Filter interviews by
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
Labor cost can be calculated by multiplying the total hours worked by the labor rate.
Determine the total hours worked by each laborer
Identify the labor rate per hour
Multiply the total hours worked by the labor rate to get the labor cost
Consider any additional costs such as benefits or overtime pay
Material cost can be calculated by determining the quantity of materials needed and multiplying it by the unit cost of each material.
Determine the quantity of each material needed for the project
Obtain the unit cost of each material
Multiply the quantity of each material by its unit cost to get the total cost
Add up the total cost of all materials to get the overall material cost
Top trending discussions
I applied via Naukri.com and was interviewed before Mar 2023. There were 2 interview rounds.
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
posted on 14 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.
The process of making a minor bridge involves planning, design, construction, and inspection.
1. Planning phase involves determining the location, size, and type of bridge needed.
2. Design phase includes creating detailed drawings and calculations for the bridge structure.
3. Construction phase involves building the foundation, supports, and deck of the bridge.
4. Inspection phase ensures the bridge meets safety and quali...
Piling point can be assured by conducting thorough soil investigation, using appropriate piling equipment, and monitoring the piling process.
Conduct soil investigation to determine soil conditions and suitability for piling.
Select appropriate piling equipment based on soil conditions and project requirements.
Monitor the piling process to ensure proper installation and alignment of piles.
Perform load tests on completed
The execution of an elevated viaduct involves various tasks such as pile foundation, pier construction, post-tensioning girders, and bridge structures.
Tasks include pile foundation construction for the viaduct, pier construction for support, post-tensioning of girders for strength, and bridge structure assembly.
Activities also involve conducting load tests, NDT tests, deflection tests, and steel reconciliation for qual...
posted on 11 Oct 2021
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Engineer
196
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Senior Engineer
131
salaries
| ₹3 L/yr - ₹9 L/yr |
Assistant Engineer - Civil
61
salaries
| ₹2.4 L/yr - ₹5.7 L/yr |
Assistant Manager
48
salaries
| ₹4.6 L/yr - ₹9.9 L/yr |
Planning Engineer
40
salaries
| ₹1.1 L/yr - ₹7 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem