Filter interviews by
I applied via Recruitment Consultant and was interviewed in Jul 2020. There was 1 interview round.
CAPA stands for Corrective and Preventive Action, while 8D is an eight-step problem-solving process.
CAPA is a process used to identify and address the root cause of a problem, and prevent it from recurring.
8D is a structured problem-solving approach that involves eight steps, including defining the problem, identifying the root cause, and implementing corrective actions.
Both CAPA and 8D are commonly used in quality man...
A report that documents the inspection of a physical layout to ensure it meets design specifications.
Layout inspection report is a document that details the inspection of a physical layout.
It is used to ensure that the layout meets the design specifications.
The report typically includes information on the dimensions, tolerances, and other relevant details of the layout.
It may also include photographs or diagrams to ill...
The basic core tools of quality are a set of techniques used to identify and solve quality-related problems in a systematic manner.
Flowcharts: Used to visualize processes and identify areas of improvement.
Checklists: Used to ensure that all necessary steps are followed and nothing is missed.
Pareto charts: Used to prioritize problems by identifying the most significant factors.
Histograms: Used to analyze data distributi...
7QC tools are a set of quality control tools used to identify and solve quality problems in manufacturing processes.
The tools include Pareto chart, cause-and-effect diagram, flowchart, check sheet, histogram, scatter diagram, and control chart.
They help in identifying the root cause of defects and improving the quality of products.
These tools are widely used in industries such as automotive, electronics, and healthcare...
The procedure of customer complaints involves receiving, acknowledging, investigating, resolving, and following up on complaints.
Receive the complaint from the customer
Acknowledge the complaint and provide a timeline for resolution
Investigate the complaint to identify the root cause
Resolve the complaint by taking appropriate actions
Follow up with the customer to ensure satisfaction and prevent future complaints
LC varies depending on the type of measuring instrument used in the industry.
LC of a thermometer is 0.1°C
LC of a voltmeter is 0.1mV
LC of a ammeter is 0.1mA
LC of a pressure gauge is 0.1bar
LC of a flow meter is 0.1L/min
Quality alert is a notification sent out to inform stakeholders about a quality issue or concern.
Quality alerts are used to prevent or mitigate quality issues.
They are typically sent out by quality control or assurance departments.
Quality alerts may include information on the issue, its impact, and recommended actions.
Examples of quality alerts include product recalls, safety warnings, and process changes.
Top trending discussions
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Naukri.com and was interviewed before May 2018. There were 5 interview rounds.
I applied via Walk-in and was interviewed before Feb 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Feb 2021. There were 5 interview rounds.
1.Probability questions?
2.General science?
A contract term refers to the duration of a contract and the specific conditions that govern it.
Contract term refers to the length of time a contract is valid.
It also includes the specific conditions and obligations of each party involved.
Contract terms can be fixed or flexible depending on the agreement.
Examples of contract terms include payment schedules, termination clauses, and renewal options.
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed in Sep 2023. There were 2 interview rounds.
They gave topic online class vs offline class
Should do answers video for some questions
based on 1 review
Rating in categories
Production Engineer
69
salaries
| ₹2.2 L/yr - ₹4.9 L/yr |
Assistant Engineer
55
salaries
| ₹2 L/yr - ₹4 L/yr |
Quality Engineer
54
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Engineer
43
salaries
| ₹2.4 L/yr - ₹4.5 L/yr |
Junior Engineer
21
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Quess
L&T Construction
Ekart Logistics
Udaan