Upload Button Icon Add office photos

Filter interviews by

Db Power Limited. (2x600 Mw) Super Thermal Power Plant Interview Questions and Answers

Updated 2 Nov 2021

1 interview found

Sort by: Popular

Coal logistics Interview Questions

user image Anonymous

posted on 2 Nov 2021

Interview Questions

Interview Preparation Tips

Interview preparation tips for other job seekers - 3day to go

Interview questions from similar companies

8pn Interview Questions

Adani Power user image Uttam Goswami

posted on 5 Jan 2025

Interview experience
5
Excellent
Difficulty level
Easy
Duration
2-4 weeks
Result
Selected Selected

I applied via Apna Jobs and was interviewed before Jan 2024.

2 Interview Rounds

1

Technical Round (3 Questions)

  • Q1. ITI Electrishyan Halfar and operator and Solar plant power plant
  • Q2. ITI Electrishyan Halfar and operator and Solar plant power plant
  • Q3. ITI Electrishyan
2

ITI Electrishyan Halfar and Round (2 Questions)

  • Q1. ITI Electrishyan Halfar and operator and Solar plant power plant
  • Q2. ITI Electrishyan Halfar and operator and Solar plant power plant

Interview Preparation Tips

Interview preparation tips for other job seekers - ITI Electrishyan Halfar and operator and Solar plant power plant
Interview experience
5
Excellent
Difficulty level
-
Duration
Less than 2 weeks
Result
-

1 Interview Round

1

Technical Round (5 Questions)

  • Q1. Costs control assessment
  • Q2. Best teem management
  • Q3. Daily MIS data analysis
  • Q4. Regular maintenance implementations
  • Q5. Customer service representative

Interview Preparation Tips

Interview preparation tips for other job seekers - Majer aactive responsibility

Production Engineer Interview Questions

ReNew user image PANKAJ GAUR

posted on 6 Nov 2024

Interview experience
2
Poor
Difficulty level
-
Duration
-
Result
-

3 Interview Rounds

1

One-on-one Round (2 Questions)

  • Q1. Rejection analysis
  • Q2. Measurement system analysis
2

Technical Round (2 Questions)

  • Q1. Failure mode effects analysis
  • Q2. Controlling mathod
3

Technical Round (2 Questions)

  • Q1. Statistics process control
  • Q2. Instrument measurement
Interview experience
2
Poor
Difficulty level
-
Duration
-
Result
-

2 Interview Rounds

1

One-on-one Round (2 Questions)

  • Q1. Tell me about yourself",
  • Q2. Why do you want this job?
2

One-on-one Round (2 Questions)

  • Q1. What are your strengths?
  • Q2. What are your weaknesses?

Interview Preparation Tips

Interview preparation tips for other job seekers - I am Week in interview but Not For Work that's my Wiknase or Strength 👍
Interview experience
1
Bad
Difficulty level
Easy
Duration
2-4 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Jul 2024.

1 Interview Round

1

One-on-one Round (4 Questions)

  • Q1. What will you do if your senior doesn’t tell you technical facts of project, management wants you to perform from day 1.
  • Q2. What will you do if 70% of work given to you is a documentation work for next 2 years?
  • Q3. Interviewer was rude and peculiar in his behaviour
  • Q4. Interviewer (Pradeep Biradar) did not had the intention for recruitment. He was demoralising about the position and the company.

Interview Preparation Tips

Interview preparation tips for other job seekers - I was interviewed with Eaton by Pradeep Birader. He introduced himself as some manager. Twice interview was postponed. Later in the interview Mr. Pradeep Biradar started showing his true colour with absolutely absurd questions.

What happens if someone senior in the company doesn’t share technical facts, what will you do??? Management wants you to deliver from first day! All such absurd and nonsense question.

Then he switched his question, what if 70% documentation work given to you for next 2 years, what will you do?
Obviously management should know this better!


All kind of baseless and nonsense questions from the interviewer. Do not know authenticity and credibility of these person. As if he is coming from a roadside slum.

My answer was clear, if someone not willing to share technical details of project than leadership should take care of this. If 70% of documentation work is there, you must hire a technical writer.

Then clearly I showed my disinterest for this position!

This is how some incompetent and incredible people spoils good positions and working culture of good companies.
Interview experience
5
Excellent
Difficulty level
Hard
Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024.

3 Interview Rounds

1

HR Round (1 Question)

  • Q1. Yes i am interested to HR Interview
2

Technical Round (2 Questions)

  • Q1. Yes i am also interested to TECHNICAL interview
  • Q2. Sir I tell u everything About AUTO bussing machine
3

Aptitude Test Round

I am interested to Aptitude test

Interview Preparation Tips

Interview preparation tips for other job seekers - Working with M/s Jackson Engineers Ltd. (Greater Noida ) As a Bussing
Machine Operator Since May 2024 to till now.
Interview experience
5
Excellent
Difficulty level
-
Duration
-
Result
-

3 Interview Rounds

1

Technical Round (3 Questions)

  • Q1. What is your strength
  • Q2. R you good leadership
  • Q3. I am a good leader of this field
2

Group Discussion Round

How to deliver our project on time to costumer with minimum cost

3

HR Round (2 Questions)

  • Q1. Salary discussion
  • Q2. Negotiation
Interview experience
3
Average
Difficulty level
Moderate
Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2024.

2 Interview Rounds

1

HR Round (2 Questions)

  • Q1. Tata in job for parmanent how
  • Q2. Benifits and salary how time of period
2

Technical Round (3 Questions)

  • Q1. Solar project site is working of day
  • Q2. Time of work how
  • Q3. Safety work of area how

Interview Preparation Tips

Topics to prepare for Tata Power Site Execution Engineer interview:
  • Technical Skills
Interview preparation tips for other job seekers - Site execution engineer
Interview experience
1
Bad
Difficulty level
-
Duration
-
Result
-

1 Interview Round

1

Technical Round (2 Questions)

  • Q1. Explain about the project that you did?
  • Q2. Explain the framework that you have worked upon?

Interview Preparation Tips

Interview preparation tips for other job seekers - Never join this.
Only goons sit here. It’s a serious advice

Not even Chennai or any country.

There are real goons

Db Power Limited. (2x600 Mw) Super Thermal Power Plant Interview FAQs

How to prepare for Db Power Limited. (2x600 Mw) Super Thermal Power Plant interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Db Power Limited. (2x600 Mw) Super Thermal Power Plant. The most common topics and skills that interviewers at Db Power Limited. (2x600 Mw) Super Thermal Power Plant expect are Layout, Railways, Techno - commercial, Negotiation and Boq.
What are the top questions asked in Db Power Limited. (2x600 Mw) Super Thermal Power Plant interview?

Some of the top questions asked at the Db Power Limited. (2x600 Mw) Super Thermal Power Plant interview -

  1. What is wark in comp...read more
  2. Duty hrs pls send to me job description sarmited ...read more
  3. Wath is company you haier to ...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 199 Interviews
NTPC Interview Questions
4.2
 • 157 Interviews
Tata Power Interview Questions
4.0
 • 156 Interviews
Torrent Power Interview Questions
3.8
 • 120 Interviews
BHEL Interview Questions
4.2
 • 103 Interviews
Reliance Power Interview Questions
4.1
 • 43 Interviews
JSW Energy Interview Questions
4.1
 • 25 Interviews
CESC Interview Questions
3.8
 • 20 Interviews
NHPC Interview Questions
4.4
 • 9 Interviews
View all

Db Power Limited. (2x600 Mw) Super Thermal Power Plant Reviews and Ratings

based on 9 reviews

4.7/5

Rating in categories

4.6

Skill development

4.5

Work-Life balance

4.5

Salary & Benefits

4.6

Job Security

4.3

Company culture

4.5

Promotions/Appraisal

4.6

Work Satisfaction

Explore 9 Reviews and Ratings
Compare Db Power Limited. (2x600 Mw) Super Thermal Power Plant with

Adani Power

3.9
Compare

NTPC

4.2
Compare

Tata Power

4.0
Compare

Reliance Power

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview