I applied via Recruitment Consulltant and was interviewed before Oct 2021. There was 1 interview round.
Civil engineering field of construction involves designing, planning, and executing construction projects.
Civil engineers work on various types of construction projects such as buildings, roads, bridges, and water systems.
They use their knowledge of mathematics, physics, and materials science to design structures that are safe, efficient, and cost-effective.
They also oversee the construction process to ensure that the ...
I applied via Newspaper Ad and was interviewed before Jan 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed before Oct 2021. There were 2 interview rounds.
In hilly regions, water can be stored in reservoirs created by building dams across valleys or by constructing underground tanks.
Building dams across valleys to create reservoirs
Constructing underground tanks
Using gravity-fed systems to transport water to storage tanks
Ensuring proper drainage to prevent erosion and landslides
Conservation technology refers to the use of technology to conserve natural resources and protect the environment.
It involves the development and implementation of innovative solutions to reduce waste and pollution.
Examples include renewable energy technologies, water conservation systems, and sustainable agriculture practices.
Conservation technology also includes the use of data and analytics to monitor and manage nat...
I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.
Wapcos interview questions for popular designations
I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.
Get interview-ready with Top Wapcos Interview Questions
I applied via Referral and was interviewed in Apr 2021. There was 1 interview round.
COD stands for Chemical Oxygen Demand, which is a measure of the amount of organic matter in water.
COD is a water quality parameter used to determine the amount of organic pollutants in water.
It measures the amount of oxygen required to oxidize the organic matter in water.
COD is often used as an indicator of water pollution and the effectiveness of wastewater treatment.
High COD levels can indicate the presence of harmf...
The limit of hardness in the outlet of waste water depends on the regulatory standards and the intended use of the water.
The limit of hardness is usually expressed in terms of milligrams per liter (mg/L) of calcium carbonate.
Regulatory standards vary by country and region.
The intended use of the water also affects the limit of hardness. For example, water used for irrigation may have a higher limit than water used for ...
The limit of hardness is 300ppm in water.
Hardness refers to the amount of dissolved minerals in water.
The limit of 300ppm is set to ensure the water is safe for consumption and does not cause damage to pipes and appliances.
Common minerals that contribute to hardness include calcium and magnesium.
Water softeners can be used to reduce hardness levels.
Testing for hardness can be done using a water testing kit or by sendin
I applied via Company Website and was interviewed before Aug 2020. There were 5 interview rounds.
The current carrying capacity of conductors varies depending on their material and size.
The current carrying capacity of a conductor is determined by its cross-sectional area.
Conductors with larger cross-sectional areas can carry more current.
The material of the conductor also affects its current carrying capacity.
Copper is a commonly used conductor material with high current carrying capacity.
Aluminum is another condu...
SLD of 132/33kV & 33/11kV substations
SLD stands for Single Line Diagram
132/33kV substation SLD shows the transmission line, transformer, circuit breaker, isolator, etc.
33/11kV substation SLD shows the distribution line, transformer, circuit breaker, isolator, etc.
Field tests required before commissioning of power transformers include insulation resistance test, turns ratio test, and polarity test.
Insulation resistance test is conducted to ensure the insulation system is intact and can withstand the operating voltage.
Turns ratio test is performed to verify the turns ratio of the transformer and ensure it meets the design specifications.
Polarity test is carried out to confirm the...
Finalizing a JMC involves several steps to ensure its accuracy and completeness.
Review and verify all data and calculations
Ensure compliance with all relevant regulations and standards
Obtain necessary approvals and signatures
Prepare final report or documentation
Archive all relevant documents for future reference
Necessary steps before commissioning a substation
Performing insulation resistance tests
Checking the grounding system
Verifying the correct functioning of protection relays
Testing the transformer and circuit breakers
Ensuring proper labeling and documentation
Conducting a thorough safety inspection
I applied via Approached by Company and was interviewed before Oct 2021. There were 3 interview rounds.
They are asked in finance related.
They are said about my responsibility in Accounts
I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed before Aug 2018. There was 1 interview round.
The key point for supervision during all civil, mechanical, and electrical works is safety.
Ensuring compliance with safety regulations and standards
Regular safety inspections and audits
Proper training and certification of workers
Use of appropriate personal protective equipment (PPE)
Effective communication and coordination among workers and supervisors
Identification and mitigation of potential hazards
Adherence to projec...
Field engineers should prepare themselves before leaving site offices to fields.
Check weather conditions and prepare accordingly
Ensure all necessary equipment and tools are available and in good condition
Review safety protocols and procedures
Communicate with team members and establish communication plan
Familiarize oneself with the site and project requirements
Pack necessary supplies such as water, food, and first aid k
IS 12288 is followed for which pipeline works?
IS 12288 is a code of practice for pipeline laying and construction
It covers various aspects such as design, materials, testing, and inspection
It is commonly followed in India for oil and gas pipeline projects
It also applies to water supply and sewage pipelines
Top trending discussions
Some of the top questions asked at the Wapcos interview -
The duration of Wapcos interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 26 interviews
Interview experience
based on 580 reviews
Rating in categories
Field Engineer
157
salaries
| ₹1.8 L/yr - ₹7 L/yr |
Civil Engineer
148
salaries
| ₹2.4 L/yr - ₹8.4 L/yr |
Electrical Engineer
81
salaries
| ₹2.4 L/yr - ₹8.4 L/yr |
Site Engineer
73
salaries
| ₹2 L/yr - ₹6 L/yr |
Civil Site Engineer
66
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Mecon
RITES
Ircon International
NBCC