The current carrying capacity of a DOG conductor depends on various factors such as material, size, and insulation.
The current carrying capacity of a conductor is typically determined by its cross-sectional area and the material it is made of.
Factors such as the type of insulation and the temperature at which the conductor operates also affect its current carrying capacity.
For example, a copper conductor with a larger ...
11 kV distribution line poles are typically made of materials like concrete, steel, or wood.
Common materials used for 11 kV distribution line poles include concrete, steel, and wood.
Concrete poles are durable and resistant to corrosion, making them suitable for harsh environments.
Steel poles are strong and can be easily customized for specific requirements.
Wood poles are cost-effective and easy to install, but may requ...
LA represents Line-to-Arc distance in a two-pole structure.
LA is the distance between the line connecting the two poles and the arc formed by the poles.
It is an important parameter for ensuring proper clearance and safety in electrical installations.
For example, in overhead power lines, LA helps determine the minimum safe distance between conductors and nearby objects.
Distance between two poles in LT distribution line varies depending on the voltage and design standards.
The distance between two poles in LT distribution line is typically around 30-50 meters.
The distance may vary based on factors such as voltage rating, terrain, and local regulations.
In urban areas, the distance between poles may be shorter compared to rural areas.
Design standards such as IS 5613:1985 provide guidelin...
Feeder bifurcation is the splitting of a main feeder into multiple branches to distribute power to different areas.
Feeder bifurcation is a common practice in electrical engineering to efficiently distribute power.
It involves splitting a main feeder into smaller branches to supply power to different sections or loads.
Each branch may have its own circuit protection and control devices.
Feeder bifurcation helps in balancin...
Top trending discussions
posted on 20 Dec 2020
I applied via Company Website and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Company Website and was interviewed before Aug 2020. There were 3 interview rounds.
I appeared for an interview in Aug 2019.
There are various types of structures, including buildings, bridges, dams, tunnels, and towers.
Structures can be classified based on their purpose, design, and materials used.
Buildings can be further classified into residential, commercial, and industrial structures.
Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.
Dams can be classified into gravity, arch, buttress, and embankment dams.
Tu...
Density is the measure of mass per unit volume of a substance.
It is a physical property of matter.
It is calculated by dividing the mass of a substance by its volume.
Units of density include kg/m³, g/cm³, and lb/ft³.
Density can be used to identify substances and determine their purity.
For example, gold has a density of 19.3 g/cm³, while aluminum has a density of 2.7 g/cm³.
There are two types of density construction: compacted and loose.
Compacted density construction involves compressing the material to increase its density, such as in road construction.
Loose density construction involves leaving the material in its natural state, such as in landscaping.
The type of density construction used depends on the intended use of the material and the desired level of compaction.
Other factors that...
Tests for construction joints include visual inspection, water tightness test, and load transfer test.
Visual inspection to check for proper joint alignment and sealant application
Water tightness test to ensure no water leakage through the joint
Load transfer test to verify the joint can handle the intended load
Other tests may include pull-out test, shear test, and compression test
Testing frequency and methods may vary d...
posted on 28 Dec 2021
I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.
Initial setting time of cement is the time taken by cement to harden and attain a particular strength.
Initial setting time is determined by Vicat apparatus
It is the time taken for the cement to lose its plasticity and become hard
The standard initial setting time for ordinary Portland cement is 30 minutes
Factors affecting initial setting time include temperature, water-cement ratio, and type of cement
The elongation % of steel fy 500 is approximately 12%.
Elongation % is the measure of ductility of a material.
It is the percentage increase in length of a material before it fractures under tension.
For steel fy 500, the elongation % is approximately 12%.
This means that the steel can stretch up to 12% of its original length before it breaks.
The amount of cement required for 1 cubic meter varies depending on the concrete mix design.
The amount of cement needed for 1 cubic meter of concrete varies from 250kg to 600kg depending on the mix design.
The mix design specifies the ratio of cement to other materials like sand and aggregates.
For example, a mix design of 1:2:4 requires 400kg of cement per cubic meter of concrete.
It is important to accurately calculate ...
Density of materials: Steel - 7850 kg/m3, Concrete - 2400 kg/m3, Sand - 1600 kg/m3
Density of steel is higher than that of concrete and sand
Density of concrete varies depending on the mix design
Density of sand can vary depending on the source and moisture content
posted on 29 Jan 2021
I applied via Company Website and was interviewed before Dec 2022. There were 4 interview rounds.
I am an experienced Electrical Engineer with a passion for designing and implementing innovative solutions.
I have a strong background in electrical engineering, with a focus on power systems and control systems.
I have successfully designed and implemented electrical systems for various projects, including commercial buildings and industrial plants.
I am skilled in using CAD software for electrical design and have experi...
I can provide the required documents and discuss salary and joining details.
I can provide all necessary documents such as resume, certifications, and transcripts.
My current base salary is $X per year.
I expect a base salary in the range of $Y to $Z per year.
I am available to join within X weeks/months.
I can discuss further details during the interview.
I applied via Walk-in and was interviewed in Jul 2022. There were 2 interview rounds.
Battery sizing calculation involves determining the capacity and voltage required for a specific application.
Determine the power requirements of the application
Calculate the energy required by multiplying power and time
Select a battery with sufficient capacity and voltage to meet energy requirements
Consider factors such as temperature, discharge rate, and cycle life
Perform testing and validation to ensure the selected
I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Field Engineer
147
salaries
| ₹1.7 L/yr - ₹7 L/yr |
Civil Engineer
145
salaries
| ₹2.4 L/yr - ₹9.6 L/yr |
Electrical Engineer
82
salaries
| ₹2.4 L/yr - ₹8.4 L/yr |
Site Engineer
71
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Civil Site Engineer
66
salaries
| ₹2.2 L/yr - ₹6 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon