I applied via Newspaper Ad and was interviewed before Aug 2022. There were 2 interview rounds.
Verbal Reasoning Aptitude and Technical
Top trending discussions
I applied via Walk-in and was interviewed before Aug 2019. There was 1 interview round.
A water supply scheme project involves designing and implementing a system to provide clean water to a community.
Identify the water source and assess its quality
Design a treatment system to remove impurities
Construct pipelines and storage tanks
Implement a distribution system to deliver water to households
Train community members on maintenance and operation of the system
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
Precommissioning tests of transformers ensure proper functioning and safety before energizing.
Visual inspection of transformer and its components
Measurement of insulation resistance
Measurement of winding resistance
Verification of transformer ratio and polarity
Verification of oil level and quality
Testing of protective devices
Verification of grounding
Functional testing of cooling system
Verification of nameplate data
11kv & 33kv overhead power line distribution
11kv and 33kv are common voltage levels for overhead power lines
Overhead power lines are used to distribute electricity from power stations to consumers
The voltage level determines the distance the power can be transmitted and the size of the conductors needed
Proper insulation and grounding is important for safety
Maintenance and inspection of the lines is necessary to ensure
posted on 20 Dec 2020
I applied via Naukri.com and was interviewed before Mar 2020. There were 4 interview rounds.
posted on 29 Jan 2021
posted on 16 Sep 2022
I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.
Slump test is a measure of the consistency of fresh concrete.
It is used to determine the workability of concrete.
The test involves filling a standard cone-shaped container with concrete and then removing the cone to see how much the concrete slumps or settles.
The amount of slump is measured in millimeters and indicates the wetness or dryness of the concrete.
Curing is the process of maintaining moisture in the concrete ...
based on 2 interviews
Interview experience
based on 31 reviews
Rating in categories
Field Engineer
147
salaries
| ₹1.7 L/yr - ₹7 L/yr |
Civil Engineer
145
salaries
| ₹2.4 L/yr - ₹9.6 L/yr |
Electrical Engineer
81
salaries
| ₹2.4 L/yr - ₹8.4 L/yr |
Site Engineer
71
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Civil Site Engineer
66
salaries
| ₹2.2 L/yr - ₹6 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon