Aparna Constructions and Estates Steel Foreman Interview Questions and Answers

Updated 15 Oct 2024

Aparna Constructions and Estates Steel Foreman Interview Experiences

1 interview found

Steel Foreman Interview Questions & Answers

user image Anonymous

posted on 13 Oct 2024

Interview experience
2
Poor
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Oct 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What your company policy
  • Ans. 

    Our company policy prioritizes safety, quality, and efficiency in all steel fabrication projects.

    • Safety is our top priority - all employees must adhere to safety protocols and wear appropriate protective gear.

    • Quality control measures are in place to ensure all steel products meet industry standards and client specifications.

    • Efficiency is key - we strive to complete projects on time and within budget to meet client expe...

  • Answered by AI
  • Q2. Where is the company's side

Interview Preparation Tips

Interview preparation tips for other job seekers - Company policy

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Question acording construction line
  • Q2. No of brick in 1 cubic meter
  • Ans. 

    The number of bricks in 1 cubic meter varies depending on the size of the bricks used.

    • The number of bricks in 1 cubic meter will depend on the size of the bricks being used.

    • Standard size bricks (190mm x 90mm x 90mm) will have a different count compared to larger or smaller bricks.

    • Calculations can be done by dividing the volume of 1 cubic meter by the volume of a single brick.

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jun 2023.

Round 1 - Technical 

(1 Question)

  • Q1. How to do layout, how to calculate column ring cutting length
  • Ans. 

    Layout is done using measurements and tools, column ring cutting length is calculated based on the diameter and height of the column.

    • Use measuring tape and chalk to mark the layout according to the blueprint

    • Calculate the column ring cutting length using the formula: 2 x π x radius + height

    • Ensure accuracy in measurements to avoid errors in construction

  • Answered by AI

I applied via Approached by Company and was interviewed in Aug 2021. There were 3 interview rounds.

Round 1 - Group Discussion 

Project roll. Projects rules & regulations

Round 2 - Aptitude Test 

Coding test. Group discussion

Round 3 - HR 

(1 Question)

  • Q1. My experience peper salary sleep Bank stetment

Interview Preparation Tips

Topics to prepare for VGN Projects Estates Civil Foreman interview:
  • Civil foreman
Interview preparation tips for other job seekers - work xpe in very important. Quality & sefety

Interview Questionnaire 

4 Questions

  • Q1. Ring cutting length
  • Ans. 

    Ring cutting length refers to the measurement of the length of a ring that needs to be cut.

    • Ring cutting length is determined by measuring the circumference of the ring and dividing it by π (pi).

    • The formula for calculating the ring cutting length is: L = C / π, where L is the cutting length and C is the circumference of the ring.

    • For example, if the circumference of a ring is 10 cm, the cutting length would be approximat

  • Answered by AI
  • Q2. Beam Side makeing
  • Q3. Read the drawing
  • Q4. How much slump in concrete grade m-40
  • Ans. 

    The slump in concrete grade m-40 is typically between 75mm to 125mm.

    • Slump is a measure of the consistency or workability of concrete.

    • For concrete grade m-40, the slump range is usually between 75mm to 125mm.

    • Slump is determined by conducting a slump test, where a cone-shaped mold is filled with concrete and then removed to measure the slump.

    • The slump value indicates the flow and compactness of the concrete mix.

    • A higher ...

  • Answered by AI

I applied via Approached by Company

Interview Preparation Tips

General Tips: Civil formen experience 15 years and fhineceing work
Skills: Leadership
Duration: <1 week

I applied via Approached by Company and was interviewed in Jul 2018. There was 1 interview round.

Interview Preparation Tips

General Tips: Civil formen experience 15 years and fhineceing work
Skills: Leadership
Duration: <1 week

Aparna Constructions and Estates Interview FAQs

How many rounds are there in Aparna Constructions and Estates Steel Foreman interview?
Aparna Constructions and Estates interview process usually has 1 rounds. The most common rounds in the Aparna Constructions and Estates interview process are One-on-one Round.

Tell us how to improve this page.

Aparna Constructions and Estates Steel Foreman Interview Process

based on 3 interviews

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 128 Interviews
Lodha Group Interview Questions
4.0
 • 125 Interviews
DLF Interview Questions
3.9
 • 75 Interviews
Colliers India Interview Questions
3.9
 • 63 Interviews
Casagrand Interview Questions
3.8
 • 56 Interviews
Rohan Builders Interview Questions
4.1
 • 43 Interviews
View all
Aparna Constructions and Estates Steel Foreman Salary
based on 7 salaries
₹3.3 L/yr - ₹7.9 L/yr
At par with the average Steel Foreman Salary in India
View more details

Aparna Constructions and Estates Steel Foreman Reviews and Ratings

based on 4 reviews

2.9/5

Rating in categories

2.9

Skill development

3.2

Work-life balance

4.0

Salary

3.9

Job security

3.6

Company culture

3.9

Promotions

3.6

Work satisfaction

Explore 4 Reviews and Ratings
Assistant Engineer
194 salaries
unlock blur

₹2.5 L/yr - ₹6.4 L/yr

Junior Engineer
107 salaries
unlock blur

₹2 L/yr - ₹5.4 L/yr

Senior Engineer
97 salaries
unlock blur

₹4.2 L/yr - ₹9.2 L/yr

Engineer
86 salaries
unlock blur

₹3.8 L/yr - ₹7.5 L/yr

Assistant Engineer - Civil
83 salaries
unlock blur

₹2.5 L/yr - ₹5.4 L/yr

Explore more salaries
Compare Aparna Constructions and Estates with

Prestige Group

4.3
Compare

Sobha

3.9
Compare

Godrej Properties

3.7
Compare

DLF

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview