Filter interviews by
I applied via Walk-in and was interviewed before Nov 2023. There was 1 interview round.
Rate your
company
🤫 100% anonymous
How was your last interview experience?
I applied via LinkedIn and was interviewed in Nov 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
All group discussion job profile and job experience
Cushman & Wakefield interview questions for popular designations
I have experience in both the field and corporate office settings.
I have worked on various projects in the field, coordinating tasks and ensuring smooth operations.
I have also spent time in the corporate office, managing project documentation, scheduling meetings, and communicating with stakeholders.
In the field, I have supervised teams, conducted site visits, and resolved any issues that arose.
In the corporate office,...
Seeking new challenges and growth opportunities
Desire for professional development
Limited growth potential in current role
Looking for a more challenging and fulfilling position
Seeking a company with a better cultural fit
Relocation or personal reasons
Get interview-ready with Top Cushman & Wakefield Interview Questions
I applied via Walk-in and was interviewed before Dec 2022. There were 3 interview rounds.
HVAC stands for Heating, Ventilation, and Air Conditioning. UPS stands for Uninterruptible Power Supply. AHU stands for Air Handling Unit.
HVAC refers to the technology used for indoor environmental comfort, including heating, cooling, and air quality control.
UPS is a device that provides emergency power to a load when the input power source fails.
AHU is a device used to regulate and circulate air as part of a heating,
An air cold chiller is a device that cools air by removing heat from it.
An air cold chiller is commonly used in air conditioning systems to cool indoor spaces.
It works by circulating a refrigerant that absorbs heat from the air and then releases it outside.
The chilled air is then distributed through ducts or vents to cool the desired area.
Air cold chillers can be used in various settings such as homes, offices, hospita...
An AHU (Air Handling Unit) is a device used to regulate and circulate air as part of a heating, ventilation, and air conditioning (HVAC) system.
AHU is an abbreviation for Air Handling Unit.
It is a device used in HVAC systems to control and distribute air.
AHUs typically consist of a fan, heating and cooling coils, filters, and dampers.
They are responsible for conditioning and circulating air within a building.
AHUs can b...
LP stands for Low Pass and HP stands for High Pass.
LP (Low Pass) is a type of filter that allows low-frequency signals to pass through while attenuating high-frequency signals.
HP (High Pass) is a type of filter that allows high-frequency signals to pass through while attenuating low-frequency signals.
LP and HP filters are commonly used in audio systems to control the frequency range of the output signal.
LP filters are ...
A UPS (Uninterruptible Power Supply) is a device that provides emergency power to a load when the input power source fails.
UPS is used to protect critical equipment from power outages, voltage fluctuations, and other power-related issues.
It typically consists of a battery, an inverter, and a rectifier.
UPS can be used for various applications such as computers, data centers, hospitals, telecommunications, etc.
Examples o...
PAC stands for Programmable Automation Controller. It is a device used in industrial automation to control and monitor processes.
PAC is a type of controller used in industrial automation systems.
It is programmable and can be customized to control and monitor various processes.
PACs are often used in manufacturing plants, power plants, and other industrial settings.
They can communicate with other devices and systems to g...
A water cold chiller is a device that cools water by removing heat from it, typically used in air conditioning systems or industrial processes.
A water cold chiller uses a refrigeration cycle to cool water.
It consists of components such as a compressor, condenser, expansion valve, and evaporator.
The chiller circulates chilled water through a system to remove heat from the surroundings.
It is commonly used in air conditio...
ACB stands for Air Circuit Breaker and VCB stands for Vacuum Circuit Breaker.
ACB is a type of circuit breaker that uses air as the medium to extinguish the arc.
VCB is a type of circuit breaker that uses vacuum as the medium to extinguish the arc.
Both ACB and VCB are used for electrical circuit protection and can interrupt the flow of current in case of faults.
ACBs are commonly used in low voltage applications, while VC...
Precision air conditioning units are commonly used in server rooms.
Precision air conditioning units are designed to provide precise temperature and humidity control.
These units are capable of maintaining stable and optimal conditions for sensitive equipment like servers.
They often feature redundant systems for reliability and may include features like hot aisle/cold aisle containment.
Examples of precision air condition...
A CSU, or Channel Service Unit, is a device used in telecommunications to connect a digital line to a customer's equipment.
CSU stands for Channel Service Unit.
It is used in telecommunications to connect a digital line to a customer's equipment.
CSUs provide signal regeneration, line coding, and diagnostic capabilities.
They ensure reliable transmission of data over long distances.
Examples of CSUs include T1 CSUs, ISDN CS
I applied via Campus Placement
Normal aptitude test just go with your basic knowledge
Any recent topic they just want to know your knowledge and how open minded you are such that u can get the thing easily
I applied via LinkedIn and was interviewed before Apr 2023. There were 2 interview rounds.
Designing a metro line for a new station involves planning routes, considering passenger flow, and ensuring connectivity.
Conduct a feasibility study to determine the need for a new station
Consider factors such as population density, traffic patterns, and potential future growth
Plan the route to optimize connectivity with existing stations and transportation hubs
Design the station layout to accommodate passenger flow an...
I applied via Approached by Company and was interviewed in May 2022. There were 4 interview rounds.
I applied via LinkedIn and was interviewed before Jul 2022. There were 3 interview rounds.
Top trending discussions
The duration of Cushman & Wakefield interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 106 interviews
Interview experience
based on 1.2k reviews
Rating in categories
Assistant Manager
315
salaries
| ₹0 L/yr - ₹0 L/yr |
Facility Executive
175
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
128
salaries
| ₹0 L/yr - ₹0 L/yr |
Shift Engineer
122
salaries
| ₹0 L/yr - ₹0 L/yr |
Facility Manager
120
salaries
| ₹0 L/yr - ₹0 L/yr |
JLL
CBRE
Knight Frank
Colliers India