Upload Button Icon Add office photos

Filter interviews by

Consolidated Construction Consortium Civil Engineer-Highway/Roadway Interview Questions and Answers

Updated 22 Jul 2021

Consolidated Construction Consortium Civil Engineer-Highway/Roadway Interview Experiences

1 interview found

Interview Questionnaire 

4 Questions

  • Q1. Types of cement grade
  • Ans. 

    There are different types of cement grades used in construction, each with specific properties and applications.

    • Ordinary Portland Cement (OPC) is the most commonly used cement grade.

    • Portland Pozzolana Cement (PPC) contains pozzolanic materials like fly ash, which enhances its strength and durability.

    • Rapid Hardening Cement (RHC) gains strength quickly and is used in situations where early strength is required.

    • Low Heat C...

  • Answered by AI
  • Q2. Tests of aggregate
  • Ans. 

    Tests of aggregate in civil engineering are important to ensure quality and durability of roadways.

    • Aggregate tests include sieve analysis, specific gravity, absorption, and abrasion resistance.

    • Sieve analysis determines the particle size distribution of the aggregate.

    • Specific gravity measures the density of the aggregate compared to water.

    • Absorption measures the amount of water absorbed by the aggregate.

    • Abrasion resista...

  • Answered by AI
  • Q3. What is CBR test
  • Ans. 

    CBR test is a measure of soil strength and bearing capacity.

    • CBR stands for California Bearing Ratio.

    • It is a penetration test that measures the strength of soil and its ability to bear loads.

    • The test involves compacting soil into a mold and measuring the force required to penetrate it with a plunger.

    • The ratio of the force required to penetrate the soil to the force required to penetrate a standard material is the CBR va...

  • Answered by AI
  • Q4. Text

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Technical questions based on the highway engineering
Round 2 - HR 

(1 Question)

  • Q1. Salary negotiation round

Interview Preparation Tips

Interview preparation tips for other job seekers - If your basics are clear, the chances of selection is high. At assistant level (exp 2-5) they dont go deep in the softwares.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2023. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Gragation. + I.T.I
  • Q2. Electrician Sivil
Round 3 - Technical 

(1 Question)

  • Q1. G.s.b work in highway 3D sistem (Trimble) Work experience 3 year Present time job assistant surveyor Ashoka buildcon Railway project in Chasma Gujarat
  • Ans. 

    Yes, I have 3 years of experience working with G.s.b in highway 3D system (Trimble) as an assistant surveyor on a railway project in Chasma, Gujarat.

    • Experience working with G.s.b in highway 3D system (Trimble) for 3 years

    • Currently working as an assistant surveyor at Ashoka Buildcon on a railway project in Chasma, Gujarat

  • Answered by AI
Round 4 - Technical 

(1 Question)

  • Q1. ITI pass NCVT
Round 5 - Technical 

(2 Questions)

  • Q1. ITI pass NCVT 2 year
  • Q2. G s b work experience highway
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is Grade of GSB that Your Previous Site.
  • Ans. 

    The Grade of GSB at my previous site was 40 mm.

    • The Grade of GSB at my previous site was 40 mm.

    • GSB stands for Granular Sub Base.

    • The thickness of GSB is usually specified in millimeters.

    • GSB is a layer of compacted granular material used as a base for asphalt, concrete, or other paving materials.

  • Answered by AI
  • Q2. Tolerances Realted about base coarse,sub- base Coarse.
  • Ans. 

    Tolerances in base and sub-base coarse materials are critical for ensuring proper compaction and stability of the highway.

    • Tolerances for base coarse typically range from +/- 20mm to +/- 40mm depending on the specified thickness.

    • Tolerances for sub-base coarse are usually wider, ranging from +/- 50mm to +/- 100mm.

    • Proper compaction is essential to meet these tolerances and ensure the structural integrity of the highway.

    • To...

  • Answered by AI
  • Q3. Difference between MDD and FDD
  • Ans. 

    MDD is Maximum Dry Density, FDD is Field Dry Density. MDD is the maximum density achieved by compacting soil in the lab, FDD is the density achieved in the field after compaction.

    • MDD is determined through laboratory tests using standard compaction methods.

    • FDD is measured in the field using a nuclear density gauge or sand cone method.

    • MDD is used to determine the optimum moisture content for compaction.

    • FDD helps in asses...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for H.G. Infra Engineering Highway Site Engineer interview:
  • Morth
  • Is code
Interview preparation tips for other job seekers - Be confident,always Stick at one answer and Some brief knowledge about your Resume Or CV.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. WMM full form ...
  • Ans. 

    WMM stands for Wet Mix Macadam, which is a type of road construction method using a mixture of aggregates and water.

    • WMM is a type of road construction method used for laying base and sub-base layers of roads.

    • It involves mixing aggregates like stone, sand, and gravel with water to form a strong base.

    • WMM is often used in highway construction to provide a stable foundation for the road surface.

    • The mixture is compacted usi...

  • Answered by AI
  • Q2. GSB material name
  • Ans. 

    GSB material name refers to the type of material used in construction and maintenance of highways.

    • GSB stands for Granular Sub Base

    • Common materials used for GSB include crushed stone, gravel, and sand

    • GSB material is compacted to provide a stable foundation for the road surface

  • Answered by AI

I applied via Referral and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. How much quantity 1 roller can compact in one day?
  • Ans. 

    The quantity of material a roller can compact in one day depends on various factors.

    • The type and size of the roller will affect its compaction capacity.

    • The type and condition of the material being compacted will also impact the quantity that can be compacted.

    • The speed and efficiency of the operator operating the roller can influence the daily compaction quantity.

    • Environmental factors such as weather conditions and terr...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - See there are lots of questions relating to highway construction. But the interviewers mostly focus on your ability to handle pressure, your basic knowledge about execution process like if you have to lay GSB, WMM or DBM etc then what will be your prior preparations and what all the equipment you'll need for your particular work? Also what will you do if you do not achieve your goal ( like quantity) for the day? Engineering Properties of Soil, GSB, WMM, DLC, PQC, DBM, BC, Bitumen, Cement etc. Test done at site as well as in laboratory. Quantity required for particular work.

Interview Questionnaire 

2 Questions

  • Q1. PQC , DLC Earth work is done
  • Q2. GSB ka full farm

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview is done all the best
Round 1 - Group Discussion 

No GD

Round 2 - One-on-one 

(1 Question)

  • Q1. Base question for civil

Interview Preparation Tips

Interview preparation tips for other job seekers - Input requirements is fix for all yes
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I was interviewed in Oct 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Gragation. + I.T.I
Round 3 - Technical 

(1 Question)

  • Q1. G.s.b work in highway 3D sistem (Trimble) Work experience 3 year Present time job assistant surveyor Ashoka buildcon Railway project in Chasma Gujarat
  • Ans. 

    Yes, I have 3 years of experience working with G.s.b in highway 3D system (Trimble) as an assistant surveyor at Ashoka Buildcon on a railway project in Chasma, Gujarat.

    • 3 years of experience working with G.s.b in highway 3D system (Trimble)

    • Current job as an assistant surveyor at Ashoka Buildcon

    • Working on a railway project in Chasma, Gujarat

  • Answered by AI
Round 4 - Technical 

(1 Question)

  • Q1. ITI pass NCVT
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. They ask whatever you did in your previous job
  • Ans. Just elaborate your work on your current job in a technical way.
  • Answered by Abhijeet Tiwari
Round 3 - HR 

(1 Question)

  • Q1. It was just salary negotiation.
  • Ans. They negotiate like they are buying vegetables so don't decrease your expectation, keep rigid on the salary you expecting. If they need, they will hire definitely.
  • Answered by Abhijeet Tiwari

Consolidated Construction Consortium Interview FAQs

What are the top questions asked in Consolidated Construction Consortium Civil Engineer-Highway/Roadway interview?

Some of the top questions asked at the Consolidated Construction Consortium Civil Engineer-Highway/Roadway interview -

  1. Types of cement gr...read more
  2. What is CBR t...read more
  3. Tests of aggreg...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 731 Interviews
Tata Projects Interview Questions
4.2
 • 420 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
Ashoka Buildcon Interview Questions
4.0
 • 64 Interviews
View all

Consolidated Construction Consortium Civil Engineer-Highway/Roadway Reviews and Ratings

based on 1 review

1.0/5

Rating in categories

3.0

Skill development

2.0

Work-life balance

1.0

Salary

5.0

Job security

3.0

Company culture

4.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
48 salaries
unlock blur

₹2 L/yr - ₹5.2 L/yr

Assistant Engineer
46 salaries
unlock blur

₹2.4 L/yr - ₹4.6 L/yr

Assistant Engineer - Civil
29 salaries
unlock blur

₹2.2 L/yr - ₹4.3 L/yr

Site Engineer
25 salaries
unlock blur

₹1.4 L/yr - ₹5 L/yr

Safety Engineer
19 salaries
unlock blur

₹1.8 L/yr - ₹6.7 L/yr

Explore more salaries
Compare Consolidated Construction Consortium with

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview