i
TÜV SÜD
Filter interviews by
SCCM is a powerful tool for patch management, allowing for centralized control and automation.
SCCM can automate the patching process for Windows operating systems and other Microsoft products.
It can also be used to deploy third-party patches and updates.
SCCM provides a centralized console for managing patches and monitoring compliance.
It allows for scheduling of patch deployments and provides reporting on patch status.
...
I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.
The process for installing solar panels involves site assessment, mounting the panels, connecting to the electrical system, and testing functionality.
Site assessment to determine optimal location for maximum sunlight exposure
Mounting the panels securely on the roof or ground
Connecting the panels to the electrical system using inverters and wiring
Testing functionality through performance monitoring and inspection
Various types of quality tests are conducted in solar systems to ensure efficiency and reliability.
Quality tests for solar panels include performance testing, durability testing, and efficiency testing.
Other quality tests may involve checking for defects in materials, connections, and overall construction.
Regular maintenance and monitoring are also important quality control measures in solar systems.
Diploma in electrical engineering
I applied via Referral and was interviewed in Dec 2024. There were 2 interview rounds.
TÜV SÜD interview questions for popular designations
To prepare welder qualification as per ASME, follow ASME Section IX guidelines, conduct welder performance qualification tests, and maintain records.
Follow ASME Section IX guidelines for welder qualification
Conduct welder performance qualification tests such as visual examination, bend test, and radiographic testing
Maintain records of welder qualifications and requalification tests
Ensure welders are trained and certifi...
Get interview-ready with Top TÜV SÜD Interview Questions
Cutting length in R/f bar is the length of reinforcement required for bending and overlapping in a reinforced concrete structure.
Cutting length is calculated based on the shape and size of the structure where the reinforcement bars will be placed.
It includes the length required for bending the bars at corners and overlaps at joints.
Cutting length helps in determining the quantity of reinforcement bars needed for a spec...
Slump test is used to measure the workability of concrete mix.
Determines the consistency and fluidity of concrete mix
Helps in ensuring the concrete is of the desired quality
Results can indicate if adjustments need to be made to the mix proportions
Commonly used in construction projects to assess the quality of concrete
I applied via Referral and was interviewed in Dec 2024. There was 1 interview round.
I was interviewed in Sep 2024.
I am a detail-oriented and efficient Data Entry Operator with experience in accurately inputting and managing data.
Experienced in using data entry software and tools
Proficient in typing and data accuracy
Ability to prioritize and manage multiple tasks efficiently
I applied via Approached by Company and was interviewed in Dec 2023. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Dec 2023. There were 3 interview rounds.
Top trending discussions
Some of the top questions asked at the TÜV SÜD interview -
The duration of TÜV SÜD interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 62 interviews
Interview experience
Inspection Engineer
204
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
106
salaries
| ₹0 L/yr - ₹0 L/yr |
Lead Auditor
89
salaries
| ₹0 L/yr - ₹0 L/yr |
Field Engineer
86
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Analyst
82
salaries
| ₹0 L/yr - ₹0 L/yr |
Bureau Veritas
DNV GL
Intertek
SGS