I applied via Company Website and was interviewed in Jan 2022. There were 5 interview rounds.
My concrete work level is excellent and I have experience in various finishing techniques.
I have experience in pouring and leveling concrete for foundations, walls, and slabs.
I am skilled in using various finishing techniques such as troweling, stamping, and staining.
I pay close attention to detail to ensure a smooth and even finish.
I am knowledgeable in the proper curing and sealing of concrete to ensure its longevity...
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a structure.
BBS is used in drawing work to ensure the correct amount of reinforcement is used in a structure.
It includes details such as bar diameter, length, shape, and placement.
BBS helps in estimating the amount of steel required for a project and also helps in cost estimation.
It is an important part of the construction process an...
Relevant area synapses of preparation through PPT
Doosan Power Systems interview questions for popular designations
Get interview-ready with Top Doosan Power Systems Interview Questions
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Worked as a Senior Planning and Cost Control Engineer at a construction company.
Managed project schedules and budgets to ensure timely completion and cost efficiency.
Collaborated with project managers, engineers, and contractors to develop and update project plans.
Analyzed project data to identify potential cost savings and efficiency improvements.
Prepared regular reports on project progress and financial performance.
I...
I applied via Walk-in
I applied via Campus Placement and was interviewed in May 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Excavator is a heavy construction machine used for digging, Work at height refers to tasks performed above ground level, Hot work involves activities that generate heat or sparks, SWP stands for Safe Work Permit.
Excavator is a heavy construction machine used for digging trenches, foundations, and landscaping.
Work at height includes tasks such as working on scaffolding, roofs, or ladders.
Hot work involves activities lik...
There are different types of fire extinguishers for different types of fires, such as Class A, B, C, D, and K.
Class A fire extinguishers are for ordinary combustibles like wood and paper.
Class B fire extinguishers are for flammable liquids like gasoline and oil.
Class C fire extinguishers are for electrical fires.
Class D fire extinguishers are for flammable metals.
Class K fire extinguishers are for kitchen fires involvi
Top trending discussions
The duration of Doosan Power Systems interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 41 interviews
Interview experience
based on 566 reviews
Rating in categories
Deputy Manager
222
salaries
| ₹5 L/yr - ₹17.5 L/yr |
Manager
161
salaries
| ₹5.8 L/yr - ₹24.1 L/yr |
Senior Engineer
159
salaries
| ₹4 L/yr - ₹12 L/yr |
Engineer
87
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Senior Manager
63
salaries
| ₹10 L/yr - ₹32 L/yr |
Vestas
Dhoot Transmission
Hitachi Energy
Siemens Energy