Hi this sudhir here a diploma holder in civil high rise building construction .I know the grade of concrete for building construction and finishing work knowledge also I have.
Admixtures are added to concrete to improve its properties and performance.
Admixtures enhance the workability and durability of concrete.
They can reduce the water content required for a given slump, making the concrete more cohesive.
Admixtures can accelerate or retard the setting time of concrete.
They improve the strength, durability, and resistance to chemical attack of concrete.
Examples of admixtures include water re...
M25 cube strength refers to the compressive strength of concrete with a mix ratio of 1:1:2.
M25 cube strength is a measure of the ability of concrete to withstand compression.
It is denoted by the characteristic strength of a concrete cube tested at 28 days.
M25 grade concrete has a mix ratio of 1:1:2 (cement:sand:aggregate).
The cube strength of M25 concrete is typically around 25 MPa or 3625 psi.
It is important for struc...
I applied via Approached by company and was interviewed in Jan 2022. There were 4 interview rounds.
Engineering paper of concrete related and other subjects.
I applied via Job Portal and was interviewed before May 2023. There was 1 interview round.
The minimum grade of concrete for RCC is M20.
Minimum grade of concrete for RCC is M20
Higher grades like M25, M30, M35, etc. can also be used depending on the structural requirements
The grade of concrete indicates the compressive strength of the concrete mix
B. G. Shirke Construction Technology interview questions for popular designations
I applied via Naukri.com and was interviewed in Feb 2022. There were 3 interview rounds.
Get interview-ready with Top B. G. Shirke Construction Technology Interview Questions
I applied via Walk-in and was interviewed before Apr 2022. There were 4 interview rounds.
The candidate should provide their current CTC document and expected CTC.
The candidate should have a current CTC document that shows their current salary.
The candidate should also provide their expected CTC, which is the salary they are looking for in the new position.
The expected CTC should be based on factors such as the candidate's experience, skills, and the market rate for the position.
The candidate can mention an...
I applied via Walk-in and was interviewed before Jul 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Feb 2022. There were 3 interview rounds.
Basic questions related quality control
Shuttering requirement can be calculated by determining the surface area to be covered and the type of material to be used.
Calculate the surface area of the structure to be shuttered
Determine the type and size of the material to be used for shuttering
Consider the number of repetitions of the same type of shuttering required for the project
Factor in any additional requirements such as corners, edges, or special shapes
Ca...
Target strength is the minimum strength required for a concrete mix to achieve its intended purpose.
Target strength is determined based on the type of structure and its intended use.
Different types of concrete codes related to target strength include ACI 318, BS 8110, and IS 456.
Target strength is typically expressed in terms of compressive strength, measured in pounds per square inch (psi) or megapascals (MPa).
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There was 1 interview round.
To decrease expenditure cost of machinery, focus on optimizing maintenance, improving energy efficiency, and streamlining production processes.
Implement preventive maintenance programs to reduce breakdowns and costly repairs.
Optimize energy consumption by using energy-efficient equipment and technologies.
Streamline production processes to minimize waste and increase productivity.
Invest in automation and robotics to red...
The number of counter weights available for a rope suspended platform varies depending on the specific design and requirements.
The number of counter weights is determined by factors such as the weight capacity of the platform, the length of the platform, and the load distribution.
Typically, rope suspended platforms require multiple counter weights to balance the weight of the platform and the load being lifted.
The coun...
The duration of B. G. Shirke Construction Technology interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 30 interviews
Interview experience
based on 499 reviews
Rating in categories
Junior Engineer Civil
316
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
177
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
98
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer - Civil
87
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
75
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company