i
Advenser Engineering Services
Filter interviews by
I applied via Naukri.com and was interviewed before Jun 2023. There was 1 interview round.
Global coordination positioning in Tekla can be set using project properties.
Go to File > Project Properties in Tekla.
Under the 'Coordinate System' tab, select the desired global coordinate system.
Adjust the origin and rotation angle if needed.
Click 'Apply' to save the changes.
The global coordinates will now be set for the project.
Generating a model using given drawings involves interpreting the drawings accurately and translating them into a 3D model.
Carefully study the provided drawings to understand the dimensions and details
Use Tekla Modeller software to create a 3D model based on the drawings
Ensure accuracy in translating the 2D drawings into a 3D model
Check for any discrepancies or missing information in the drawings
I applied via LinkedIn and was interviewed in Mar 2022. There were 3 interview rounds.
Tool test
I expect a competitive salary based on my experience, skills, and the responsibilities of the Senior Team Leader role.
Research the average salary range for Senior Team Leader positions in your industry and location.
Consider your years of experience, level of expertise, and any additional qualifications or certifications.
Highlight your track record of success and the value you can bring to the organization.
Be prepared t...
I applied via Referral and was interviewed before Apr 2021. There were 4 interview rounds.
You will be given with graphics related questions such as to draw views of any object having cut at any portions (one view will be given)in maximum possible ways. You’ll also be asked to find solutions for basic math questions such as to find net area of paper of size m x n left after a square cut of size p x q is made at two corners of that paper. Then you’ll have to write answers briefly in English for some questions to check your language strength.
Tool test will be conducted to check your proficiency in software you work.
Advenser Engineering Services interview questions for popular designations
Top trending discussions
I applied via campus placement at Annasaheb Dange College of Engineering and Technology, Ashta and was interviewed in Aug 2023. There were 4 interview rounds.
Normal level questions
Designed a solar-powered irrigation system for a rural community
Researched solar panel efficiency and water pump technology
Created CAD models for the system layout
Tested prototype in field conditions
Collaborated with local community for feedback and adjustments
posted on 26 Apr 2023
I applied via Naukri.com and was interviewed in Sep 2022. There were 3 interview rounds.
Nominal minimum covers for different structures are the minimum thickness of concrete or other materials required to protect the reinforcement from corrosion and provide durability.
Nominal minimum cover is specified to prevent corrosion of reinforcement and ensure structural integrity.
The minimum cover requirements vary depending on the type of structure and its exposure conditions.
For reinforced concrete structures, t...
Inspections for wall plastering include surface preparation, thickness, curing time, and finish.
Check if the surface is clean and free from dust and debris before applying plaster
Ensure the thickness of the plaster is uniform throughout the wall
Check the curing time of the plaster before applying paint or wallpaper
Inspect the finish of the plaster for any cracks or unevenness
Reinforcement checks for structural elements like column beam or slabs
Check for proper placement and spacing of reinforcement bars
Ensure the diameter and grade of reinforcement bars meet design specifications
Check for proper cover of reinforcement bars
Inspect for any damage or corrosion of reinforcement bars
Verify that the reinforcement detailing matches the design drawings
ITP stands for Inspection and Test Plan while MTP stands for Method Statement and Test Plan.
ITP is a document that outlines the inspection and testing activities that will be carried out during a project.
MTP is a document that outlines the methodology and procedures that will be used to carry out a specific task or activity.
ITP is usually prepared by the quality control team while MTP is prepared by the project managem...
posted on 29 Aug 2022
posted on 27 Feb 2022
I applied via campus placement at Holkar Science College, Indore and was interviewed in Jan 2022. There was 1 interview round.
I will ensure efficient and effective functioning of the department by implementing strategies and fostering teamwork.
Develop and implement strategies to improve departmental performance
Encourage teamwork and collaboration among staff members
Ensure compliance with regulations and policies
Provide training and development opportunities for staff
Monitor and evaluate departmental operations regularly
Communicate effectively...
posted on 2 Mar 2022
I applied via AmbitionBox and was interviewed in Oct 2021. There were 2 interview rounds.
There are four members in my family first of my respected father government sarvent then my lovely mother she has been source of inspiration and motivation for me she is house maker other family are one younger sister both are studying
Interview experience
based on 37 reviews
Rating in categories
BIM Engineer
25
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Junior Engineer
13
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Engineer
6
salaries
| ₹4.5 L/yr - ₹6 L/yr |
MEP Bim Engineer
6
salaries
| ₹3.6 L/yr - ₹4.2 L/yr |
Precast Engineer
5
salaries
| ₹3 L/yr - ₹4.4 L/yr |
Cyient
Quest Global
TCS
L&T Technology Services