Filter interviews by
I applied via Referral and was interviewed in May 2024. There was 1 interview round.
Top trending discussions
My name is John Smith.
Full name is John Smith
Common name in English-speaking countries
No middle name or initial
I have 5 years of experience in design engineering.
5 years of experience in design engineering
Proficient in CAD software such as AutoCAD and SolidWorks
Experience in product development and prototyping
Strong understanding of engineering principles and materials
Collaborated with cross-functional teams to bring projects to completion
I applied via Campus Placement and was interviewed in Aug 2024. There was 1 interview round.
Question where asked from trains,permutation and some grammer
posted on 3 Jun 2024
Easier than many others
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
I applied via Referral and was interviewed in Nov 2023. There was 1 interview round.
Pipe wall thickness can be calculated using various methods based on the material, pressure, and temperature of the pipe.
Calculate using Barlow's formula: t = PD/(2S - 0.8P)
Consider factors like material properties, pressure, temperature, and safety factor
Consult relevant codes and standards for specific calculations
Use software tools like CAESAR II for complex piping systems
I applied via Approached by Company and was interviewed before Dec 2023. There were 2 interview rounds.
A treatment plant is a facility where wastewater is treated to remove contaminants before being discharged back into the environment.
Treatment plants use a combination of physical, chemical, and biological processes to remove pollutants from wastewater.
Common processes in treatment plants include screening, sedimentation, filtration, and disinfection.
Examples of treatment plants include sewage treatment plants, water t...
I applied via Walk-in and was interviewed in Jul 2022. There were 2 interview rounds.
A pipe rack is a structure used to support pipes and other equipment in a plant or industrial facility.
Pipe racks are typically made of steel and are designed to withstand the weight of the pipes and equipment they support.
They are used to organize and route pipes throughout a facility, allowing for easy access and maintenance.
Pipe racks can be located indoors or outdoors, and can be designed to accommodate a variety o...
Headroom clearance is the vertical distance between the highest point of a piping system and the ceiling or any obstruction above it.
Headroom clearance is important to ensure safe and efficient installation and maintenance of piping systems.
It is typically specified in building codes and industry standards.
The required headroom clearance may vary depending on the type of piping system and its location.
For example, a st...
posted on 23 Apr 2021
I applied via Referral and was interviewed in Dec 2021. There were 4 interview rounds.
based on 17 reviews
Rating in categories
Engineer 1
264
salaries
| ₹1.5 L/yr - ₹5.5 L/yr |
L2 Engineer
234
salaries
| ₹3.4 L/yr - ₹9 L/yr |
Design Engineer
197
salaries
| ₹2.4 L/yr - ₹6.5 L/yr |
Osp Design Engineer
104
salaries
| ₹2.7 L/yr - ₹7.2 L/yr |
OSP Engineer
73
salaries
| ₹2.8 L/yr - ₹6.5 L/yr |
Sterlite Technologies
Larsen & Toubro Limited
Tata Communications
Bharti Airtel