i
CJ Darcl Logistics Limited
Filter interviews by
General Aptitude consists of Maths, Eng, GK, Logical Reasoning.
I applied via Referral and was interviewed in Jan 2022. There were 2 interview rounds.
Top trending discussions
I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.
I am a recent graduate with a degree in Business Administration and a passion for leadership and problem-solving.
Graduated with a degree in Business Administration
Passionate about leadership and problem-solving
Completed internships in marketing and finance
Strong communication and organizational skills
posted on 30 Jul 2024
I applied via Company Website and was interviewed in Jun 2024. There were 3 interview rounds.
They take aptitude test their in which at the first page they ask different types of questions which is different for everyone , first question is mathematical and others will be general questions and at the second page they give a long mathematical questions
After that Hr round 1 to 2 Times than final round with Manager.
I am a recent graduate with a degree in Industrial Engineering and experience in project management and data analysis.
Recent graduate in Industrial Engineering
Experience in project management
Skilled in data analysis
Supporting industrial projects by assisting in planning, coordination, and execution.
Assist in project planning and scheduling
Coordinate with various teams and stakeholders
Help in executing project tasks and monitoring progress
Prepare reports and documentation
Troubleshoot issues and provide solutions
I am a dedicated and detail-oriented industrial project associate with a strong background in project management and problem-solving skills.
I have a Bachelor's degree in Industrial Engineering from XYZ University.
I have completed internships at ABC Company where I gained hands-on experience in project planning and execution.
I am proficient in using project management tools such as Microsoft Project and Trello.
I have ex...
Inco terms are international commercial terms that define the responsibilities of buyers and sellers in international trade transactions.
Inco terms are standardized terms used in international trade to clarify the roles and responsibilities of buyers and sellers.
They specify who is responsible for the cost of transportation, insurance, and customs duties.
Examples of common Inco terms include FOB (Free on Board), CIF (C...
Implemented a new inventory management system resulting in a 20% reduction in costs.
Successfully led a team to implement a new inventory management system
Resulted in a 20% reduction in costs for the company
Received recognition from senior management for the achievement
My strength is my ability to work well under pressure and meet deadlines. My weakness is that I can be overly critical of my own work.
Strength: Ability to work well under pressure
Strength: Meeting deadlines consistently
Weakness: Being overly critical of my own work
A Bill of Lading is a legal document issued by a carrier to a shipper, detailing the type, quantity, and destination of goods being carried.
It serves as a receipt for the goods being shipped.
It is also a contract of carriage between the shipper and the carrier.
It can be used as a document of title, allowing the goods to be transferred to another party.
Examples: Ocean Bill of Lading, Airway Bill, Truck Bill of Lading.
posted on 5 Aug 2024
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
Transformer oil is typically mineral oil, and efficient transformers are usually dry-type transformers.
Transformer oil is usually mineral oil, which acts as a coolant and insulator in transformers.
Efficient transformers are often dry-type transformers, which do not require oil for cooling.
Other types of transformer oils include silicone-based oils and bio-based oils.
Efficient transformers may also include amorphous cor
SLD (Single Line Diagram) shows the electrical connections from substation to room light.
Start with the substation as the power source
Draw a line representing the main distribution line
Include transformers, panels, switches, and cables
End with the room light as the final destination
The type of wiring used depends on the specific project requirements and regulations.
Consider the voltage requirements of the project
Choose between solid or stranded wire based on flexibility needs
Select the appropriate wire gauge for the current load
Follow local electrical codes and regulations
Examples: THHN wire for general wiring, Cat6 cable for networking projects
Layers of cable refer to the different levels of insulation and protection surrounding the core conductor.
Layers of cable provide insulation and protection for the core conductor.
Common layers include conductor, insulation, shielding, and jacket.
Examples of cables with multiple layers include coaxial cables and Ethernet cables.
Distribution boxes are used to distribute electrical power to different circuits or devices within a building.
Distribution boxes can be categorized based on the number of ways or circuits they can accommodate (e.g. 4-way, 8-way, 12-way)
They can also be classified based on the type of protection they offer (e.g. MCB distribution box, RCCB distribution box)
Distribution boxes can be surface-mounted or flush-mounted depend
SP stands for Schedule Performance, TPN stands for Total Planned Value, VTPN stands for Value of Total Planned Value
SP is a measure of how well the project is adhering to the schedule
TPN is the total budgeted cost of the work scheduled to be done
VTPN is the earned value of the work actually completed
The type of wire flexible depends on the material used and the intended application.
Different types of flexible wires include silicone wire, PVC wire, and Teflon wire.
The flexibility of a wire can be determined by its strand count and gauge.
Flexible wires are commonly used in industries like electronics, automotive, and robotics.
The Power triangle is a diagram used in project management to illustrate the relationship between scope, time, and cost.
The three sides of the triangle represent scope, time, and cost.
The triangle shows that changes in one aspect will affect the other two.
For example, increasing the scope of a project will likely lead to an increase in time and cost.
Conversely, reducing the time allocated to a project may require a red
Experienced project management professional with a proven track record of successfully leading cross-functional teams to deliver projects on time and within budget.
Over 5 years of experience in project management
Strong leadership and communication skills
Proficient in project management tools such as Microsoft Project and Jira
Managed multiple projects simultaneously, including a recent software implementation project fo
Copper is the most commonly used material in wire due to its high conductivity and affordability.
Copper is the most common material used in wire due to its high conductivity and affordability
Other materials used in wire include aluminum, silver, and gold
The choice of material depends on the specific application and requirements
Copper wiring typically uses copper with high conductivity, such as copper with a purity of 99.9% or higher.
Copper wiring commonly uses high-conductivity copper, such as ETP (Electrolytic Tough Pitch) copper.
Copper wiring may also use OFHC (Oxygen-Free High Conductivity) copper for applications requiring high purity.
Copper wiring with a purity of 99.9% or higher is often preferred for electrical conductivity.
Different ...
Power BI has two modes: Import mode and DirectQuery mode.
Import mode: Data is imported into Power BI and stored in a local cache for faster performance.
DirectQuery mode: Data stays in the original data source and queries are sent directly to the source for real-time data.
Import mode is suitable for smaller datasets while DirectQuery mode is better for larger datasets or when real-time data is needed.
Gateway setup and configuration involves connecting on-premises data sources to Power BI Service.
Install and configure the On-premises data gateway on a server within the network
Register the gateway in the Power BI Service
Create data source connections in Power BI Service using the gateway
Ensure proper network and firewall configurations for communication between Power BI Service and on-premises data sources
posted on 22 May 2024
Prioritize tasks, delegate when possible, communicate with team, take breaks to avoid burnout.
Prioritize tasks based on deadlines and importance.
Delegate tasks to team members if possible.
Communicate with team and supervisor about workload.
Take short breaks to avoid burnout and maintain productivity.
Maintaining work-life balance involves setting boundaries, prioritizing self-care, and practicing time management.
Set boundaries by establishing designated work hours and sticking to them
Prioritize self-care by making time for activities that bring you joy and relaxation
Practice time management by creating to-do lists and scheduling breaks throughout the day
Yes, I have knowledge about forklifts.
I am familiar with the operation and maintenance of forklifts.
I have received training on forklift safety procedures.
I understand the importance of proper load handling and stability.
I am aware of the potential hazards associated with forklift operations.
I can conduct inspections and identify any safety issues with forklifts.
I am knowledgeable about forklift regulations and standar...
Yes, I have conducted risk assessments before.
I have experience in identifying potential hazards and evaluating risks.
I have conducted risk assessments to ensure compliance with safety regulations.
I have used various tools and techniques such as checklists, inspections, and interviews to assess risks.
I have documented findings and recommended control measures to mitigate risks.
I have collaborated with teams to implemen...
Yes, I am familiar with the mock drill process.
A mock drill is a simulated emergency scenario to test the preparedness and response of individuals or organizations.
It helps identify strengths and weaknesses in emergency plans and procedures.
Mock drills can be conducted for various emergencies like fire, earthquake, chemical spills, etc.
The process involves planning, briefing participants, simulating the emergency, eval...
Yes, I have extensive experience in security management.
I have worked as a Security Manager for XYZ Company for the past 5 years.
During my tenure, I successfully implemented and maintained security protocols and procedures.
I conducted regular risk assessments and developed strategies to mitigate potential security threats.
I trained and supervised security personnel, ensuring their adherence to safety protocols.
I also c...
Some of the top questions asked at the CJ Darcl Logistics Limited interview for freshers -
The duration of CJ Darcl Logistics Limited interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 456 reviews
Rating in categories
Delhi ncr,
New Delhi
+15-8 Yrs
₹ 15-18 LPA
Assistant Manager
104
salaries
| ₹3 L/yr - ₹9 L/yr |
Assistant Officer
60
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Computer Operator
46
salaries
| ₹1.6 L/yr - ₹3.5 L/yr |
Senior Officer
38
salaries
| ₹2.3 L/yr - ₹4.8 L/yr |
Manager
32
salaries
| ₹5 L/yr - ₹14 L/yr |
Tiger Logistics India
Sical Logistics
Allcargo Logistics
GATI-KWE