Nominal minimum covers for different structures are the minimum thickness of concrete or other materials required to protect the reinforcement from corrosion and provide durability.
Nominal minimum cover is specified to prevent corrosion of reinforcement and ensure structural integrity.
The minimum cover requirements vary depending on the type of structure and its exposure conditions.
For reinforced concrete structures, t...
Inspections for wall plastering include surface preparation, thickness, curing time, and finish.
Check if the surface is clean and free from dust and debris before applying plaster
Ensure the thickness of the plaster is uniform throughout the wall
Check the curing time of the plaster before applying paint or wallpaper
Inspect the finish of the plaster for any cracks or unevenness
Reinforcement checks for structural elements like column beam or slabs
Check for proper placement and spacing of reinforcement bars
Ensure the diameter and grade of reinforcement bars meet design specifications
Check for proper cover of reinforcement bars
Inspect for any damage or corrosion of reinforcement bars
Verify that the reinforcement detailing matches the design drawings
ITP stands for Inspection and Test Plan while MTP stands for Method Statement and Test Plan.
ITP is a document that outlines the inspection and testing activities that will be carried out during a project.
MTP is a document that outlines the methodology and procedures that will be used to carry out a specific task or activity.
ITP is usually prepared by the quality control team while MTP is prepared by the project managem...
I applied via Job Fair and was interviewed before May 2023. There was 1 interview round.
posted on 10 Jul 2024
RDBMS stands for Relational Database Management System, a type of database management system that stores data in a structured format.
Organizes data into tables with rows and columns
Uses SQL for querying and managing data
Supports ACID properties for data consistency
Examples: MySQL, Oracle Database, SQL Server
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.
My previous salary is confidential and I am unable to disclose it.
I am expecting a salary that is commensurate with my qualifications and experience.
I am open to discussing salary expectations during the negotiation process.
I believe that a competitive salary is importa...
I applied via Naukri.com and was interviewed in Apr 2022. There were 4 interview rounds.
Some of the top questions asked at the CQRA Junior Engineer interview -
based on 2 interviews
Interview experience
based on 9 reviews
Rating in categories
Senior Engineer
71
salaries
| ₹4.4 L/yr - ₹9.4 L/yr |
Quality Engineer
53
salaries
| ₹3.6 L/yr - ₹8.2 L/yr |
QA QC Engineer
41
salaries
| ₹4.1 L/yr - ₹7.3 L/yr |
Engineer
32
salaries
| ₹4 L/yr - ₹6.6 L/yr |
Senior Quality Engineer
32
salaries
| ₹4.5 L/yr - ₹9 L/yr |
Patel Infrastructure
CTS Consulting & Technical Support
J K Fenner
Saudi Binladin Group