Upload Button Icon Add office photos

Filter interviews by

B. G. Shirke Construction Technology Interview Questions, Process, and Tips

Updated 29 Jul 2024

Top B. G. Shirke Construction Technology Interview Questions and Answers

View all 25 questions

B. G. Shirke Construction Technology Interview Experiences

Popular Designations

35 interviews found

BG SHIRKE Interview Questions & Answers

user image Anonymous

posted on 2 Oct 2021

I applied via LinkedIn and was interviewed before Oct 2020. There were 6 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Civil Engineering Field Work

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident, be formal dress, be in Time

I applied via Naukri.com and was interviewed before Jan 2020. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How much load is taking by adjustable props for shuttering works.
  • Ans. 

    The load taken by adjustable props for shuttering works depends on various factors.

    • The load capacity of adjustable props depends on their size and material.

    • The type of shuttering work being done also affects the load taken by adjustable props.

    • The load can vary from a few hundred kilograms to several tons.

    • Adjustable props are commonly used in construction to support formwork during concrete pouring.

    • The load taken by adj...

  • Answered by AI
  • Q2. How many types of shuttering methods & advantages for each.
  • Ans. 

    There are various types of shuttering methods used in construction, each with its own advantages.

    • Types of shuttering methods include timber, steel, aluminum, plastic, and fabric.

    • Timber shuttering is cost-effective and easy to work with, while steel shuttering is durable and reusable.

    • Aluminum shuttering is lightweight and easy to handle, while plastic shuttering is waterproof and easy to clean.

    • Fabric shuttering is flexi...

  • Answered by AI
  • Q3. Methodology for all finishing activities
  • Ans. 

    The methodology for finishing activities involves planning, coordination, and attention to detail.

    • Create a detailed schedule for finishing activities

    • Coordinate with subcontractors and suppliers to ensure timely delivery of materials

    • Ensure quality control measures are in place and followed

    • Conduct regular inspections to identify and address any issues

    • Communicate regularly with the project team to ensure everyone is on th...

  • Answered by AI
  • Q4. Brief information about self or candidate.
  • Ans. 

    Experienced construction professional with strong leadership and project management skills.

    • Over 5 years of experience in the construction industry.

    • Managed multiple construction projects from start to finish, ensuring timely completion and within budget.

    • Strong knowledge of construction methods, materials, and safety regulations.

    • Proven ability to lead and motivate teams to achieve project goals.

    • Excellent communication an...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Concentrate & give the reply very confidentially.

Assistant Construction Manager Interview Questions asked at other Companies

Q1. In a Case, If 12mm dia rebar in your drawing and spacing is 150 mm. In case you are not having it at that time and you have to change it with 16 mm. what would be the spacing according 16 mm dia rebar?
View answer (2)

I applied via Referral and was interviewed before Mar 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Why are hiring you??
  • Q2. About your strength??
  • Q3. About your weakness?
Round 3 - Aptitude Test 

Basic aptitude question

Interview Preparation Tips

Interview preparation tips for other job seekers - This company is the best in grouth and development in construction line and precast line. This is most of good group of management.

Electrical Site Engineer Interview Questions asked at other Companies

Q1. What is the maximum range of voltage rating for belted cables are in used?
View answer (5)

Interview Questionnaire 

3 Questions

  • Q1. Experience
  • Q2. Type of works
  • Ans. 

    The type of works for a Civil Supervisor can include construction, maintenance, and inspection of civil engineering projects.

    • Construction of buildings, roads, bridges, and other infrastructure

    • Maintenance and repair of existing structures

    • Inspection and quality control of construction projects

    • Coordination with architects, engineers, and contractors

    • Ensuring compliance with building codes and regulations

    • Managing constructi

  • Answered by AI
  • Q3. Technical questions related field

Civil Supervisor Interview Questions asked at other Companies

Q1. 1=Derivation of D²/162. 2=nominal mix 3=design mix 4=per tonne binding wire 5=water cement ratio 6=recent experience or responsibility.
View answer (1)

B. G. Shirke Construction Technology interview questions for popular designations

 Junior Engineer

 (4)

 Architectural Assistant

 (1)

 Assistant Construction Manager

 (1)

 Assistant Engineer

 (1)

 Assistant Engineer - Civil

 (1)

 Assistant Engineer (QA/QC)

 (1)

 Civil Supervisor

 (1)

 Deputy Manager

 (1)

I applied via Referral and was interviewed before Jan 2019. There were 4 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. 12 mm thickness cement plastering 1.:6 on 100 sq.m new brick work the quantity of cement required.
  • Ans. 

    Calculate the quantity of cement required for 12 mm thickness cement plastering 1:6 on 100 sq.m new brick work.

    • Calculate the volume of plaster required by multiplying the area and thickness of plastering.

    • Convert the volume of plaster into the quantity of cement required by using the mix ratio.

    • The mix ratio of 1:6 means one part of cement and six parts of sand.

    • Assuming the density of cement as 1440 kg/cum, calculate the

  • Answered by AI
  • Q2. 0.274m3
  • Q3. What are the type of survey.
  • Ans. 

    There are various types of surveys, including demographic surveys, market research surveys, and customer satisfaction surveys.

    • Demographic surveys collect information about the characteristics of a population, such as age, gender, and income.

    • Market research surveys gather data about consumer preferences, buying habits, and market trends.

    • Customer satisfaction surveys measure the satisfaction levels of customers with a pr...

  • Answered by AI
  • Q4. Plane table survey, Topographical survey,cadastral survey, nature field survey type-land survey, Marine survey ,Geological survey and described plane table survey.
  • Q5. Trapezoidal footing formula.
  • Ans. 

    Trapezoidal footing formula is used to calculate the volume of concrete required for a trapezoidal footing.

    • The formula is: V = [(A+B)/2] x L x D

    • A and B are the lengths of the parallel sides of the trapezoid

    • L is the length of the trapezoidal footing

    • D is the depth of the footing

    • The result gives the volume of concrete required for the footing

  • Answered by AI
  • Q6. V= h/3(A1+A2+Root of(A1×A2)
  • Ans. 

    The formula calculates the volume of a frustum of a pyramid.

    • V is the volume of the frustum

    • h is the height of the frustum

    • A1 and A2 are the areas of the top and bottom faces of the frustum

    • The formula involves finding the square root of the product of A1 and A2

    • The frustum is a pyramid with the top sliced off

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a Technical one but was long time taken has.it lasted for 1 hr .Interviewer wanted to be test both my knowledge and estimation oriented.most of question asked To me survey related and estimation .I was able to answer most of questions and few day later they are sending mail you are submitting Document and join as soon as possible.

Junior Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities ?
View answer (25)

Get interview-ready with Top B. G. Shirke Construction Technology Interview Questions

B. G. Shirke Construction Technology Interview FAQs

How many rounds are there in B. G. Shirke Construction Technology interview?
B. G. Shirke Construction Technology interview process usually has 2-3 rounds. The most common rounds in the B. G. Shirke Construction Technology interview process are Technical, Resume Shortlist and HR.
How to prepare for B. G. Shirke Construction Technology interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at B. G. Shirke Construction Technology. The most common topics and skills that interviewers at B. G. Shirke Construction Technology expect are AutoCAD, Civil Engineering, Accounting, Maintenance and Auditing.
What are the top questions asked in B. G. Shirke Construction Technology interview?

Some of the top questions asked at the B. G. Shirke Construction Technology interview -

  1. how much load is taking by adjustable props for shuttering work...read more
  2. How many types of shuttering methods & advantages for ea...read more
  3. What are the type of surv...read more
How long is the B. G. Shirke Construction Technology interview process?

The duration of B. G. Shirke Construction Technology interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

B. G. Shirke Construction Technology Interview Process

based on 4 interviews in last 1 year

Interview experience

4.5
  
Good
View more

People are getting interviews through

based on 27 B. G. Shirke Construction Technology interviews
Job Portal
Referral
WalkIn
Company Website
44%
22%
11%
7%
16% candidates got the interview through other sources.
High Confidence
?
High Confidence means the data is based on a large number of responses received from the candidates.

B. G. Shirke Construction Technology Reviews and Ratings

based on 486 reviews

4.3/5

Rating in categories

3.9

Skill development

4.1

Work-Life balance

3.9

Salary & Benefits

4.6

Job Security

4.1

Company culture

3.7

Promotions/Appraisal

3.9

Work Satisfaction

Explore 486 Reviews and Ratings
Night Auditor - 5 Star Clubs For (Bandra, Kandivali, Airoli)

Mumbai Suburban,

Navi Mumbai

2-5 Yrs

₹ 3.25-3.75 LPA

Front Office Associate

Mumbai Suburban

0-1 Yrs

₹ 2-3 LPA

Telecalling Executive

Mumbai Suburban

1-4 Yrs

₹ 3-3.5 LPA

Explore more jobs
Junior Engineer Civil
307 salaries
unlock blur

₹1.5 L/yr - ₹4.8 L/yr

Junior Engineer
174 salaries
unlock blur

₹1.5 L/yr - ₹6.2 L/yr

Assistant Engineer - Civil
92 salaries
unlock blur

₹3 L/yr - ₹7 L/yr

Assistant Engineer
87 salaries
unlock blur

₹3.5 L/yr - ₹7.8 L/yr

Senior Engineer
75 salaries
unlock blur

₹4.5 L/yr - ₹9.6 L/yr

Explore more salaries
Compare B. G. Shirke Construction Technology with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Hindustan Construction Company

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview