I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.
I appeared for an interview in Mar 2025, where I was asked the following questions.
Faced challenges in project coordination and technology integration, implementing solutions for effective collaboration and efficiency.
Challenge: Coordination between multiple teams led to delays. Solution: Implemented regular cross-team meetings to enhance communication.
Challenge: Inconsistent data formats from different software. Solution: Developed a standardized template for data entry to ensure uniformity.
Challeng...
Client input for BIM Technician - ELV includes project requirements, specifications, and design preferences.
Project Requirements: Clients provide detailed descriptions of their needs, such as the type of ELV systems required (e.g., CCTV, access control).
Specifications: Clients may specify technical standards or compliance requirements that the ELV systems must meet.
Design Preferences: Clients often share their vision f...
ELV services encompass low-voltage systems for communication, security, and automation in buildings.
1. CCTV (Closed-Circuit Television) - Used for surveillance and security monitoring.
2. Access Control Systems - Manages entry to buildings or specific areas, e.g., card readers.
3. Fire Alarm Systems - Detects smoke or fire and alerts occupants, e.g., smoke detectors.
4. Public Address Systems - For announcements and emerg...
Smart Circuiting automates circuit design in Revit, enhancing efficiency over manual methods.
Smart Circuiting uses algorithms to automatically assign circuits based on load requirements.
Manual Circuiting requires users to manually select and assign circuits, which is time-consuming.
Smart Circuiting can quickly adapt to changes in the model, while manual methods require rework.
For example, if a new device is added, Smar...
Effective coordination of electrical services with MEP systems in ceiling voids ensures functionality and safety in building design.
Use of 3D BIM models to visualize spatial relationships between electrical, mechanical, and plumbing systems.
Regular coordination meetings among MEP teams to discuss potential clashes and resolve them early in the design phase.
Implementation of clash detection software to identify conflict...
I applied via Campus Placement and was interviewed in Nov 2024. There were 3 interview rounds.
Normal to medium level general aptitude questions
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
WSP interview questions for popular designations
I appeared for an interview before Mar 2024, where I was asked the following questions.
The S curve is a graphical representation of project progress over time, showing cumulative costs or work completed.
1. Define the project scope and timeline to establish baseline data.
2. In Primavera P6, use the 'Earned Value' feature to track progress.
3. Create a cumulative cost curve by plotting actual vs. planned costs over time.
4. In Excel, use a line chart to visualize cumulative data points for planned and actual...
The Spotlight feature enhances user experience by providing focused insights and streamlined navigation within applications.
Offers contextual information based on user actions, improving decision-making.
Facilitates quick access to relevant data, reducing time spent searching.
Can highlight key performance indicators (KPIs) for project tracking.
Example: In project management software, it may spotlight overdue tasks or bu
OBS (Organizational Breakdown Structure) and EPS (Enterprise Project Structure) are frameworks for project management organization.
OBS defines the hierarchy of the organization involved in the project, showing roles and responsibilities.
EPS outlines the overall structure of projects within an organization, including all projects and their relationships.
Example of OBS: A project team may include a project manager, engin...
A baseline in project management is a reference point for measuring project performance and progress.
Types of baselines include Scope Baseline, Schedule Baseline, and Cost Baseline.
Scope Baseline defines the project's deliverables and work required.
Schedule Baseline outlines the planned start and finish dates for project activities.
Cost Baseline represents the approved budget for the project.
In Primavera P6, a baseline...
A network diagram visually represents project tasks, their dependencies, and the sequence of activities.
Illustrates the flow of tasks in a project.
Helps identify critical paths and dependencies.
Common types include PERT and CPM diagrams.
Example: A construction project showing tasks like design, permits, and building phases.
Faced challenges in resource allocation, stakeholder communication, and budget constraints during my last project.
Resource Allocation: We struggled with limited resources, leading to delays in project milestones. For example, key personnel were double-booked.
Stakeholder Communication: Misalignment in expectations caused confusion. Regular updates and meetings helped clarify objectives.
Budget Constraints: Unexpected cos...
A risk register is a tool for documenting risks and issues in a project, helping manage potential problems effectively.
A risk register lists identified risks, their impact, likelihood, and mitigation strategies.
An issue is a current problem that needs resolution, while a risk is a potential future problem.
Example of a risk: 'There is a chance of budget overruns due to unforeseen expenses.'
Example of an issue: 'The proj...
An extension of time is a formal request to prolong project deadlines due to unforeseen circumstances.
An extension of time is typically requested when delays occur due to factors beyond the contractor's control.
Examples include adverse weather conditions, supply chain disruptions, or changes in project scope.
Communication with the client involves providing detailed documentation of the reasons for the delay.
I would sch...
As a Project Controller, I managed project budgets, schedules, and performance metrics to ensure successful project delivery.
Developed and maintained project budgets, ensuring alignment with financial forecasts.
Monitored project timelines and milestones, using tools like MS Project to track progress.
Conducted regular risk assessments to identify potential issues and implemented mitigation strategies.
Collaborated with c...
Get interview-ready with Top WSP Interview Questions
I applied via LinkedIn and was interviewed in Sep 2024. There were 2 interview rounds.
Moment and shear connections are critical in steel structures for transferring loads between members.
Moment connections transfer bending forces between beams and columns
Shear connections transfer shear forces between beams and columns
Common types of moment connections include bolted end plate connections and welded connections
Common types of shear connections include bolted shear tabs and welded shear plates
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
I applied for this job because of my passion for leading teams and delivering successful projects.
I have a strong background in project management and enjoy the challenge of overseeing complex projects.
I am excited about the opportunity to work with a talented team and contribute to the company's success.
I believe my skills and experience align well with the requirements of the role, and I am eager to make a positive i
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
I appeared for an interview in Sep 2024.
I applied via Campus Placement
There will be 30 questions mainly focus on data interpretation
I want to join WSP because of its reputation for innovative projects and commitment to sustainability.
WSP is known for its cutting-edge projects in engineering and sustainability
I admire WSP's commitment to creating a more sustainable future
I believe WSP offers great opportunities for professional growth and development
WSP is a global engineering professional services firm that provides a wide range of projects in various sectors.
WSP has worked on transportation projects such as the California High-Speed Rail and the Sydney Metro
They have also been involved in environmental projects like the Thames Tideway Tunnel in London
WSP has experience in building projects like the One World Trade Center in New York City
Private sector is profit-driven, more competitive, and offers higher salaries. Government sector is more stable, has better benefits, and serves public interest.
Private sector is profit-driven and focused on maximizing profits for shareholders.
Government sector is more stable and provides job security with better benefits.
Private sector is more competitive and innovative due to market forces.
Government sector serves pu...
Yes, I am preparing for government jobs as well as opportunities in the private sector.
I believe in keeping my options open and exploring all career opportunities.
I am actively studying for government job exams while also applying for positions in private companies.
I want to secure a stable job in the government sector while also gaining experience in the private sector.
I am confident in my abilities to succeed in both
The duration of WSP interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 75 interviews
Interview experience
BIM Modeller
80
salaries
| ₹4 L/yr - ₹12.8 L/yr |
Principal Engineer
72
salaries
| ₹15.9 L/yr - ₹36 L/yr |
Senior Engineer
65
salaries
| ₹11 L/yr - ₹26 L/yr |
CAD Technician
58
salaries
| ₹4.2 L/yr - ₹10 L/yr |
Engineer
57
salaries
| ₹7 L/yr - ₹15 L/yr |
Deloitte
Ernst & Young
PwC
ZS