Baseline schedule is the original project schedule that serves as a reference point for measuring progress and performance.
Baseline schedule is the initial approved project schedule that includes planned start and end dates for each task.
It is used as a benchmark to compare actual progress and performance against the planned schedule.
Any changes to the schedule must be documented and justified against the baseline sche...
posted on 17 Feb 2020
I applied via Company Website and was interviewed before Feb 2019. There were 2 interview rounds.
posted on 22 Mar 2024
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
posted on 19 Nov 2022
I applied via Naukri.com and was interviewed in Oct 2022. There were 3 interview rounds.
I am changing jobs to seek new challenges and opportunities for growth.
Seeking new challenges and opportunities for growth
Looking for a more fulfilling role
Wanting to work in a different environment or industry
Desire for better work-life balance
Wishing to relocate to a different city or country
RCC grade M25 is a concrete mix design ratio used in construction.
RCC stands for Reinforced Cement Concrete.
M25 is the compressive strength of the concrete after 28 days of curing.
The mix design ratio for M25 is 1:1:2 (cement:sand:aggregate).
It is commonly used in the construction of buildings, bridges, and other structures.
M25 grade concrete is suitable for moderate exposure conditions.
Yes, I know bbs making.
BBS stands for Bar Bending Schedule, which is a document that provides details of reinforcement steel bars required for construction.
BBS making involves preparing the schedule by calculating the required length, weight, and number of bars for each structural element.
It is an important task for ensuring the strength and durability of the structure.
BBS making requires knowledge of engineering drawi...
Yes, estimation is a crucial aspect of project management civil.
Estimation involves predicting the cost, time, and resources required for a project.
It is important to have accurate estimations to ensure the project stays within budget and on schedule.
Estimation techniques include top-down, bottom-up, and parametric estimation.
Factors such as project scope, complexity, and risk must be considered when making estimations...
posted on 23 Jan 2023
I applied via Referral and was interviewed in Jul 2022. There were 3 interview rounds.
posted on 10 May 2024
I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.
Planning involves setting goals and determining the actions needed to achieve those goals. Different levels of plans include strategic, tactical, and operational plans.
Planning is the process of setting goals and determining the actions needed to achieve those goals.
Different levels of plans include strategic plans, which are long-term and set the overall direction of the organization.
Tactical plans are medium-term pla...
posted on 19 Jun 2022
I applied via Walk-in and was interviewed in Aug 2022. There was 1 interview round.
Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement. Density varies depending on the type of cement.
Types of cement: Portland cement, rapid-hardening cement, sulfate-resistant cement
Density varies based on the type of cement
Portland cement is the most common type used in construction projects
The density of sleepers in one km can vary depending on the context, such as whether it refers to railway sleepers or people sleeping outdoors.
Density of railway sleepers in one km can vary based on the type of track and spacing between sleepers.
Density of people sleeping outdoors in one km would depend on the location and circumstances.
For example, in a homeless encampment, the density of sleepers in one km might be h...
posted on 16 Jan 2023
I applied via Company Website and was interviewed in Jul 2022. There were 2 interview rounds.
Civil Site Engineer
48
salaries
| ₹2 L/yr - ₹5.2 L/yr |
Assistant Engineer
46
salaries
| ₹2.4 L/yr - ₹4.6 L/yr |
Site Engineer
31
salaries
| ₹1 L/yr - ₹5 L/yr |
Assistant Engineer - Civil
29
salaries
| ₹2.2 L/yr - ₹4.3 L/yr |
Safety Engineer
19
salaries
| ₹1.8 L/yr - ₹6.7 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Tata Projects
Hindustan Construction Company