Filter interviews by
I applied via Company Website and was interviewed before Feb 2019. There was 1 interview round.
Concerning previous work experience.
Top trending discussions
I applied via Approached by Company and was interviewed in Sep 2023. There were 3 interview rounds.
posted on 17 Dec 2023
I applied via Approached by Company and was interviewed in Jun 2023. There were 4 interview rounds.
Software or tool test
posted on 18 Jul 2023
It was a basic 30 minutes aptitude test having topics like Quantitative Analysis, Logical Reasoning, etc.
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.
Blinding is the process of isolating a section of a pipeline or equipment to prevent flow or contamination.
Temporary or permanent blinds can be used depending on the situation
Common types of blinds include spectacle blinds, paddle blinds, and bleed rings
Blinding is often used during maintenance or repair work to ensure safety
Blinding can also be used to prevent contamination during storage or transportation
Blinding can...
Before starting work in a refinery equipment, certain procedures must be followed.
Obtain a work permit
Perform a safety check of the equipment
Ensure proper personal protective equipment is worn
Verify that all valves are in the correct position
Confirm that the equipment is properly grounded
Check for any leaks or abnormal conditions
Communicate with other workers in the area
Follow all established procedures and protocols
I will follow the emergency response plan and evacuate the area immediately.
Activate the alarm system to alert others in the area
Put on personal protective equipment (PPE) including a respirator
Evacuate the area immediately and move to a safe location
Notify emergency services and follow the emergency response plan
Monitor the situation and wait for the all-clear signal before returning to the area
I would advise my workers to start unbolting the heat exchanger head from the top and work their way down.
Start from the top and work your way down
Use appropriate tools and safety equipment
Follow proper procedures and guidelines
Ensure all bolts are properly labeled and accounted for
Inspect the gasket and replace if necessary
I applied via Referral and was interviewed in Jul 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 2 interview rounds.
Sheetmetal development processes involve designing, cutting, bending, and assembling sheetmetal into a final product.
Designing involves creating a blueprint or 3D model of the product
Cutting involves using tools such as shears or lasers to cut the sheetmetal into the desired shape
Bending involves using tools such as press brakes to bend the sheetmetal into the desired shape
Assembling involves joining the different shee...
Project management stages include initiation, planning, execution, monitoring and control, and closure.
Initiation involves defining the project's purpose and goals.
Planning involves creating a detailed project plan, including timelines, budgets, and resources.
Execution involves carrying out the plan and completing the project deliverables.
Monitoring and control involves tracking progress and making adjustments as neede...
based on 11 reviews
Rating in categories
Hyderabad / Secunderabad
10-12 Yrs
₹ 6-8 LPA
Senior Engineer
73
salaries
| ₹4.4 L/yr - ₹9 L/yr |
Quality Engineer
49
salaries
| ₹3.6 L/yr - ₹7.5 L/yr |
QA QC Engineer
41
salaries
| ₹4.1 L/yr - ₹7.3 L/yr |
Engineer
32
salaries
| ₹4 L/yr - ₹6.6 L/yr |
Senior Quality Engineer
30
salaries
| ₹4.5 L/yr - ₹9 L/yr |
TCS
Infosys
Wipro
HCLTech