i
Aparna Constructions and Estates
Filter interviews by
I applied via Walk-in and was interviewed before Oct 2023. There was 1 interview round.
Our company policy prioritizes safety, quality, and efficiency in all steel fabrication projects.
Safety is our top priority - all employees must adhere to safety protocols and wear appropriate protective gear.
Quality control measures are in place to ensure all steel products meet industry standards and client specifications.
Efficiency is key - we strive to complete projects on time and within budget to meet client expe...
Top trending discussions
The number of bricks in 1 cubic meter varies depending on the size of the bricks used.
The number of bricks in 1 cubic meter will depend on the size of the bricks being used.
Standard size bricks (190mm x 90mm x 90mm) will have a different count compared to larger or smaller bricks.
Calculations can be done by dividing the volume of 1 cubic meter by the volume of a single brick.
I was interviewed before Jun 2023.
Layout is done using measurements and tools, column ring cutting length is calculated based on the diameter and height of the column.
Use measuring tape and chalk to mark the layout according to the blueprint
Calculate the column ring cutting length using the formula: 2 x π x radius + height
Ensure accuracy in measurements to avoid errors in construction
I applied via Approached by Company and was interviewed in Aug 2021. There were 3 interview rounds.
Project roll. Projects rules & regulations
Coding test. Group discussion
Ring cutting length refers to the measurement of the length of a ring that needs to be cut.
Ring cutting length is determined by measuring the circumference of the ring and dividing it by π (pi).
The formula for calculating the ring cutting length is: L = C / π, where L is the cutting length and C is the circumference of the ring.
For example, if the circumference of a ring is 10 cm, the cutting length would be approximat
The slump in concrete grade m-40 is typically between 75mm to 125mm.
Slump is a measure of the consistency or workability of concrete.
For concrete grade m-40, the slump range is usually between 75mm to 125mm.
Slump is determined by conducting a slump test, where a cone-shaped mold is filled with concrete and then removed to measure the slump.
The slump value indicates the flow and compactness of the concrete mix.
A higher ...
I applied via Approached by Company
I applied via Approached by Company and was interviewed in Jul 2018. There was 1 interview round.
based on 3 interviews
Interview experience
based on 4 reviews
Rating in categories
Assistant Engineer
194
salaries
| ₹2.5 L/yr - ₹6.4 L/yr |
Junior Engineer
107
salaries
| ₹2 L/yr - ₹5.4 L/yr |
Senior Engineer
97
salaries
| ₹4.2 L/yr - ₹9.2 L/yr |
Engineer
86
salaries
| ₹3.8 L/yr - ₹7.5 L/yr |
Assistant Engineer - Civil
83
salaries
| ₹2.5 L/yr - ₹5.4 L/yr |
Prestige Group
Sobha
Godrej Properties
DLF