
DLF Interview Questions
3.9
 • 74 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
L&T Realty Interview Questions
4.1
 • 11 Interviews
View all

Econstruct Design And Build Reviews and Ratings

based on 24 reviews

3.5/5

Rating in categories

3.6

Skill development

3.2

Work-life balance

2.8

Salary

2.9

Job security

3.2

Company culture

2.8

Promotions

3.2

Work satisfaction

Explore 24 Reviews and Ratings
Structural Design Engineer
16 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

BIM Engineer
5 salaries
unlock blur

₹3 L/yr - ₹3.6 L/yr

Business Development Executive
4 salaries
unlock blur

₹1 L/yr - ₹2.5 L/yr

BIM Modeller
4 salaries
unlock blur

₹2.4 L/yr - ₹2.5 L/yr

Structural Engineer
3 salaries
unlock blur

₹3.2 L/yr - ₹5 L/yr

Explore more salaries
Compare Econstruct Design And Build with

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Brigade Group

4.1
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview