Vaaman Engineers Deputy Manager Interview Questions and Answers

Updated 28 Sep 2022

Vaaman Engineers Deputy Manager Interview Experiences

1 interview found

I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. 1. WORKING OF BLAST FURNANCE 2. MAJOR SAFETY ASSPECT IN BF
  • Ans. 

    Blast Furnace is a complex process used to extract iron from its ore. Safety aspects include proper ventilation, equipment maintenance, and emergency procedures.

    • Blast Furnace is a high-temperature process that uses coke, limestone, and iron ore to produce pig iron.

    • Proper ventilation is crucial to prevent the buildup of toxic gases like carbon monoxide and sulfur dioxide.

    • Equipment maintenance is important to prevent acc...

  • Answered by AI
  • Q2. WHAT ARE FINAL PRODUCT FROM BLAST FURNANCE.
  • Ans. 

    Final products from blast furnace are pig iron and slag.

    • Pig iron is the main product of blast furnace which is used for making steel.

    • Slag is a byproduct of the iron-making process and is used as a construction material.

    • Other byproducts include gases like carbon dioxide and carbon monoxide.

    • Pig iron is further processed to make wrought iron, cast iron, and steel.

    • The quality of pig iron depends on the quality of iron ore

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - BE CONFIDENT AND ANSWER WHAT YOU KNOW, ALWAYS HAVE HA SMILE ON YOUR FACE

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - HR 

(6 Questions)

  • Q1. Motor replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old motor remove and new motor replace and bolts nut tightening s...
  • Q2. Barring checking and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and blumber block top cover open and old slue Barring remove and new slue...
  • Q3. Gear box replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old gear box remove and new gear box replace and bolts nut tig...
  • Q4. V-scraper replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old v -scraper remove and new v-scraper replace and bolts nut...
  • Q5. Barring greasing work and safety first and all ppes sure and paper work and walked away clean and fresh and Greasing gun and all pulley checking and savings Greasing work and sure and paper work cancelled
  • Q6. Discharge Chute replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old discharge chute remove and new discharge chute repl...

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the opportunity for growth and advancement
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Reason of job change
  • Q2. Why I hire you
Round 2 - Technical 

(2 Questions)

  • Q1. Describe the work profile
  • Q2. Reconciliation process of Raw material
  • Ans. 

    Reconciliation process of raw material involves comparing the physical inventory with the recorded inventory to identify discrepancies.

    • Verify the accuracy of raw material receipts and usage records

    • Compare physical inventory counts with the recorded inventory levels

    • Investigate and resolve any discrepancies found

    • Update inventory records accordingly

    • Implement controls to prevent future discrepancies

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Instrumentation
  • Q2. PLC SCADA
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Group Discussion - Operation & Maintenance

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Oct 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Field related Questions
  • Q2. Experience regarding discussions
Round 2 - HR 

(2 Questions)

  • Q1. Salary Discussion, Job Location discussion.
  • Q2. Negotiation and joining discussion
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Previous Experience
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - Group Discussion 

Discussion about my working and experience on site

Round 2 - HR 

(2 Questions)

  • Q1. How many structure in your last project?
  • Ans. 

    There were three main structures in my last project: a database structure, a software architecture structure, and a project management structure.

    • Database structure included tables, relationships, and indexes.

    • Software architecture structure involved layers, components, and modules.

    • Project management structure consisted of timelines, tasks, and resources.

  • Answered by AI
  • Q2. How many type foundation casting in your last project ?
  • Ans. 

    There were a total of 10 type foundation castings in my last project.

    • There were different types of foundation castings used in the project such as pile foundation, strip foundation, and raft foundation.

    • Each type of foundation casting was used based on the specific requirements of the structure and soil conditions.

    • The number of each type of foundation casting was determined by the structural design and engineering calcu

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at MBM Engineering College, Jodhpur and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Normal question related to your branch
  • Q2. About mass transfer,Heat transfer
Round 3 - Interview 

(1 Question)

  • Q1. About my goals and projects

Interview Preparation Tips

Topics to prepare for Saint-Gobain Deputy Manager interview:
  • Mass Transfer
  • Heat Exchangers
  • Fluid Mechanics
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Aptitude Test 

Simple aptitude questions and logical reasoning

Round 2 - Technical 

(1 Question)

  • Q1. Mechanical engineering
Round 3 - HR 

(3 Questions)

  • Q1. General qualifications details
  • Q2. Tell me about yourself
  • Q3. Salary expectations

Vaaman Engineers Interview FAQs

How many rounds are there in Vaaman Engineers Deputy Manager interview?
Vaaman Engineers interview process usually has 2 rounds. The most common rounds in the Vaaman Engineers interview process are Resume Shortlist and Technical.
What are the top questions asked in Vaaman Engineers Deputy Manager interview?

Some of the top questions asked at the Vaaman Engineers Deputy Manager interview -

  1. 1. WORKING OF BLAST FURNANCE 2. MAJOR SAFETY ASSPECT IN...read more
  2. WHAT ARE FINAL PRODUCT FROM BLAST FURNAN...read more

Tell us how to improve this page.

Vaaman Engineers Deputy Manager Salary
based on 13 salaries
₹7 L/yr - ₹14.7 L/yr
20% more than the average Deputy Manager Salary in India
View more details

Vaaman Engineers Deputy Manager Reviews and Ratings

based on 2 reviews

4.5/5

Rating in categories

4.0

Skill development

3.1

Work-life balance

4.5

Salary

5.0

Job security

3.5

Company culture

4.5

Promotions

4.0

Work satisfaction

Explore 2 Reviews and Ratings
Mechanical Engineer
124 salaries
unlock blur

₹1.6 L/yr - ₹5.6 L/yr

Shift Incharge
67 salaries
unlock blur

₹2.5 L/yr - ₹6.5 L/yr

Safety Officer
53 salaries
unlock blur

₹2.6 L/yr - ₹5.3 L/yr

Mechanical Maintenance Engineer
51 salaries
unlock blur

₹2.3 L/yr - ₹7.2 L/yr

Shift Engineer
45 salaries
unlock blur

₹2.5 L/yr - ₹5 L/yr

Explore more salaries
Compare Vaaman Engineers with

Thermax Limited

4.2
Compare

Kirloskar Brothers

3.8
Compare

BHEL

4.1
Compare

Larsen & Toubro Limited

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview