Filter interviews by
I applied via Campus Placement and was interviewed in Nov 2021. There were 3 interview rounds.
Robot programming is essential for automating tasks and enhancing efficiency in various industries.
Enables robots to perform specific tasks, such as assembly line work.
Programming languages like Python or C++ are commonly used.
Example: Industrial robots programmed for welding or painting.
Involves using simulation software to test robot behavior before deployment.
Robots can be programmed for complex tasks like surgery i...
The current range refers to the range of electrical current that a device or system can handle safely and effectively.
The current range is typically specified in amperes (A) or milliamperes (mA).
It is important to ensure that the current range of a device or system is not exceeded, as this can lead to damage or failure.
For example, a power supply may have a current range of 0-5A, meaning it can safely provide up to 5A ...
Gas pressure range varies depending on the application and type of gas being used.
Gas pressure range can be measured in units such as psi, kPa, or bar.
For example, the pressure range for natural gas pipelines is typically between 200-1,200 psi.
In contrast, the pressure range for medical oxygen cylinders is around 2,000 psi.
It is important to ensure that gas pressure is within the safe operating range to prevent acciden...
Productivity measures the efficiency of production, often calculated as output per unit of input over a specific time period.
Productivity = Total Output / Total Input.
Example: If a factory produces 1000 units using 500 hours of labor, productivity = 1000/500 = 2 units/hour.
Higher productivity indicates better efficiency and can lead to increased profitability.
Factors affecting productivity include technology, workforce...
OEE (Overall Equipment Effectiveness) measures manufacturing productivity by evaluating availability, performance, and quality.
OEE = Availability x Performance x Quality.
Availability = (Operating Time / Planned Production Time). Example: 8 hours of operation out of 10 planned hours = 0.8.
Performance = (Actual Output / Maximum Possible Output). Example: 400 units produced vs. 500 units possible = 0.8.
Quality = (Good Uni...
16 losses is not a clear question. Please provide more context.
Please provide more information or context for the question.
Are you referring to 16 losses in a specific system or process?
Are these losses related to efficiency or productivity?
Without more information, it is difficult to provide a specific answer.
Top trending discussions
posted on 17 Apr 2022
I applied via Referral and was interviewed in Oct 2021. There were 2 interview rounds.
Yes, I have experience in designing and analyzing steel structures.
I have worked on various projects involving steel structures such as bridges, buildings, and industrial facilities.
I am familiar with industry standards and codes such as AISC, ASCE, and ACI.
I have experience in using software such as STAAD.Pro and SAP2000 for structural analysis and design.
I have also conducted site inspections and provided recommendat...
Welding is a process of joining two or more metal parts by heating the surfaces to their melting points.
There are several types of welding such as MIG, TIG, Stick, and Flux-Cored welding.
MIG welding uses a wire electrode and a shielding gas to join two metal parts.
TIG welding uses a tungsten electrode and a filler metal to join two metal parts.
Stick welding uses a consumable electrode and a flux coating to join two met...
I applied via Company Website and was interviewed in Jun 2024. There was 1 interview round.
Electrical engineer related
I applied via Naukri.com and was interviewed before May 2018. There were 5 interview rounds.
I applied via Job Fair and was interviewed in May 2018. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Mar 2020. There was 1 interview round.
My unique blend of creativity, analytical skills, and leadership experience sets me apart as an Assistant Manager.
Creative Problem Solver: I developed a new workflow that increased team efficiency by 20%.
Strong Analytical Skills: I utilize data-driven decision-making to optimize project outcomes.
Leadership Experience: I successfully led a team of 10 in a high-pressure environment, fostering collaboration and innovation...
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I faced a critical project deadline with unexpected technical challenges, requiring quick problem-solving and team collaboration.
Led a team during a major software deployment that faced unexpected bugs just days before launch.
Implemented a rapid response strategy, organizing daily stand-ups to address issues in real-time.
Collaborated with cross-functional teams to identify root causes and develop effective solutions.
Su...
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
I applied via Recruitment Consultant and was interviewed in Jun 2020. There was 1 interview round.
I applied via Referral and was interviewed in Aug 2019. There were 3 interview rounds.
Yes, multiple MMEs can be configured in a single eNodeB.
Multiple MMEs (Mobility Management Entities) can be configured in a single eNodeB (Evolved Node B) in LTE networks.
This configuration allows for load balancing and redundancy.
Each MME can handle control plane signaling for a subset of connected UEs (User Equipment).
The eNodeB distributes the UEs among the available MMEs based on various factors like load and capac...
Check network connectivity, restart MME, check configuration settings.
Check if there is any issue with the network connectivity
Restart the MME and check if the alarm disappears
Verify the configuration settings of the MME
Check if there is any hardware failure
Contact the vendor for further assistance
Integration process refers to the process of combining different systems or components into a single unified system.
Integration involves connecting different systems or components to work together seamlessly
It can involve data integration, application integration, or system integration
Integration can be achieved through APIs, middleware, or custom code
Examples of integration include integrating a CRM system with a mark...
based on 5 reviews
Rating in categories
Production Engineer
77
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Assistant Engineer
59
salaries
| ₹2 L/yr - ₹4 L/yr |
Quality Engineer
56
salaries
| ₹1.5 L/yr - ₹4.3 L/yr |
Engineer
46
salaries
| ₹2.8 L/yr - ₹4.8 L/yr |
Junior Engineer
23
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Quess
L&T Construction
Ekart Logistics
Udaan