Filter interviews by
I applied via Referral and was interviewed in Oct 2020. There was 1 interview round.
Ultrasonic level transmitter uses sound waves to measure the level of liquid or solid in a container.
The transmitter sends high-frequency sound waves towards the surface of the liquid or solid.
The waves bounce back and are received by the transmitter.
The time taken for the waves to return is measured and used to calculate the distance to the surface.
The distance is then converted into a level measurement and transmitte...
During emergency shutdown, the execution plan involves immediate identification of the problem and taking necessary steps to mitigate it.
Identify the cause of the emergency shutdown
Initiate the emergency shutdown procedure
Isolate the affected equipment or area
Notify relevant personnel and authorities
Implement emergency response plan
Conduct post-shutdown analysis and investigation
Use a magnetic level gauge to measure the level of a vertical vessel for calibration.
Install a magnetic level gauge on the vertical vessel.
Ensure the gauge is properly calibrated and zeroed.
Take readings at various levels and record the corresponding magnetic field strengths.
Compare the readings to a calibration curve to determine the actual level of the vessel.
Adjust the gauge if necessary and repeat the process until
A JSA is prepared by identifying potential hazards and developing controls to mitigate them.
Identify all potential hazards in the work area
Determine the likelihood and severity of each hazard
Develop controls to mitigate or eliminate the hazards
Communicate the JSA to all workers involved in the job
Review and update the JSA as needed
Preparing an RFQ involves gathering requirements, creating a detailed scope of work, and identifying potential suppliers.
Identify the requirements for the project
Create a detailed scope of work
Identify potential suppliers and send the RFQ to them
Include all necessary information in the RFQ, such as project timeline and budget
Review and evaluate the responses from suppliers
I appeared for an interview before Mar 2024, where I was asked the following questions.
Piling IS code refers to the Indian Standards for design and construction of pile foundations in civil engineering.
IS 2911: This is the primary code for piling in India, detailing design and construction methods.
IS 2911 Part 1: Covers the general guidelines for pile foundations.
IS 2911 Part 2: Focuses on the design and construction of driven piles.
IS 2911 Part 3: Discusses bored piles and their specifications.
IS 2911 P...
Zeeco interview questions for popular designations
I appeared for an interview before Jan 2024.
I applied via Referral and was interviewed in Dec 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Aug 2022. There was 1 interview round.
I applied via Referral and was interviewed in Nov 2021. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before May 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Mar 2021. There were 2 interview rounds.
based on 6 interviews
Interview experience
Project Manager
10
salaries
| ₹12 L/yr - ₹33 L/yr |
Project Engineer
10
salaries
| ₹5 L/yr - ₹19 L/yr |
Senior Instrumentation and Control Engineer
6
salaries
| ₹12.9 L/yr - ₹17.6 L/yr |
Vendor Manager
6
salaries
| ₹14 L/yr - ₹18.5 L/yr |
HSE Manager
6
salaries
| ₹9.6 L/yr - ₹22 L/yr |
Sterling Oil Exploration & Energy Production
Heavy Engineering Industries & Shipbuilding
Helmerich & Payne
Daelim Industrial Co.