I applied via Walk-in and was interviewed in Jul 2022. There were 3 interview rounds.
Electrical inspections on a worksite ensure safety and compliance with regulations.
Visual inspection of electrical equipment and wiring
Testing of electrical systems for proper functioning
Checking for any exposed or damaged wires
Verifying proper grounding and bonding
Inspecting electrical panels and circuit breakers
Ensuring proper labeling of electrical components
Reviewing electrical permits and documentation
Conducting r
ELCB stands for Earth Leakage Circuit Breaker. It is a safety device that automatically switches off the electrical circuit when it detects a current leakage.
ELCB is used to protect against electric shock and fire hazards caused by faulty wiring or appliances.
It works by detecting the difference in current between the live and neutral wires.
If the current leakage exceeds a certain level, the ELCB trips and cuts off the...
ELCB/RCCB functions as a safety device that protects against electric shocks and fires.
ELCB/RCCB stands for Earth Leakage Circuit Breaker/Residual Current Circuit Breaker.
It detects and interrupts the flow of current when there is a leakage of current to earth.
It protects against electric shocks and fires caused by faulty wiring or appliances.
ELCB/RCCB is commonly used in homes, offices, and industries.
For example, if ...
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
Discussed about mechanical lifting shifting activity
posted on 29 Aug 2023
I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.
RCC Mivon shuttering experience involves using reinforced concrete construction techniques for formwork and scaffolding.
Experience in setting up formwork and scaffolding for reinforced concrete structures
Knowledge of RCC Mivon shuttering techniques and materials
Ability to interpret construction drawings and plans for RCC Mivon shuttering
Experience in coordinating with construction teams and contractors for RCC Mivon sh
I manage projects by setting clear goals, creating a detailed plan, delegating tasks effectively, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed project plan outlining tasks, timelines, and resources
Delegate tasks to team members based on their strengths and expertise
Monitor progress regularly and address any issues or delays promptly
Adjust the project plan
posted on 6 Aug 2023
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
posted on 20 Jun 2024
I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
Aluform Day wise process involves the daily operations and tasks carried out at Aluform.
Aluform Day wise process includes scheduling production, quality control checks, inventory management, and staff supervision.
Each day starts with a production meeting to discuss goals and priorities.
Quality control checks are conducted throughout the day to ensure products meet standards.
Inventory management involves tracking raw ma...
based on 1 interview
Interview experience
based on 9 reviews
Rating in categories
Assistant Engineer
194
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
105
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
96
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
86
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer - Civil
83
salaries
| ₹0 L/yr - ₹0 L/yr |
Prestige Group
Sobha
Godrej Properties
DLF