Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Project Cost analysis
  • Q2. How to calculate labor cost
  • Ans. 

    Labor cost can be calculated by multiplying the total hours worked by the labor rate.

    • Determine the total hours worked by each laborer

    • Identify the labor rate per hour

    • Multiply the total hours worked by the labor rate to get the labor cost

    • Consider any additional costs such as benefits or overtime pay

  • Answered by AI
  • Q3. How to calculate material cost
  • Ans. 

    Material cost can be calculated by determining the quantity of materials needed and multiplying it by the unit cost of each material.

    • Determine the quantity of each material needed for the project

    • Obtain the unit cost of each material

    • Multiply the quantity of each material by its unit cost to get the total cost

    • Add up the total cost of all materials to get the overall material cost

  • Answered by AI
  • Q4. Quality control
  • Q5. Requirement of organisational

Interview Preparation Tips

Interview preparation tips for other job seekers - For senior level Please find another company …

But junior level it’s okay

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Regarding cost of project
Round 2 - HR 

(1 Question)

  • Q1. Mail came from them for a discussion

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024, where I was asked the following questions.

  • Q1. What a IS Code of Design Mix ?
  • Ans. 

    IS Code of Design Mix refers to Indian Standards for concrete mix design, ensuring quality and performance in construction.

    • IS 456:2000 provides guidelines for plain and reinforced concrete design.

    • IS 10262:2019 outlines the procedure for concrete mix design.

    • Mix design considers factors like workability, strength, and durability.

    • Example: A mix design for M25 concrete specifies a ratio of 1:1:2 (Cement:Sand:Aggregate).

    • The...

  • Answered by AI
  • Q2. What are the Welding method of steel?
  • Ans. 

    Welding methods for steel include various techniques like MIG, TIG, and Stick welding, each suited for different applications.

    • MIG Welding (Gas Metal Arc Welding) - Uses a continuous wire feed and is ideal for thin to medium thickness steel.

    • TIG Welding (Gas Tungsten Arc Welding) - Provides high precision and is suitable for thin materials and stainless steel.

    • Stick Welding (Shielded Metal Arc Welding) - Versatile and com...

  • Answered by AI
  • Q3. What are the advantage of steel shuttering?
  • Ans. 

    Steel shuttering offers durability, reusability, and precision in construction, enhancing project efficiency and quality.

    • Durability: Steel shuttering can withstand harsh weather conditions and heavy loads, making it suitable for large-scale projects.

    • Reusability: Unlike timber, steel can be reused multiple times, reducing material costs over time.

    • Precision: Steel shuttering provides a high level of accuracy in dimension...

  • Answered by AI
  • Q4. What are the benefits of using Composite Plate?
  • Ans. 

    Composite plates offer enhanced strength, lightweight properties, and design flexibility for various applications.

    • High strength-to-weight ratio: Composite plates are significantly lighter than metals, making them ideal for aerospace applications.

    • Corrosion resistance: They resist environmental degradation, suitable for marine and chemical industries.

    • Design flexibility: Can be molded into complex shapes, allowing for inn...

  • Answered by AI
  • Q5. How do you lay blocks in block work
  • Ans. 

    Laying blocks involves precise techniques for alignment, mortar application, and ensuring structural integrity.

    • Prepare the foundation: Ensure the base is level and clean before starting.

    • Mix mortar: Use the right ratio of cement, sand, and water for optimal adhesion.

    • Lay the first block: Start at a corner, applying mortar to the bottom and sides.

    • Check alignment: Use a level to ensure blocks are straight and even.

    • Stagger ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - As a job seeker, it's essential to be proactive and persistent in your job search. Don't quit for opportunities to come to you. Create your own. 1- Network and make Connection. 2- Tailor your application materials. 3- Follow up 4- Continuous improve. 5- Stay positive and motivate.
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Field related building materials
  • Q2. Building materials

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join in this company,
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Prepare basics properly before going for interview, they mostly ask less questions with more depth.
  • Q2. Draw BMD for sway frame.
  • Ans. 

    BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.

    • BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.

    • The bending moment will be maximum at the points where the frame experiences maximum sway.

    • The BMD can be drawn by analyzing the internal forces and moments acting on the frame.

  • Answered by AI
Round 3 - One-on-one 

(3 Questions)

  • Q1. Draw piperack elevations
  • Ans. 

    Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.

    • Start by determining the dimensions and layout of the piperack

    • Use software like AutoCAD to create accurate and detailed drawings

    • Include all necessary details such as pipe sizes, supports, and connections

    • Label all components clearly for easy understanding

    • Review and revise the drawings as needed for accuracy

  • Answered by AI
  • Q2. Anchor bolt design
  • Q3. Base plate design
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. PAST EXPERIENCE QUESTIONS

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Senior Engineer interview:
  • Piping
Interview preparation tips for other job seekers - GET DETAILS OF CODES AND STANDARDS YOU USED IN WORK

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Civil engineering related Questions
Round 2 - HR 

(1 Question)

  • Q1. Salary related discussion

URC Construction Interview FAQs

How many rounds are there in URC Construction Construction Manager Civil interview for experienced candidates?
URC Construction interview process for experienced candidates usually has 1 rounds. The most common rounds in the URC Construction interview process for experienced candidates are Technical.
What are the top questions asked in URC Construction Construction Manager Civil interview for experienced candidates?

Some of the top questions asked at the URC Construction Construction Manager Civil interview for experienced candidates -

  1. How to calculate labor c...read more
  2. How to calculate material c...read more
  3. Project Cost analy...read more

Tell us how to improve this page.

URC Construction Construction Manager Civil Interview Process for Experienced

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 120 Interviews
Apco Infratech Interview Questions
3.7
 • 117 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
Psp Projects Interview Questions
3.9
 • 53 Interviews
View all

URC Construction Construction Manager Civil Reviews and Ratings

based on 2 reviews

2.9/5

Rating in categories

1.9

Skill development

2.0

Work-life balance

2.4

Salary

1.9

Job security

1.4

Company culture

2.4

Promotions

2.4

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Engineer
196 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Senior Engineer
131 salaries
unlock blur

₹3 L/yr - ₹9 L/yr

Assistant Engineer - Civil
61 salaries
unlock blur

₹2.4 L/yr - ₹5.7 L/yr

Assistant Manager
48 salaries
unlock blur

₹4.6 L/yr - ₹9.9 L/yr

Planning Engineer
40 salaries
unlock blur

₹1.1 L/yr - ₹7 L/yr

Explore more salaries
Compare URC Construction with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview