I applied via Campus Placement and was interviewed before Oct 2022. There were 4 interview rounds.
Basic apti questions
I applied via Campus Placement and was interviewed before Jul 2022. There were 4 interview rounds.
General aptitude and decision making
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
Congruex Asia Pacific interview questions for designations
Top trending discussions
I applied via Naukri.com and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed before Oct 2019. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Jan 2020. There were 4 interview rounds.
The percentage of steel in a pile varies depending on the type and design of the pile.
The percentage of steel in a pile can range from 0% to over 90%.
The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.
Steel piles typically have a higher percentage of steel than other types of piles.
The percentage of steel in a pile can also affect its
Pile built-up above cut off level as per IS code
IS code specifies the maximum allowable pile length above cut off level
Pile length above cut off level should not exceed 3 times the pile diameter
Built-up pile above cut off level can cause structural instability and failure
Vertical tolerance for piles as per IS code
As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm
This tolerance is applicable for both driven and cast-in-situ piles
The tolerance is measured at the top of the pile and at intervals of 3m along the length
If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken
Pile concrete consumption tolerance depends on various factors.
Pile diameter and length
Concrete mix design
Placement method
Quality control measures
Environmental conditions
Tolerance typically ranges from 5-10% of estimated consumption
Regular monitoring and adjustment of concrete consumption is necessary
Unit weight of steel is 7850 kg/m³
The unit weight of steel is the weight of a specific volume of steel
It is measured in kilograms per cubic meter (kg/m³)
The unit weight of steel is 7850 kg/m³
This value may vary slightly depending on the composition and manufacturing process of the steel
Some of the top questions asked at the Congruex Asia Pacific OSP Engineer interview -
based on 3 interviews
Interview experience
based on 12 reviews
Rating in categories
Engineer 1
284
salaries
| ₹2.4 L/yr - ₹5.2 L/yr |
Design Engineer
207
salaries
| ₹2.4 L/yr - ₹6.4 L/yr |
L2 Engineer
199
salaries
| ₹3.4 L/yr - ₹8 L/yr |
Osp Design Engineer
77
salaries
| ₹3.4 L/yr - ₹7.5 L/yr |
OSP Engineer
76
salaries
| ₹2.8 L/yr - ₹6.5 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon