Filter interviews by
I applied via Approached by Company and was interviewed before Jul 2020. There were 2 interview rounds.
I was interviewed in Jan 2021.
I applied via Referral and was interviewed before Aug 2020. There was 1 interview round.
Gradient in highway refers to the slope or incline of the road surface.
Gradient is measured in percentage or ratio of rise to run.
It affects the speed and safety of vehicles on the road.
Highway gradients are designed to ensure proper drainage and prevent water accumulation.
Steep gradients may require additional safety measures such as warning signs or speed limits.
Examples of highway gradients include uphill and downhi
Lapping length is the length of overlap between two reinforcing bars in a concrete structure.
It is necessary to provide lapping length to ensure continuity of reinforcement.
The length of lapping depends on the diameter of the bars and the grade of concrete.
Lapping length is specified in the design drawings or codes.
Improper lapping can lead to structural failure or reduced strength of the structure.
Example: For a 20mm ...
I applied via Naukri.com and was interviewed in Jan 2020. There were 3 interview rounds.
Plant erection schedule refers to the timeline for the construction and installation of equipment in a manufacturing facility.
The schedule should be created in collaboration with the project team and stakeholders.
It should include milestones for key activities such as site preparation, equipment delivery, and commissioning.
The schedule should be regularly reviewed and updated to ensure that the project stays on track.
F...
Machinery and vehicle fuel consumption norms are regulations that limit the amount of fuel that can be used by machinery and vehicles.
Fuel consumption norms are set by governments to reduce pollution and conserve resources.
These norms vary by country and type of machinery/vehicle.
For example, the US Environmental Protection Agency sets fuel economy standards for cars and trucks.
Similarly, the European Union has set CO2...
Maintenance schedule of Earth moving machinery involves regular inspections, servicing, and repairs to ensure optimal performance and longevity.
Regularly inspect machinery for wear and tear
Perform routine servicing and maintenance
Replace worn out parts as needed
Keep machinery clean and lubricated
Follow manufacturer's recommended maintenance schedule
Train operators on proper use and maintenance of machinery
Handling an inauguration project requires careful planning and execution.
Create a detailed project plan with timelines and milestones
Identify and coordinate with all stakeholders involved in the project
Ensure all necessary permits and approvals are obtained
Manage the budget and resources effectively
Communicate regularly with the project team and stakeholders
Prepare for any potential risks or challenges that may arise
En...
Varaha Infra interview questions for popular designations
Top trending discussions
posted on 17 Feb 2025
Documents verification
posted on 25 Jan 2025
I was interviewed in Dec 2024.
posted on 21 Nov 2023
I applied via Company Website and was interviewed before Nov 2022. There were 2 interview rounds.
posted on 15 Feb 2025
I was interviewed before Feb 2024.
based on 1 interview
Interview experience
based on 68 reviews
Rating in categories
Highway Engineer
13
salaries
| ₹3.3 L/yr - ₹4.8 L/yr |
Structural Engineer
11
salaries
| ₹2 L/yr - ₹5.4 L/yr |
Project Manager
8
salaries
| ₹18 L/yr - ₹36.1 L/yr |
Executive Accountant
7
salaries
| ₹3 L/yr - ₹3.2 L/yr |
Material Engineer
5
salaries
| ₹5.4 L/yr - ₹9 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure