Upload Button Icon Add office photos

Filter interviews by

Ahluwalia Contracts India Interview Questions, Process, and Tips

Updated 5 Feb 2025

Top Ahluwalia Contracts India Interview Questions and Answers

View all 38 questions

Ahluwalia Contracts India Interview Experiences

Popular Designations

49 interviews found

Planning Interview Questions & Answers

user image Mohd Faisal Afatab

posted on 9 Jun 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Tell me your work experience
  • Q2. How do you plan for a projects
  • Q3. What will take time to complete a project
  • Q4. How do you plan and which software you use for plan please make a 40 story building plan inms projects

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not hagitate it's a normal
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I was interviewed in Feb 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Batching plant & Mechanical
  • Q2. Erection & commission
  • Q3. Electrical mechanical

Interview Preparation Tips

Interview preparation tips for other job seekers - Fuel consumption report dpr monthly report Hire billing

Incharge- Plant & Machinery Interview Questions asked at other Companies

Q1. How to system shapoorji pallonji company likes & regulation.
View answer (1)

Surveyor Interview Questions & Answers

user image Anonymous

posted on 26 Sep 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
-

I applied via Walk-in and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Which using total station company
  • Q2. Auto cad drawing superimposed
  • Q3. How to convert total station data into auto cad.
  • Ans. 

    Total station data can be converted into AutoCAD by exporting the data in a compatible format and importing it into AutoCAD.

    • Export the total station data in a compatible format such as CSV or DXF.

    • Open AutoCAD and import the exported data file.

    • Adjust the scale and orientation of the imported data as needed.

    • Use AutoCAD tools to further manipulate and analyze the imported total station data.

    • Save the AutoCAD file with the ...

  • Answered by AI
  • Q4. How much total station list count.
  • Ans. 

    The total station list count refers to the number of total stations available for surveying purposes.

    • The total station list count can vary depending on the specific surveying project or area.

    • It is important to have a sufficient number of total stations to efficiently conduct surveys.

    • For example, a large construction project may require a higher total station list count compared to a smaller land surveying project.

  • Answered by AI
  • Q5. How much auto level list count.
  • Ans. 

    The auto level list count varies depending on the specific surveying project and equipment used.

    • Auto level list count can range from a few dozen to hundreds depending on the size of the project.

    • The count may also be influenced by the number of surveying points and the level of detail required.

    • For example, a small residential survey may have around 50 auto level lists, while a large construction project may have over 20

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Hobbies, strength, weakness, attitude

Surveyor Interview Questions asked at other Companies

Q1. How much bench marks important your total station for centre line marking.
View answer (3)

Senior Engineer Interview Questions & Answers

user image Raju Gupta

posted on 19 May 2023

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Billing codes to be followed
  • Ans. 

    Billing codes are determined by the organization and industry standards.

    • Billing codes are used to identify specific products or services provided by an organization.

    • The codes are typically determined by the organization and may also follow industry standards.

    • Examples of billing codes include CPT codes for medical procedures and UPC codes for retail products.

  • Answered by AI
  • Q2. IS 1200, it is in different part.

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)

Ahluwalia Contracts India interview questions for popular designations

 Billing Engineer

 (4)

 Senior Safety Officer

 (3)

 Assistant Manager Safety

 (2)

 Assistant Project Manager

 (2)

 Billing Manager

 (2)

 Senior Engineer

 (2)

 Senior Planning Engineer

 (2)

 Site Engineer

 (2)

Land Surveyor Interview Questions & Answers

user image parmod kumar

posted on 23 May 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How does cad drawing superimposed.
  • Ans. 

    CAD drawing superimposed by aligning different layers of drawings on top of each other to create a composite image.

    • CAD drawing superimposed by aligning different layers of drawings on top of each other.

    • Each layer represents a different aspect of the survey data, such as property boundaries, topography, or utilities.

    • By superimposing the layers, surveyors can create a comprehensive and detailed map of the surveyed area.

    • T...

  • Answered by AI
  • Q2. How does cad drawing superimposed
  • Ans. 

    CAD drawing superimposed by overlaying one drawing on top of another to compare or analyze differences.

    • CAD drawing superimposed by aligning common points in both drawings.

    • Helps in identifying discrepancies or changes between different versions of a drawing.

    • Useful for construction projects to track progress and changes over time.

    • Can be done by adjusting transparency of one drawing to see both simultaneously.

    • Allows for b...

  • Answered by AI

Land Surveyor Interview Questions asked at other Companies

Q1. Convert quadrant bearing to whole circle bearing.
View answer (2)

Get interview-ready with Top Ahluwalia Contracts India Interview Questions

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Bbs(reinforcement), finishing work (Tiles, Granite, Italian marble,B/w, plaster,paint,putti,doorframe& fixture etc

Senior Supervisor Interview Questions asked at other Companies

Q1. What is standard height between WC Outlet centre to Inlet center?
View answer (1)

Jobs at Ahluwalia Contracts India

View all
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. BOCW Act & Rule
  • Q2. Work at Height Safety
  • Q3. Work Permit System
Round 3 - HR 

(1 Question)

  • Q1. Salary Negotiation

Assistant Manager Safety Interview Questions asked at other Companies

Q1. 1. What is HSE plan 2. What is HSE Policy. 3 .What is Safety program
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is Slump value??

Interview Preparation Tips

Interview preparation tips for other job seekers - It's a family based contractor company culture

Senior Quality Control Engineer Interview Questions asked at other Companies

Q1. In cube compression testing why our concrete cube breaks more at middle of cube? explain with technical reasons behind that.
View answer (1)

I applied via Company Website and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be honest with your years of experience. All information you share will be verified at the time of joining.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. General civil engineering questions
  • Q2. Quality related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Fresher join lot of learning regarding residential & commercial projects

Assistant Project Manager Interview Questions asked at other Companies

Q1. What are the different phases in new product development?
View answer (1)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Avoid using too much corporate jargon in your CV. Sometimes keeping things simple will get your job done.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Detailing about method of measurement, mode of measurement, cash flow, budget etc.
Round 3 - HR 

(1 Question)

  • Q1. Discussion regarding my present remuneration and expected for new assignment.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be careful for optimum out knowledge as well as practical knowledge.

Billing Manager Interview Questions asked at other Companies

Q1. How to calculate the length of reinforment steel in bar bending schedule
View answer (2)

Ahluwalia Contracts India Interview FAQs

How many rounds are there in Ahluwalia Contracts India interview?
Ahluwalia Contracts India interview process usually has 1-2 rounds. The most common rounds in the Ahluwalia Contracts India interview process are Technical, Resume Shortlist and HR.
How to prepare for Ahluwalia Contracts India interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Ahluwalia Contracts India. The most common topics and skills that interviewers at Ahluwalia Contracts India expect are Project Management, Construction Management, Project Control, Project Execution and Project Planning.
What are the top questions asked in Ahluwalia Contracts India interview?

Some of the top questions asked at the Ahluwalia Contracts India interview -

  1. Is code for all material Testing Procedu...read more
  2. What is MIS? and how it prepa...read more
  3. What is the labour charges for main item like concrete, Shuttering & Rainforcem...read more
How long is the Ahluwalia Contracts India interview process?

The duration of Ahluwalia Contracts India interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Ahluwalia Contracts India Interview Process

based on 82 interviews

Interview experience

4.1
  
Good
View more

Ahluwalia Contracts India Reviews and Ratings

based on 833 reviews

4.1/5

Rating in categories

3.8

Skill development

3.7

Work-life balance

3.7

Salary

3.9

Job security

3.6

Company culture

3.6

Promotions

3.7

Work satisfaction

Explore 833 Reviews and Ratings
Manager - Techno-Legal

Kolkata

10-15 Yrs

Not Disclosed

Surveyor

Delhi/Ncr

8-13 Yrs

Not Disclosed

Manager / AGM - Planning & Monitoring

Patna

10-20 Yrs

Not Disclosed

Explore more jobs
Senior Engineer
114 salaries
unlock blur

₹3.5 L/yr - ₹9 L/yr

Civil Engineer
110 salaries
unlock blur

₹2 L/yr - ₹6.5 L/yr

Site Engineer
93 salaries
unlock blur

₹2.4 L/yr - ₹6.6 L/yr

Civil Site Engineer
81 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Engineer
69 salaries
unlock blur

₹2.2 L/yr - ₹5.1 L/yr

Explore more salaries
Compare Ahluwalia Contracts India with

Nagarjuna Construction Company

4.1
Compare

Simplex Infrastructures

3.3
Compare

Larsen & Toubro Limited

4.0
Compare

Punj Lloyd

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview