Filter interviews by
I applied via AmbitionBox and was interviewed in Sep 2023. There were 3 interview rounds.
I am Sanjit Haldar from Kolkata. I am ready always struggle
Top trending discussions
posted on 20 Dec 2020
posted on 29 Jan 2021
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
Precommissioning tests of transformers ensure proper functioning and safety before energizing.
Visual inspection of transformer and its components
Measurement of insulation resistance
Measurement of winding resistance
Verification of transformer ratio and polarity
Verification of oil level and quality
Testing of protective devices
Verification of grounding
Functional testing of cooling system
Verification of nameplate data
11kv & 33kv overhead power line distribution
11kv and 33kv are common voltage levels for overhead power lines
Overhead power lines are used to distribute electricity from power stations to consumers
The voltage level determines the distance the power can be transmitted and the size of the conductors needed
Proper insulation and grounding is important for safety
Maintenance and inspection of the lines is necessary to ensure
posted on 12 Sep 2021
posted on 28 Dec 2021
I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.
Initial setting time of cement is the time taken by cement to harden and attain a particular strength.
Initial setting time is determined by Vicat apparatus
It is the time taken for the cement to lose its plasticity and become hard
The standard initial setting time for ordinary Portland cement is 30 minutes
Factors affecting initial setting time include temperature, water-cement ratio, and type of cement
The elongation % of steel fy 500 is approximately 12%.
Elongation % is the measure of ductility of a material.
It is the percentage increase in length of a material before it fractures under tension.
For steel fy 500, the elongation % is approximately 12%.
This means that the steel can stretch up to 12% of its original length before it breaks.
The amount of cement required for 1 cubic meter varies depending on the concrete mix design.
The amount of cement needed for 1 cubic meter of concrete varies from 250kg to 600kg depending on the mix design.
The mix design specifies the ratio of cement to other materials like sand and aggregates.
For example, a mix design of 1:2:4 requires 400kg of cement per cubic meter of concrete.
It is important to accurately calculate ...
Density of materials: Steel - 7850 kg/m3, Concrete - 2400 kg/m3, Sand - 1600 kg/m3
Density of steel is higher than that of concrete and sand
Density of concrete varies depending on the mix design
Density of sand can vary depending on the source and moisture content
posted on 20 Dec 2023
The density of RCC structure typically ranges from 2200 to 2500 kg/m^3.
Density of RCC is influenced by the type and proportion of materials used.
Common density range for RCC is 2200 to 2500 kg/m^3.
Higher density indicates stronger and more durable RCC structure.
posted on 21 May 2023
I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
Managing a team involves effective communication, delegation, motivation, and conflict resolution.
Establish clear goals and expectations for the team
Communicate regularly and openly with team members
Delegate tasks based on team members' strengths and skills
Provide feedback and recognition for good work
Address conflicts and issues promptly and fairly
Lead by example and demonstrate a positive attitude
Encourage collaborat...
posted on 4 Mar 2025
I appeared for an interview in Feb 2025.
based on 1 interview
Interview experience
Field Engineer
147
salaries
| ₹1.7 L/yr - ₹7 L/yr |
Civil Engineer
145
salaries
| ₹2.4 L/yr - ₹9.6 L/yr |
Electrical Engineer
81
salaries
| ₹2.4 L/yr - ₹8.4 L/yr |
Site Engineer
71
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Civil Site Engineer
66
salaries
| ₹2.2 L/yr - ₹6 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon