Assistant Manager O&M
10+ Assistant Manager O&M Interview Questions and Answers
Q1. Do u know about batteries ❓ what is VRLA and lead acid batteries❓
VRLA stands for Valve Regulated Lead Acid batteries, which are maintenance-free and sealed. They are commonly used in UPS systems and solar power applications.
VRLA batteries are sealed and maintenance-free
They use a gel or absorbent glass mat to immobilize the electrolyte
Commonly used in UPS systems, solar power applications, and telecommunications
Lead acid batteries are rechargeable batteries that use lead electrodes and sulfuric acid electrolyte
Q2. What is fiber. How to work in your company.
Fiber is a thin, flexible thread made of glass or plastic used for transmitting data. Our company works in the field of O&M, providing assistance in managing fiber optic networks.
Fiber is a type of cable that uses light to transmit data signals.
It is made of glass or plastic and is very thin and flexible.
Fiber optic cables are used for high-speed data transmission over long distances.
Our company specializes in O&M (Operations and Maintenance) of fiber optic networks.
We provid...read more
Q3. What is SMPS❓DO u use it in your data center❓
SMPS stands for Switched Mode Power Supply. It is commonly used in data centers for efficient power conversion.
SMPS is a type of power supply that uses a switching regulator to convert electrical power efficiently.
It is commonly used in data centers to provide stable and efficient power to servers and networking equipment.
SMPS can handle a wide range of input voltages and frequencies, making it versatile for different applications.
Examples of SMPS brands commonly used in data...read more
Q4. How to improve data center PUE❓
Improving data center PUE involves optimizing energy usage and efficiency.
Implementing hot aisle/cold aisle containment to reduce energy waste
Upgrading to more energy-efficient servers and cooling systems
Utilizing virtualization to increase server utilization and reduce energy consumption
Regularly monitoring and adjusting temperature and humidity levels for optimal efficiency
Q5. How yo decide KVA rating of DG❓
The KVA rating of a DG is determined based on the connected load and power factor of the system.
Calculate the total connected load in kilowatts (kW)
Consider the power factor of the system
Use the formula: KVA = kW / power factor
Round up to the nearest standard KVA rating available
Q6. Operation of boiler and boiler lightup procedure
Boiler operation involves various steps including lightup procedure.
Before starting the boiler, ensure all safety measures are in place.
Check the fuel and water supply and ensure they are sufficient.
Open the air vent and light up the burner.
Gradually increase the fuel supply and monitor the pressure and temperature.
Once the desired pressure and temperature are reached, the boiler is ready for operation.
Share interview questions and help millions of jobseekers 🌟
Q7. Types of bearing used in cooling tower gearbox
The types of bearings used in cooling tower gearbox are roller bearings and ball bearings.
Roller bearings are used for heavy loads and high-speed applications.
Ball bearings are used for lighter loads and lower speed applications.
The choice of bearing depends on the load, speed, and operating conditions of the cooling tower gearbox.
Proper lubrication is essential for the smooth operation and longevity of the bearings.
Q8. How to working telecom O&M ?
Telecom O&M involves monitoring, maintaining, and optimizing telecom networks to ensure smooth operations.
Regularly monitoring network performance and identifying any issues or potential problems
Performing routine maintenance tasks to keep the network running smoothly
Optimizing network resources to improve efficiency and performance
Responding to network outages or disruptions in a timely manner to minimize downtime
Keeping detailed records of network performance and maintenanc...read more
Q9. How to design data center❓
Designing a data center involves planning the layout, selecting equipment, ensuring redundancy, and implementing security measures.
Plan the layout of the data center to optimize space and airflow
Select appropriate equipment such as servers, storage devices, and networking gear
Ensure redundancy in power supply, cooling systems, and network connectivity
Implement security measures like access control, surveillance cameras, and fire suppression systems
Q10. What is HVAC load❓
HVAC load refers to the amount of heating or cooling needed to maintain a comfortable indoor temperature in a building.
HVAC load is calculated based on factors such as the size of the building, insulation levels, number of occupants, and climate conditions.
It is important to accurately determine HVAC load to properly size heating and cooling equipment.
Examples of factors affecting HVAC load include sunlight exposure, air leakage, and internal heat gain from appliances and lig...read more
Q11. What is kw and kVA❓
kW and kVA are units of power measurement in electrical systems.
kW stands for kilowatt and is a unit of real power, representing the actual power consumed by a device or system.
kVA stands for kilovolt-ampere and is a unit of apparent power, which is the combination of real power and reactive power in an electrical system.
The relationship between kW and kVA is influenced by the power factor of the system.
Power factor is the ratio of real power (kW) to apparent power (kVA) in a...read more
Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month