Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There was 1 interview round.
Yes, changing the gas cutting thickness of metal requires adjusting the nozzle size.
Different thicknesses of metal require different nozzle sizes for optimal gas cutting
Thicker metals require larger nozzle sizes to accommodate the higher gas flow needed for cutting
Thinner metals require smaller nozzle sizes to ensure precision and efficiency in cutting
High pressure blow pipe is used for pre-heating in welding process.
High pressure blow pipe is used to pre-heat the metal before welding to ensure proper fusion.
It helps in removing any moisture or impurities from the metal surface.
The high pressure blow pipe can reach temperatures high enough to prepare the metal for welding.
It is an essential tool in the welding process to achieve strong and durable welds.
I applied via Naukri.com and was interviewed in Aug 2022. There were 3 interview rounds.
General aptitude and personality questions
I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.
ACC interview questions for popular designations
I applied via Approached by Company and was interviewed in Jun 2022. There were 2 interview rounds.
Get interview-ready with Top ACC Interview Questions
I applied via Campus Placement and was interviewed before Sep 2022. There were 3 interview rounds.
In first round they take online test by sharing link minimum passing score you have to gain 60% for selection. Question will mixed with Technical And Non Technical.
Star and Delta are two different types of connections used in electrical systems. Control wiring is used for controlling devices, while power wiring is used for supplying power. The safe current or voltage limit depends on the specific equipment and safety regulations.
Star connection is used for connecting three-phase electrical loads, while Delta connection is used for connecting single-phase loads.
Control wiring is u...
Step down transformers decrease voltage while step up transformers increase voltage.
Step down transformers have more turns in the primary coil than in the secondary coil, resulting in a lower output voltage.
Step up transformers have more turns in the secondary coil than in the primary coil, resulting in a higher output voltage.
Step down transformers are commonly used in household appliances to reduce voltage from the m...
I applied via Campus Placement and was interviewed in Mar 2022. There were 2 interview rounds.
25 questions are been asked and you have score minimum 40%. Then after the cut off shortlisted candidates have to face interviews
Grade of concrete refers to its strength and slump of concrete refers to its consistency.
Grade of concrete is determined by its compressive strength, such as M20, M25, etc.
Slump of concrete is a measure of its workability and is determined by the flow of concrete when placed in a slump cone.
Higher grade of concrete indicates higher strength and lower slump indicates less workable concrete.
For example, M30 grade concret...
Properties and tests for building materials
Properties: strength, durability, thermal conductivity, fire resistance, water absorption, etc.
Tests: compression test, tensile test, flexural test, water absorption test, fire resistance test, etc.
Examples: concrete, steel, wood, brick, glass, etc.
I applied via Walk-in and was interviewed before Sep 2022. There were 4 interview rounds.
Aptitude psychology Assessment
posted on 10 Jun 2024
I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.
It was moderate level questions with both analytical and technical part
I applied via Approached by Company and was interviewed in May 2022. There were 3 interview rounds.
35 numbers of resoning.
Some of the top questions asked at the ACC interview -
The duration of ACC interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 174 interviews
Interview experience
10-20 Yrs
Not Disclosed
Assistant Manager
374
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
232
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
200
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
159
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
128
salaries
| ₹0 L/yr - ₹0 L/yr |
Ambuja Cements
UltraTech Cement
Shree Cement
The Ramco Cements