Upload Button Icon Add office photos

Filter interviews by

Consolidated Construction Consortium Senior Manager Project Management Interview Questions and Answers

Updated 6 Sep 2022

Consolidated Construction Consortium Senior Manager Project Management Interview Experiences

1 interview found

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is your work experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Tell frankly where u have worked earlier

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. General Introduction
  • Q2. Questions related to previous experience
  • Q3. MS Project questions
  • Q4. Contract Management
  • Q5. Earned value management
  • Q6. Concrete technology, IS codes, mix design,productivity analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions from basics to detailed were asked
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Why do you want to join SYSTRA
Round 2 - One-on-one 

(1 Question)

  • Q1. What is baseline schedule
  • Ans. 

    Baseline schedule is the original project schedule that serves as a reference point for measuring progress and performance.

    • Baseline schedule is the initial approved project schedule that includes planned start and end dates for each task.

    • It is used as a benchmark to compare actual progress and performance against the planned schedule.

    • Any changes to the schedule must be documented and justified against the baseline sche...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2019. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical questions related to work
  • Q2. Previous job experiences
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Past Experience & Salary Negotiations

Interview Preparation Tips

Interview preparation tips for other job seekers - Clarity on Project & Job Responsibility for your Valuable Guidance

I applied via Naukri.com and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What you are change job What ia your salary expectation
  • Ans. 

    I am changing jobs to seek new challenges and opportunities for growth.

    • Seeking new challenges and opportunities for growth

    • Looking for a more fulfilling role

    • Wanting to work in a different environment or industry

    • Desire for better work-life balance

    • Wishing to relocate to a different city or country

  • Answered by AI
Round 3 - Technical 

(3 Questions)

  • Q1. What is rcc grade m25
  • Ans. 

    RCC grade M25 is a concrete mix design ratio used in construction.

    • RCC stands for Reinforced Cement Concrete.

    • M25 is the compressive strength of the concrete after 28 days of curing.

    • The mix design ratio for M25 is 1:1:2 (cement:sand:aggregate).

    • It is commonly used in the construction of buildings, bridges, and other structures.

    • M25 grade concrete is suitable for moderate exposure conditions.

  • Answered by AI
  • Q2. Do you know bbs making
  • Ans. 

    Yes, I know bbs making.

    • BBS stands for Bar Bending Schedule, which is a document that provides details of reinforcement steel bars required for construction.

    • BBS making involves preparing the schedule by calculating the required length, weight, and number of bars for each structural element.

    • It is an important task for ensuring the strength and durability of the structure.

    • BBS making requires knowledge of engineering drawi...

  • Answered by AI
  • Q3. Do you know estimation
  • Ans. 

    Yes, estimation is a crucial aspect of project management civil.

    • Estimation involves predicting the cost, time, and resources required for a project.

    • It is important to have accurate estimations to ensure the project stays within budget and on schedule.

    • Estimation techniques include top-down, bottom-up, and parametric estimation.

    • Factors such as project scope, complexity, and risk must be considered when making estimations...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be positive towards interview always speak truth to interview regarding experience
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Related to the electro mechanical field.
Round 2 - HR 

(1 Question)

  • Q1. Remuneration, benifits, insurance and other facilities.
Round 3 - One-on-one 

(1 Question)

  • Q1. Confidence test regarding the position of appointment.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be smart and confident. Don't make arrangements in the unknown fields.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Please introduce yourself
  • Q2. About your job experience
  • Q3. What do you understand by planning & different level of plans.
  • Ans. 

    Planning involves setting goals and determining the actions needed to achieve those goals. Different levels of plans include strategic, tactical, and operational plans.

    • Planning is the process of setting goals and determining the actions needed to achieve those goals.

    • Different levels of plans include strategic plans, which are long-term and set the overall direction of the organization.

    • Tactical plans are medium-term pla...

  • Answered by AI
  • Q4. Project specific questions
  • Q5. How early can you join us

Interview Preparation Tips

Interview preparation tips for other job seekers - Have a browse through your experience mentioned on cv. Learn about company & it's past & recent projects
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Types of cement and density?
  • Ans. 

    Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement. Density varies depending on the type of cement.

    • Types of cement: Portland cement, rapid-hardening cement, sulfate-resistant cement

    • Density varies based on the type of cement

    • Portland cement is the most common type used in construction projects

  • Answered by AI
  • Q2. Density of sleeper's in one km?
  • Ans. 

    The density of sleepers in one km can vary depending on the context, such as whether it refers to railway sleepers or people sleeping outdoors.

    • Density of railway sleepers in one km can vary based on the type of track and spacing between sleepers.

    • Density of people sleeping outdoors in one km would depend on the location and circumstances.

    • For example, in a homeless encampment, the density of sleepers in one km might be h...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About work experience only
  • Q2. Work related target achievement

Interview Preparation Tips

Interview preparation tips for other job seekers - Concentrate on work experience & some codes of work..

Consolidated Construction Consortium Interview FAQs

How many rounds are there in Consolidated Construction Consortium Senior Manager Project Management interview?
Consolidated Construction Consortium interview process usually has 2 rounds. The most common rounds in the Consolidated Construction Consortium interview process are Resume Shortlist and Technical.

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 700 Interviews
Tata Projects Interview Questions
4.2
 • 406 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
GMR Group Interview Questions
4.1
 • 76 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 64 Interviews
View all
Civil Site Engineer
48 salaries
unlock blur

₹2 L/yr - ₹5.2 L/yr

Assistant Engineer
46 salaries
unlock blur

₹2.4 L/yr - ₹4.6 L/yr

Site Engineer
31 salaries
unlock blur

₹1 L/yr - ₹5 L/yr

Assistant Engineer - Civil
29 salaries
unlock blur

₹2.2 L/yr - ₹4.3 L/yr

Safety Engineer
19 salaries
unlock blur

₹1.8 L/yr - ₹6.7 L/yr

Explore more salaries
Compare Consolidated Construction Consortium with

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview