Gate level questions
Grade of concrete refers to its strength and is denoted by a number. Higher grade indicates higher strength.
Grade of concrete is denoted by a number, such as M20, M30, etc.
It signifies the strength of the concrete mix. For example, M20 means the mix has a compressive strength of 20 MPa.
Higher grade concrete is used for structures requiring higher strength, like bridges and high-rise buildings.
Lower grade concrete is us...
I applied via Newspaper Ad and was interviewed in Jun 2024. There was 1 interview round.
To communicate technical information about electrical systems to non-technical stakeholders, use simple language, visual aids, analogies, and real-life examples.
Use simple and non-technical language to explain complex concepts
Utilize visual aids such as diagrams, charts, or presentations to enhance understanding
Draw analogies or comparisons to familiar objects or situations
Provide real-life examples or case studies to ...
To control costs while maintaining quality in electrical engineering projects, one can focus on efficient project planning, effective resource allocation, and continuous monitoring and optimization.
Develop a detailed project plan that outlines the scope, timeline, and budget constraints.
Identify potential cost-saving opportunities such as using energy-efficient components or optimizing design to reduce material usage.
A...
Quality assessments and inspections are conducted during various project phases to ensure adherence to standards and identify any issues.
Develop a quality assurance plan that outlines the objectives, criteria, and methods for assessments and inspections.
Conduct regular inspections and audits to verify compliance with specifications, codes, and regulations.
Use checklists and standardized procedures to ensure consistency...
I have 5 years of experience working as a Site Engineer in construction projects.
5 years of experience as a Site Engineer
Managed construction projects from start to finish
Ensured compliance with safety regulations and quality standards
Collaborated with architects, contractors, and other stakeholders
Performed site inspections and resolved technical issues
Wapcos interview questions for popular designations
I applied via AmbitionBox and was interviewed in Sep 2023. There were 3 interview rounds.
I am Sanjit Haldar from Kolkata. I am ready always struggle
Get interview-ready with Top Wapcos Interview Questions
I applied via Walk-in and was interviewed in Jan 2023. There were 2 interview rounds.
The current carrying capacity of a DOG conductor depends on various factors such as material, size, and insulation.
The current carrying capacity of a conductor is typically determined by its cross-sectional area and the material it is made of.
Factors such as the type of insulation and the temperature at which the conductor operates also affect its current carrying capacity.
For example, a copper conductor with a larger ...
11 kV distribution line poles are typically made of materials like concrete, steel, or wood.
Common materials used for 11 kV distribution line poles include concrete, steel, and wood.
Concrete poles are durable and resistant to corrosion, making them suitable for harsh environments.
Steel poles are strong and can be easily customized for specific requirements.
Wood poles are cost-effective and easy to install, but may requ...
LA represents Line-to-Arc distance in a two-pole structure.
LA is the distance between the line connecting the two poles and the arc formed by the poles.
It is an important parameter for ensuring proper clearance and safety in electrical installations.
For example, in overhead power lines, LA helps determine the minimum safe distance between conductors and nearby objects.
Distance between two poles in LT distribution line varies depending on the voltage and design standards.
The distance between two poles in LT distribution line is typically around 30-50 meters.
The distance may vary based on factors such as voltage rating, terrain, and local regulations.
In urban areas, the distance between poles may be shorter compared to rural areas.
Design standards such as IS 5613:1985 provide guidelin...
Feeder bifurcation is the splitting of a main feeder into multiple branches to distribute power to different areas.
Feeder bifurcation is a common practice in electrical engineering to efficiently distribute power.
It involves splitting a main feeder into smaller branches to supply power to different sections or loads.
Each branch may have its own circuit protection and control devices.
Feeder bifurcation helps in balancin...
I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.
General aptitude, english
Expectations of necessities for a Site Engineer
Clear project scope and objectives
Adequate budget and resources
Effective communication with stakeholders
Access to necessary equipment and materials
Compliance with safety regulations
Timely resolution of issues and conflicts
Written test of safety
Both physical and mental safety are equally important for workers on site.
Physical safety measures like proper PPE, training, and equipment are crucial to prevent accidents and injuries.
Mental safety measures like stress management, communication, and support systems are important to prevent burnout and mental health issues.
Both physical and mental safety should be prioritized equally to ensure a safe and healthy work ...
I will immediately intervene and separate the workers to prevent any harm or injury.
I will approach the situation calmly and assess the level of aggression
I will try to defuse the situation by talking to the workers and finding out the root cause of the conflict
If necessary, I will involve the HR department or higher management to resolve the issue
I will ensure that all workers involved receive appropriate disciplinary...
I applied via Recruitment Consulltant and was interviewed before Dec 2022. There were 2 interview rounds.
Top trending discussions
Some of the top questions asked at the Wapcos interview -
The duration of Wapcos interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 26 interviews
Interview experience
based on 580 reviews
Rating in categories
Field Engineer
157
salaries
| â‚ą1.8 L/yr - â‚ą7 L/yr |
Civil Engineer
146
salaries
| â‚ą2.4 L/yr - â‚ą8.5 L/yr |
Electrical Engineer
81
salaries
| â‚ą2.4 L/yr - â‚ą8.4 L/yr |
Site Engineer
73
salaries
| â‚ą2 L/yr - â‚ą6 L/yr |
Civil Site Engineer
66
salaries
| â‚ą2.2 L/yr - â‚ą6 L/yr |