Upload Button Icon Add office photos

Cushman & Wakefield

Compare button icon Compare button icon Compare

Filter interviews by

Cushman & Wakefield Interview Questions, Process, and Tips

Updated 3 Apr 2025

Top Cushman & Wakefield Interview Questions and Answers

View all 53 questions

Cushman & Wakefield Interview Experiences

Popular Designations

80 interviews found

Technician Interview Questions & Answers

user image Anonymous

posted on 13 Dec 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is hvac, ups, ahu?
  • Ans. 

    HVAC stands for Heating, Ventilation, and Air Conditioning. UPS stands for Uninterruptible Power Supply. AHU stands for Air Handling Unit.

    • HVAC refers to the technology used for indoor environmental comfort, including heating, cooling, and air quality control.

    • UPS is a device that provides emergency power to a load when the input power source fails.

    • AHU is a device used to regulate and circulate air as part of a heating,

  • Answered by AI
  • Q2. What's air cold chiller?
  • Ans. 

    An air cold chiller is a device that cools air by removing heat from it.

    • An air cold chiller is commonly used in air conditioning systems to cool indoor spaces.

    • It works by circulating a refrigerant that absorbs heat from the air and then releases it outside.

    • The chilled air is then distributed through ducts or vents to cool the desired area.

    • Air cold chillers can be used in various settings such as homes, offices, hospita...

  • Answered by AI
  • Q3. What is a Ahu?
  • Ans. 

    An AHU (Air Handling Unit) is a device used to regulate and circulate air as part of a heating, ventilation, and air conditioning (HVAC) system.

    • AHU is an abbreviation for Air Handling Unit.

    • It is a device used in HVAC systems to control and distribute air.

    • AHUs typically consist of a fan, heating and cooling coils, filters, and dampers.

    • They are responsible for conditioning and circulating air within a building.

    • AHUs can b...

  • Answered by AI
  • Q4. What is a lp and hp
  • Ans. 

    LP stands for Low Pass and HP stands for High Pass.

    • LP (Low Pass) is a type of filter that allows low-frequency signals to pass through while attenuating high-frequency signals.

    • HP (High Pass) is a type of filter that allows high-frequency signals to pass through while attenuating low-frequency signals.

    • LP and HP filters are commonly used in audio systems to control the frequency range of the output signal.

    • LP filters are ...

  • Answered by AI
  • Q5. What is a ups?
  • Ans. 

    A UPS (Uninterruptible Power Supply) is a device that provides emergency power to a load when the input power source fails.

    • UPS is used to protect critical equipment from power outages, voltage fluctuations, and other power-related issues.

    • It typically consists of a battery, an inverter, and a rectifier.

    • UPS can be used for various applications such as computers, data centers, hospitals, telecommunications, etc.

    • Examples o...

  • Answered by AI
Round 3 - Technical 

(5 Questions)

  • Q1. What is pac, who to works?
  • Ans. 

    PAC stands for Programmable Automation Controller. It is a device used in industrial automation to control and monitor processes.

    • PAC is a type of controller used in industrial automation systems.

    • It is programmable and can be customized to control and monitor various processes.

    • PACs are often used in manufacturing plants, power plants, and other industrial settings.

    • They can communicate with other devices and systems to g...

  • Answered by AI
  • Q2. What is a water cold chiller?
  • Ans. 

    A water cold chiller is a device that cools water by removing heat from it, typically used in air conditioning systems or industrial processes.

    • A water cold chiller uses a refrigeration cycle to cool water.

    • It consists of components such as a compressor, condenser, expansion valve, and evaporator.

    • The chiller circulates chilled water through a system to remove heat from the surroundings.

    • It is commonly used in air conditio...

  • Answered by AI
  • Q3. What is a acb, vcb?
  • Ans. 

    ACB stands for Air Circuit Breaker and VCB stands for Vacuum Circuit Breaker.

    • ACB is a type of circuit breaker that uses air as the medium to extinguish the arc.

    • VCB is a type of circuit breaker that uses vacuum as the medium to extinguish the arc.

    • Both ACB and VCB are used for electrical circuit protection and can interrupt the flow of current in case of faults.

    • ACBs are commonly used in low voltage applications, while VC...

  • Answered by AI
  • Q4. Which type ac unit using for server room?
  • Ans. 

    Precision air conditioning units are commonly used in server rooms.

    • Precision air conditioning units are designed to provide precise temperature and humidity control.

    • These units are capable of maintaining stable and optimal conditions for sensitive equipment like servers.

    • They often feature redundant systems for reliability and may include features like hot aisle/cold aisle containment.

    • Examples of precision air condition...

  • Answered by AI
  • Q5. What is a csu?
  • Ans. 

    A CSU, or Channel Service Unit, is a device used in telecommunications to connect a digital line to a customer's equipment.

    • CSU stands for Channel Service Unit.

    • It is used in telecommunications to connect a digital line to a customer's equipment.

    • CSUs provide signal regeneration, line coding, and diagnostic capabilities.

    • They ensure reliable transmission of data over long distances.

    • Examples of CSUs include T1 CSUs, ISDN CS

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Cushman & Wakefield Technician interview:
  • Technical Support
  • Electricals
  • HVAC System
  • Fire Safety
Interview preparation tips for other job seekers - Before attended the interview take a self confidence and possesnes.

Top Cushman & Wakefield Technician Interview Questions and Answers

Q1. Which type ac unit using for server room?
View answer (3)

Technician Interview Questions asked at other Companies

Q1. What kinds of pipe used for hot and cold water supply ?
View answer (8)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Nov 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Resume discussion, how did you overcome stress etc
  • Q2. Previous work experience
  • Ans. 

    I have 3 years of experience working as a Supply Chain Analyst for a large retail company.

    • Managed inventory levels to ensure optimal stock levels and minimize excess inventory

    • Analyzed supply chain data to identify trends and make recommendations for process improvements

    • Collaborated with vendors to negotiate pricing and terms for supply contracts

  • Answered by AI
Round 2 - Case Study 

2 excel sheets where given, to analyze and interpret the data to give a better solution for the problem given

Round 3 - One-on-one 

(2 Questions)

  • Q1. Aptitude question
  • Q2. Why did you choose this career, why planned to switch
  • Ans. 

    I chose this career because of my interest in data analysis and problem-solving in the supply chain industry.

    • Passion for data analysis and problem-solving

    • Interest in the supply chain industry

    • Opportunity for growth and advancement

    • Desire to make a positive impact on business operations

  • Answered by AI

Supply Chain Analyst Interview Questions asked at other Companies

Q1. What will you do when the product is not arrived in time which is supposed to be launch today and higher officials prepared a grand program to launch it. How do you convince them in this situation and also the product arrives only after 3 d... read more
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Project management process
  • Ans. 

    Project management process involves initiating, planning, executing, monitoring, and closing a project.

    • Initiating: Define project scope, objectives, and stakeholders.

    • Planning: Create a detailed project plan, including timelines, resources, and budget.

    • Executing: Implement the project plan and manage resources effectively.

    • Monitoring: Track project progress, identify risks, and make necessary adjustments.

    • Closing: Finalize...

  • Answered by AI
  • Q2. How to manage risk and mitigation plan
  • Ans. 

    Risk management involves identifying, assessing, and prioritizing risks, as well as developing mitigation plans to minimize their impact.

    • Identify potential risks by conducting a thorough risk assessment

    • Assess the likelihood and impact of each risk on the project

    • Prioritize risks based on their severity and potential impact

    • Develop a mitigation plan for each identified risk, including strategies to minimize or eliminate t...

  • Answered by AI
  • Q3. How will you track Long lead item
  • Ans. 

    Long lead items can be tracked by creating a detailed schedule, monitoring progress regularly, and communicating with suppliers.

    • Create a detailed schedule outlining the delivery dates of long lead items

    • Regularly monitor the progress of long lead items to ensure they are on track

    • Communicate effectively with suppliers to address any delays or issues

    • Utilize project management software to track and manage long lead items

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Salary expectation
  • Q2. Notice period

Assistant Project Manager Interview Questions asked at other Companies

Q1. What are the different phases in new product development?
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Day today task in last organization
  • Ans. 

    In my last organization, my day-to-day tasks included providing technical support to end users, troubleshooting hardware and software issues, and managing IT tickets.

    • Providing technical support to end users

    • Troubleshooting hardware and software issues

    • Managing IT tickets

  • Answered by AI
  • Q2. Technical support questions by interview

Interview Preparation Tips

Interview preparation tips for other job seekers - It's good company

Help Desk Executive Interview Questions asked at other Companies

Q1. How you can handle clients and experiences.
View answer (2)

Cushman & Wakefield interview questions for popular designations

 Project Coordinator

 (6)

 Assistant Manager

 (6)

 Fire & Safety Officer

 (4)

 Assistant Project Manager

 (2)

 Manager

 (2)

 Project Engineer

 (2)

 Senior Project Engineer

 (2)

 Executive Accountant

 (2)

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Not Selected

I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Frequency of updating of baseline schedule
  • Ans. 

    Baseline schedules should be updated regularly to reflect changes in project scope, timeline, and resources.

    • Baseline schedules should be updated at key project milestones or when significant changes occur.

    • Regular updates ensure that the schedule remains accurate and reflects the current status of the project.

    • Updates should be communicated to all stakeholders to keep them informed of any changes.

    • Examples of changes that...

  • Answered by AI
  • Q2. What is crashing of schedule
  • Ans. 

    Crashing of schedule is a technique used in project management to shorten the project duration by adding more resources.

    • Crashing involves adding more resources to critical path activities to reduce the overall project duration.

    • It is typically used when there is a need to meet a deadline or when there are financial incentives for early completion.

    • Crashing may increase project costs due to the additional resources requir...

  • Answered by AI

Planning Manager Interview Questions asked at other Companies

Q1. Plan vs progress percentage having negative variance, but updated schedule end date is not getting changed (later finish), why?
View answer (2)

Get interview-ready with Top Cushman & Wakefield Interview Questions

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Basic introduction
  • Q2. Man-management knowledge
Round 2 - One-on-one 

(2 Questions)

  • Q1. SOP creations with Engineering guidelines
  • Ans. 

    Creating SOPs with engineering guidelines involves documenting step-by-step procedures based on engineering principles.

    • Understand the engineering processes and requirements

    • Collaborate with engineers to ensure accuracy and effectiveness

    • Document procedures in a clear and concise manner

    • Include safety measures and quality control checkpoints

    • Regularly review and update SOPs based on feedback and changes in engineering guide

  • Answered by AI
  • Q2. Technical knowledge related to MEP and civil as well

Interview Preparation Tips

Interview preparation tips for other job seekers - Explain confidently about yourself and showcase your technical knowledge as per previous experiences

Production Manager Interview Questions asked at other Companies

Q1. Production, Maintenance, Quality and Safety. Out of four, tell me the most important and least important thing for you and why?
View answer (10)

Jobs at Cushman & Wakefield

View all
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-

I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Tell me about yourself.
  • Ans. 

    I am a detail-oriented and experienced Executive Accountant with a strong background in financial analysis and reporting.

    • I have over 8 years of experience in accounting and finance.

    • I am skilled in budgeting, forecasting, and financial modeling.

    • I have a proven track record of improving financial processes and increasing efficiency.

    • I am proficient in using accounting software such as QuickBooks and SAP.

    • I have a Bachelor'

  • Answered by AI
Round 2 - Behavioral 

(1 Question)

  • Q1. What is Budgeting and forcasting?
  • Ans. 

    Budgeting and forecasting are financial planning tools used to estimate future revenues and expenses.

    • Budgeting involves setting financial goals and creating a plan to achieve them.

    • Forecasting involves predicting future financial outcomes based on historical data and trends.

    • Budgeting helps in allocating resources effectively, while forecasting helps in making informed decisions.

    • Examples: Creating an annual budget for a ...

  • Answered by AI

Executive Accountant Interview Questions asked at other Companies

Q1. What is the file extension name which is created by the TDS Return software
View answer (4)

Accountant Interview Questions & Answers

user image Anonymous

posted on 27 Aug 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via LinkedIn

Round 1 - HR 

(2 Questions)

  • Q1. Work related questions
  • Q2. Basic questions to clarify the contents of resume
Round 2 - One-on-one 

(1 Question)

  • Q1. Extensive discussion about work experience

Accountant Interview Questions asked at other Companies

Q1. What journal is made when purchase requisition is created
View answer (26)

Director Interview Questions & Answers

user image Anonymous

posted on 25 Dec 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I appeared for an interview in Jun 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. How the projects were managed.
  • Ans. 

    Projects were managed through effective communication, detailed planning, and regular monitoring of progress.

    • Utilized project management software to track tasks and deadlines

    • Held regular team meetings to discuss progress and address any issues

    • Assigned clear roles and responsibilities to team members

    • Implemented risk management strategies to mitigate potential problems

    • Ensured stakeholders were kept informed of project st

  • Answered by AI
  • Q2. How the business can be grown?
  • Ans. 

    The business can be grown by expanding into new markets, developing new products/services, improving marketing strategies, and enhancing customer experience.

    • Expand into new markets by conducting market research and identifying opportunities for growth.

    • Develop new products/services based on customer feedback and market trends.

    • Improve marketing strategies by utilizing digital marketing tools, social media platforms, and ...

  • Answered by AI

Director Interview Questions asked at other Companies

Q1. On what basis would you enhance the pipeline products of the company?
View answer (2)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Previous experience
  • Q2. Valuation background
Round 2 - One-on-one 

(2 Questions)

  • Q1. How do you value real estate?
  • Ans. 

    Real estate valuation involves analyzing market trends, property characteristics, comparable sales, and income potential.

    • Consider market trends and economic conditions

    • Analyze property characteristics such as location, size, and condition

    • Look at comparable sales in the area to determine market value

    • Evaluate income potential for rental properties using methods like the income approach

    • Utilize valuation methods such as the...

  • Answered by AI
  • Q2. Previous experience?

Valuation Associate Interview Questions asked at other Companies

Q1. HOW D YOU CALCULATE BETA, AND HOW DO YOU LEVER AND UNLEVER IT
View answer (1)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. What methods do you use to track the progress of a project?
  • Ans. 

    I utilize various methods like Gantt charts, KPIs, and regular meetings to effectively track project progress.

    • Gantt Charts: Visual representation of the project timeline, showing tasks, durations, and dependencies.

    • Key Performance Indicators (KPIs): Metrics such as budget variance and schedule variance to assess project health.

    • Regular Status Meetings: Weekly or bi-weekly meetings with the team to discuss progress, chall...

  • Answered by AI
  • Q2. What are effective strategies for handling stakeholders and managing project risks?
  • Ans. 

    Effective stakeholder management and risk strategies are crucial for successful project delivery in civil engineering.

    • Identify stakeholders early: Create a stakeholder map to understand their influence and interest. For example, engage local communities in a housing project.

    • Establish clear communication: Use regular updates and feedback loops to keep stakeholders informed. For instance, hold monthly meetings with proje...

  • Answered by AI
  • Q3. What is the process for selecting vendors based on technical and commercial criteria to ensure timely commencement of work?
  • Ans. 

    Selecting vendors involves evaluating technical capabilities and commercial viability to ensure project timelines are met.

    • Define clear technical requirements based on project specifications.

    • Establish commercial criteria, including budget constraints and payment terms.

    • Conduct a pre-qualification process to shortlist vendors based on their experience and past performance.

    • Request detailed proposals from shortlisted vendor...

  • Answered by AI

Senior Civil Project Manager Interview Questions asked at other Companies

Q1. What is the process for selecting vendors based on technical and commercial criteria to ensure timely commencement of work?
View answer (1)

Cushman & Wakefield Interview FAQs

How many rounds are there in Cushman & Wakefield interview?
Cushman & Wakefield interview process usually has 2-3 rounds. The most common rounds in the Cushman & Wakefield interview process are Technical, Resume Shortlist and One-on-one Round.
How to prepare for Cushman & Wakefield interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Cushman & Wakefield. The most common topics and skills that interviewers at Cushman & Wakefield expect are Career Development, Agile Coaching, Facility Management, Project Management and Architecture.
What are the top questions asked in Cushman & Wakefield interview?

Some of the top questions asked at the Cushman & Wakefield interview -

  1. What kind of water proofing application are used on terrace roof slab of the co...read more
  2. What is the of floor to floor height of the Commercial building...read more
  3. Where construction joints provides for the stairc...read more
How long is the Cushman & Wakefield interview process?

The duration of Cushman & Wakefield interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Cushman & Wakefield Interview Process

based on 110 interviews

Interview experience

4.4
  
Good
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 367 Interviews
CBRE Interview Questions
4.2
 • 274 Interviews
Sobha Interview Questions
3.8
 • 136 Interviews
Lodha Group Interview Questions
4.0
 • 129 Interviews
Kalpataru Limited Interview Questions
4.1
 • 101 Interviews
DLF Interview Questions
3.9
 • 77 Interviews
Colliers India Interview Questions
3.9
 • 70 Interviews
Casagrand Interview Questions
3.8
 • 59 Interviews
View all

Cushman & Wakefield Reviews and Ratings

based on 1.3k reviews

4.1/5

Rating in categories

3.9

Skill development

4.0

Work-life balance

3.8

Salary

4.0

Job security

4.0

Company culture

3.4

Promotions

3.8

Work satisfaction

Explore 1.3k Reviews and Ratings
Senior Project Engineer

Mumbai

8-10 Yrs

₹ 4.9-8 LPA

Account Executive

Chennai

2-5 Yrs

₹ 1.5-4.25 LPA

Salesforce Technical Associate

Gurgaon / Gurugram,

Bangalore / Bengaluru

3-5 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
310 salaries
unlock blur

₹4 L/yr - ₹12.5 L/yr

Facility Executive
167 salaries
unlock blur

₹3 L/yr - ₹6.2 L/yr

Project Manager
137 salaries
unlock blur

₹8 L/yr - ₹20 L/yr

Shift Engineer
122 salaries
unlock blur

₹2.2 L/yr - ₹5.8 L/yr

Project Engineer
117 salaries
unlock blur

₹3.6 L/yr - ₹10 L/yr

Explore more salaries
Compare Cushman & Wakefield with

JLL

4.1
Compare

CBRE

4.2
Compare

Sobha

3.8
Compare

Lodha Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview