Varaha Infra
Sattva Consulting Delhi Interview Questions and Answers
Q1. How can handle of inauguration project
Handling an inauguration project requires careful planning and execution.
Create a detailed project plan with timelines and milestones
Identify and coordinate with all stakeholders involved in the project
Ensure all necessary permits and approvals are obtained
Manage the budget and resources effectively
Communicate regularly with the project team and stakeholders
Prepare for any potential risks or challenges that may arise
Ensure all equipment and facilities are ready for the inaugu...read more
Q2. Maintenance schedule of Earth moving machinery
Maintenance schedule of Earth moving machinery involves regular inspections, servicing, and repairs to ensure optimal performance and longevity.
Regularly inspect machinery for wear and tear
Perform routine servicing and maintenance
Replace worn out parts as needed
Keep machinery clean and lubricated
Follow manufacturer's recommended maintenance schedule
Train operators on proper use and maintenance of machinery
Q3. Machinery and Vehicle Fuel consumption norms
Machinery and vehicle fuel consumption norms are regulations that limit the amount of fuel that can be used by machinery and vehicles.
Fuel consumption norms are set by governments to reduce pollution and conserve resources.
These norms vary by country and type of machinery/vehicle.
For example, the US Environmental Protection Agency sets fuel economy standards for cars and trucks.
Similarly, the European Union has set CO2 emissions standards for cars and vans.
Manufacturers must ...read more
Q4. Plant erection schedule.
Plant erection schedule refers to the timeline for the construction and installation of equipment in a manufacturing facility.
The schedule should be created in collaboration with the project team and stakeholders.
It should include milestones for key activities such as site preparation, equipment delivery, and commissioning.
The schedule should be regularly reviewed and updated to ensure that the project stays on track.
Factors such as weather, labor availability, and material d...read more
Q5. What is lapping length?
Lapping length is the length of overlap between two reinforcing bars in a concrete structure.
It is necessary to provide lapping length to ensure continuity of reinforcement.
The length of lapping depends on the diameter of the bars and the grade of concrete.
Lapping length is specified in the design drawings or codes.
Improper lapping can lead to structural failure or reduced strength of the structure.
Example: For a 20mm diameter bar and M20 grade concrete, the lapping length is...read more
Q6. Gradient in highway?
Gradient in highway refers to the slope or incline of the road surface.
Gradient is measured in percentage or ratio of rise to run.
It affects the speed and safety of vehicles on the road.
Highway gradients are designed to ensure proper drainage and prevent water accumulation.
Steep gradients may require additional safety measures such as warning signs or speed limits.
Examples of highway gradients include uphill and downhill slopes, ramps, and curves.
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month