Upload Button Icon Add office photos

Cushman & Wakefield

Compare button icon Compare button icon Compare

Filter interviews by

Cushman & Wakefield Interview Questions, Process, and Tips

Updated 4 Jan 2025

Top Cushman & Wakefield Interview Questions and Answers

View all 50 questions

Cushman & Wakefield Interview Experiences

Popular Designations

77 interviews found

Project Coordinator Interview Questions & Answers

user image PRAJIN THUMBOLI

posted on 26 Apr 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Explain the processes involved in working with MS project
  • Q2. Explain project scheduling and costing
  • Ans. 

    Project scheduling involves creating a timeline for project tasks, while costing involves estimating the expenses associated with each task.

    • Project scheduling involves breaking down the project into tasks, determining the sequence of tasks, and assigning timeframes to each task.

    • Costing involves estimating the resources required for each task, including labor, materials, and equipment costs.

    • Project scheduling and costin...

  • Answered by AI
Round 2 - HR 

(3 Questions)

  • Q1. Explain why you want to work with C&W
  • Q2. Your expected salary package
  • Q3. Willing to relocate anywhere across India?

Top Cushman & Wakefield Project Coordinator Interview Questions and Answers

Q1. What kind of water proofing application are used on terrace roof slab of the commercial, residential buildings
View answer (6)

Project Coordinator Interview Questions asked at other Companies

Q1. What kind of water proofing application are used on terrace roof slab of the commercial, residential buildings
View answer (6)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Fire and safety
  • Q2. Health and safety equipment

Fire & Safety Officer Interview Questions asked at other Companies

Q1. 11. What type of PPE you are using in your current organisation?
View answer (3)

Assistant Manager Interview Questions & Answers

user image Gaurav Verma

posted on 15 Jun 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Check point of plastering
  • Ans. 

    Check point of plastering is a crucial step in ensuring a smooth and even finish on walls or ceilings.

    • Check for any uneven areas or bumps in the plaster surface

    • Ensure that the plaster is fully dried before proceeding to the next step

    • Use a straight edge or level to check for any dips or high spots in the plaster

    • Inspect the corners and edges for any rough or unfinished areas

    • Make sure to sand down any rough patches before

  • Answered by AI
  • Q2. Check points of water proofing.
  • Ans. 

    Check points of water proofing involves inspecting areas prone to water leakage and ensuring proper sealing and protection.

    • Inspecting roof for cracks or missing shingles

    • Checking windows and doors for gaps or faulty seals

    • Examining foundation for signs of water seepage

    • Testing waterproofing membranes in basements or bathrooms

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn basics of your work .

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (86)
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Eastbourne East coast
  • Q2. Easy basis of cost
  • Q3. What is the best regards Michael
  • Q4. English summary of the best way
  • Ans. 

    The best way to summarize a document in English

    • Identify key points and main ideas

    • Use concise language and avoid unnecessary details

    • Organize information in a logical order

    • Include a brief introduction and conclusion

    • Avoid plagiarism by using your own words

    • Proofread for errors and clarity

  • Answered by AI
  • Q5. Any ideas on share

Interview Preparation Tips

Interview preparation tips for other job seekers - Y

Import Documentation Executive Interview Questions asked at other Companies

Q1. How do you solve error occurred in work, with example?
View answer (1)

Cushman & Wakefield interview questions for popular designations

 Assistant Manager

 (6)

 Project Coordinator

 (6)

 Fire & Safety Officer

 (4)

 Assistant Project Manager

 (2)

 Executive Accountant

 (2)

 Manager

 (2)

 Project Engineer

 (2)

 Senior Project Engineer

 (2)

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. What is the HVAC System
  • Ans. 

    HVAC stands for Heating, Ventilation, and Air Conditioning system which is responsible for providing thermal comfort and acceptable indoor air quality.

    • HVAC system controls the temperature, humidity, and air quality in a building or vehicle.

    • It includes components such as furnaces, air conditioners, heat pumps, ductwork, and thermostats.

    • HVAC systems can be centralized or decentralized depending on the size and layout of ...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Why are you resign previous job
Round 3 - HR 

(1 Question)

  • Q1. Why i selected you

Electrical Shift Engineer Interview Questions asked at other Companies

Q1. what is difference between dry type and oil type
View answer (1)

Get interview-ready with Top Cushman & Wakefield Interview Questions

Electrician Interview Questions & Answers

user image Anonymous

posted on 11 Apr 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Sr.enjineer mock test

Round 2 - Technical 

(1 Question)

  • Q1. Ups safety realted Csu realted

Electrician Interview Questions asked at other Companies

Q1. 1. How much current takes a 5hp motor ?, 2. Draw a STAR DELTA and DOL starter control wireing. 3. How to connect star connection, and DELTA connectin. 4. What is the kw of 30hp motor ?, 5. Can you connect a temperature controller ?, 6. What... read more
View answer (5)

Jobs at Cushman & Wakefield

View all
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at National Institute of Construction Management and Research, Pune and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Be confident, knowledge is the key even if you speak better than the rest so keep reading.

Round 2 - Panel interview 

(1 Question)

  • Q1. Introduction & personal details

Interview Preparation Tips

Interview preparation tips for other job seekers - Be truthful, be confident, say no to things you don't know politely.

Top Cushman & Wakefield Project Coordinator Interview Questions and Answers

Q1. What kind of water proofing application are used on terrace roof slab of the commercial, residential buildings
View answer (6)

Project Coordinator Interview Questions asked at other Companies

Q1. What kind of water proofing application are used on terrace roof slab of the commercial, residential buildings
View answer (6)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. They asked about current project duties & responsibility how I manageing them
  • Q2. How to role to handle mep project excution
  • Ans. 

    To handle MEP project execution involves coordinating with various teams, ensuring timely completion, and adhering to quality standards.

    • Coordinate with design team, contractors, and suppliers to ensure smooth execution

    • Monitor progress regularly and address any issues or delays promptly

    • Ensure compliance with safety regulations and quality standards

    • Manage budget and resources effectively to meet project goals

    • Communicate ...

  • Answered by AI
  • Q3. They deeply asked how to performing with client and way to solve the issues
  • Q4. Why you interested to leave current organisation
  • Q5. Previous experience regarding last few employer

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (86)

Manager Interview Questions & Answers

user image Anonymous

posted on 23 Jun 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. About projects in previous company

Manager Interview Questions asked at other Companies

Q1. There is a chairman of a conglomerate. He has been on the post for 10 years, and is extremely dominating. He treats the various business heads like children, not letting them take any major decision. While the chairman has negatives, he bel... read more
View answer (2)

Assistant Manager - MEP Interview Questions & Answers

user image Shahill Dev Singh Suswal

posted on 30 Apr 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Initially interview was done by Cushman team that was with respect to technical and after that HR related
  • Q2. Related to MEPF work, like sprinkler and hydrant system, Electrical HT, LT and ELV system, HVAC and WMS
Round 2 - Client Interview 

(1 Question)

  • Q1. Detailed interview for MEPF profile, I was supposed to be join as MEP manager at their project. Asked about complete stages of green field projects for different categories of work. Interview lasted for 1....

Interview Preparation Tips

Topics to prepare for Cushman & Wakefield Assistant Manager - MEP interview:
  • Fire Fighting
  • Electrical HT system
  • ELV
  • LT Panels
  • Pump room
Interview preparation tips for other job seekers - In PMC job's, finalization of candidatures will be done by client.
Detailed interview has been done from client side as compared to C&W team.
Be confident and genuine while answering the questions.

Assistant Manager - MEP Interview Questions asked at other Companies

Q1. What are capacities of pumps and their applications in your experience especially for FIRE FIGHTING.
View answer (2)

Cushman & Wakefield Interview FAQs

How many rounds are there in Cushman & Wakefield interview?
Cushman & Wakefield interview process usually has 2-3 rounds. The most common rounds in the Cushman & Wakefield interview process are Technical, Resume Shortlist and One-on-one Round.
How to prepare for Cushman & Wakefield interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Cushman & Wakefield. The most common topics and skills that interviewers at Cushman & Wakefield expect are Career Development, Agile Coaching, Facility Management, Project Management and Agile.
What are the top questions asked in Cushman & Wakefield interview?

Some of the top questions asked at the Cushman & Wakefield interview -

  1. What kind of water proofing application are used on terrace roof slab of the co...read more
  2. What is the of floor to floor height of the Commercial building...read more
  3. Where construction joints provides for the stairc...read more
How long is the Cushman & Wakefield interview process?

The duration of Cushman & Wakefield interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Cushman & Wakefield Interview Process

based on 105 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 348 Interviews
CBRE Interview Questions
4.2
 • 262 Interviews
Sobha Interview Questions
3.9
 • 127 Interviews
Lodha Group Interview Questions
4.0
 • 124 Interviews
Colliers India Interview Questions
3.9
 • 63 Interviews
Knight Frank Interview Questions
4.1
 • 44 Interviews
Savills Interview Questions
4.0
 • 12 Interviews
View all

Cushman & Wakefield Reviews and Ratings

based on 1.2k reviews

4.2/5

Rating in categories

3.9

Skill development

4.0

Work-life balance

3.8

Salary

4.0

Job security

4.0

Company culture

3.4

Promotions

3.8

Work satisfaction

Explore 1.2k Reviews and Ratings
Front Office Executive

Pune

1-5 Yrs

₹ 1-3 LPA

Facility Manager Technical

Hyderabad / Secunderabad

8-10 Yrs

₹ 8-10 LPA

Facility Executive-Technical

Hyderabad / Secunderabad

3-4 Yrs

₹ 4-5 LPA

Explore more jobs
Assistant Manager
316 salaries
unlock blur

₹3.6 L/yr - ₹14 L/yr

Facility Executive
175 salaries
unlock blur

₹2.7 L/yr - ₹6.2 L/yr

Project Manager
128 salaries
unlock blur

₹8 L/yr - ₹17.2 L/yr

Shift Engineer
122 salaries
unlock blur

₹2.2 L/yr - ₹5.8 L/yr

Project Engineer
120 salaries
unlock blur

₹3.3 L/yr - ₹10.8 L/yr

Explore more salaries
Compare Cushman & Wakefield with

JLL

4.1
Compare

CBRE

4.2
Compare

Knight Frank

4.0
Compare

Colliers India

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview