Filter interviews by
I applied via Referral and was interviewed before Nov 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.
I have 5 years of experience in the telecom industry.
Worked as a network engineer for a major telecom company
Managed and maintained network infrastructure
Implemented new technologies such as 5G and VoLTE
Troubleshot and resolved network issues
Collaborated with cross-functional teams to ensure smooth operations
Software used in FTTx design
AutoCAD for creating network diagrams
Geographic Information System (GIS) for mapping
Optical Network Design and Planning (ONDAP) for fiber optic network planning
FiberPlanIT for designing and optimizing FTTx networks
Google Earth for visualizing network routes
Bentley Fiber for designing and documenting fiber networks
Top trending discussions
I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.
Regarding RDSS Projects
The percentage of steel in a pile varies depending on the type and design of the pile.
The percentage of steel in a pile can range from 0% to over 90%.
The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.
Steel piles typically have a higher percentage of steel than other types of piles.
The percentage of steel in a pile can also affect its
Pile built-up above cut off level as per IS code
IS code specifies the maximum allowable pile length above cut off level
Pile length above cut off level should not exceed 3 times the pile diameter
Built-up pile above cut off level can cause structural instability and failure
Vertical tolerance for piles as per IS code
As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm
This tolerance is applicable for both driven and cast-in-situ piles
The tolerance is measured at the top of the pile and at intervals of 3m along the length
If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken
Pile concrete consumption tolerance depends on various factors.
Pile diameter and length
Concrete mix design
Placement method
Quality control measures
Environmental conditions
Tolerance typically ranges from 5-10% of estimated consumption
Regular monitoring and adjustment of concrete consumption is necessary
Unit weight of steel is 7850 kg/m³
The unit weight of steel is the weight of a specific volume of steel
It is measured in kilograms per cubic meter (kg/m³)
The unit weight of steel is 7850 kg/m³
This value may vary slightly depending on the composition and manufacturing process of the steel
I applied via Naukri.com and was interviewed before Apr 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Mar 2022. There were 3 interview rounds.
I applied via Referral and was interviewed in Oct 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed before Jul 2023. There was 1 interview round.
based on 3 interviews
Interview experience
based on 54 reviews
Rating in categories
Engineer 1
283
salaries
| ₹2.4 L/yr - ₹5.2 L/yr |
Design Engineer
205
salaries
| ₹2.4 L/yr - ₹6.4 L/yr |
L2 Engineer
195
salaries
| ₹3.4 L/yr - ₹8 L/yr |
Osp Design Engineer
77
salaries
| ₹3.4 L/yr - ₹7.5 L/yr |
OSP Engineer
76
salaries
| ₹2.8 L/yr - ₹6.5 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon