Upload Button Icon Add office photos

Filter interviews by

Tracks Components Tool Room Engineer Interview Questions and Answers

Updated 18 Nov 2022

Tracks Components Tool Room Engineer Interview Experiences

1 interview found

I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About tool room.die.mould.fixture... Material knowledge
Round 3 - HR 

(1 Question)

  • Q1. About work experience and CTC...

Interview Preparation Tips

Interview preparation tips for other job seekers - Knowledge about tool room work and required machine use.like drilling, milling, surface grinding,etc.all documents and knowledge about die manufacturing material , structure etc .

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
4-6 weeks
Result
No response

I applied via Apna Jobs and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - L&t construction 

(1 Question)

  • Q1. What is your name

Interview Preparation Tips

Interview preparation tips for other job seekers - Good app download now

I applied via Campus Placement and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About Company Atmosphere

Interview Preparation Tips

Interview preparation tips for other job seekers - Go With Full Confidence
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. If in back pressure turbine when inlet flow 40TPH but outlet flow 37TPH exuast then
  • Ans. 

    The back pressure turbine is experiencing a flow imbalance between the inlet and outlet, resulting in a lower outlet flow than the inlet flow.

    • Possible causes could include a restriction in the turbine outlet, leakage in the system, or incorrect measurement of flow rates.

    • Check for any blockages or obstructions in the turbine outlet that may be causing the flow imbalance.

    • Verify the accuracy of the flow measurement device

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
4-6 weeks
Result
No response

I applied via Apna Jobs and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - L&t construction 

(1 Question)

  • Q1. What is your name

Interview Preparation Tips

Interview preparation tips for other job seekers - Good app download now

I applied via Campus Placement and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About Company Atmosphere

Interview Preparation Tips

Interview preparation tips for other job seekers - Go With Full Confidence
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(7 Questions)

  • Q1. How many types of tube mstterls.
  • Ans. 

    There are several types of tube materials used in various industries.

    • Common tube materials include steel, copper, aluminum, and plastic.

    • Steel tubes are often used in construction and industrial applications due to their strength and durability.

    • Copper tubes are commonly used in plumbing and HVAC systems for their excellent heat transfer properties.

    • Aluminum tubes are lightweight and corrosion-resistant, making them suita...

  • Answered by AI
  • Q2. Types of tubes mstterls
  • Ans. 

    Types of tubes materials

    • There are various materials used for tubes, including metals, plastics, and ceramics.

    • Metal tubes are commonly made from stainless steel, copper, or aluminum.

    • Plastic tubes can be made from materials like PVC, polyethylene, or polypropylene.

    • Ceramic tubes are often used in high-temperature applications and can be made from materials like alumina or zirconia.

    • The choice of tube material depends on fa...

  • Answered by AI
  • Q3. How many percentage setting line safety valve.
  • Ans. 

    The percentage setting of a line safety valve depends on the specific system and its requirements.

    • The percentage setting is determined by the pressure drop across the valve and the required flow rate.

    • Typically, line safety valves are set between 10-20% above the system's operating pressure.

    • However, this can vary depending on the specific system and its requirements.

    • It is important to ensure that the valve is set correc...

  • Answered by AI
  • Q4. Desuper heating line are use .
  • Ans. Permary superheter outlet and SSH inlet
  • Answered Anonymously
  • Q5. How many tonn flow attemper flow
  • Ans. 

    The question is asking about the tonnage flow rate of the attemper flow.

    • The tonnage flow rate refers to the amount of material or substance flowing through a system per unit of time.

    • The attemper flow is a term used in control room engineering to describe the flow of a cooling medium, such as water, to regulate temperature.

    • To answer the question, specific data on the attemper flow rate in tons would be required.

  • Answered by AI
  • Q6. Interlocking of boiler
  • Ans. 

    Interlocking of boiler is a safety mechanism that prevents unsafe conditions in the boiler.

    • Interlocking ensures that all safety devices are in place and functioning properly before the boiler can start.

    • It also prevents the boiler from starting if any of the safety devices fail or malfunction.

    • Interlocking can be achieved through electrical or mechanical means.

    • Examples of interlocking devices include pressure switches, t...

  • Answered by AI
  • Q7.  pH value in feed pump and Boiler.
  • Ans. 

    pH value is critical in feed pump and boiler to maintain water quality and prevent corrosion.

    • pH value in feed pump should be between 7.5 to 9.5 to prevent corrosion and scaling

    • pH value in boiler should be between 10.5 to 12.0 to prevent acidic corrosion

    • pH value can be controlled by adding chemicals like sodium hydroxide or sulfuric acid

    • Regular monitoring and adjustment of pH value is necessary to ensure efficient opera

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Many technical interview in THERMAX LTD. Good experience in interview
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Feed water chemistry, Boiler operation parameters, Tripping value, emergency handling, Boiler lightup, Situational analysis
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Working pr of steam in past company?
  • Ans. 

    I have experience working with steam in my past company.

    • Operated and maintained steam control systems

    • Monitored steam pressure and temperature

    • Performed regular inspections and maintenance on steam equipment

    • Troubleshooted and resolved steam-related issues

    • Ensured compliance with safety regulations and protocols

  • Answered by AI
  • Q2. Which type of turbine in past company?
  • Ans. 

    The type of turbine used in my past company was a gas turbine.

    • Gas turbine was used in my past company.

    • Gas turbines are commonly used in power generation and industrial applications.

    • Gas turbines operate by burning fuel to generate high-pressure gas, which then drives a turbine to produce electricity or mechanical power.

  • Answered by AI
  • Q3. Which type of boiler in past company?
  • Ans. 

    The type of boiler in my past company was a high-pressure steam boiler.

    • The boiler in my past company was a high-pressure steam boiler.

    • It was used to generate steam for various industrial processes.

    • The boiler had a capacity of 10,000 pounds of steam per hour.

    • It was equipped with safety features such as pressure relief valves and temperature controls.

    • Regular maintenance and inspections were conducted to ensure its safe a

  • Answered by AI
  • Q4. Which type of Oil used in turbine?
  • Ans. 

    The type of oil used in turbines is typically turbine oil.

    • Turbine oil is specifically designed to meet the lubrication requirements of turbines.

    • It has excellent thermal stability and oxidation resistance.

    • Turbine oil helps reduce friction and wear in the turbine's moving parts.

    • It also provides cooling and helps remove contaminants from the system.

    • Different types of turbine oils are available, such as mineral-based, synt

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Types of work permit?
  • Ans. 

    There are various types of work permits depending on the country and purpose of employment.

    • Temporary work permits

    • Permanent work permits

    • Seasonal work permits

    • Student work permits

    • Intra-company transfer work permits

    • Skilled worker permits

    • Business visit permits

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I like this type of interview. My Performance is increasing step by step.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. What’s your weakness? What’s motivates you?
  • Q2. Tell me about your self without taking your name And the things? Through you will be a know

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and calm!
Just listen the interviewer and reply with taking your time and don’t try to be oversmart if your don’t know the answer just reply sorry! In of saying wrong

Tracks Components Interview FAQs

How many rounds are there in Tracks Components Tool Room Engineer interview?
Tracks Components interview process usually has 3 rounds. The most common rounds in the Tracks Components interview process are Resume Shortlist, Technical and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 715 Interviews
Swiggy Interview Questions
3.8
 • 426 Interviews
Quess Interview Questions
3.9
 • 393 Interviews
TCS iON Interview Questions
3.9
 • 364 Interviews
Planet Spark Interview Questions
3.7
 • 359 Interviews
Udaan Interview Questions
4.0
 • 335 Interviews
Bosch Interview Questions
4.2
 • 333 Interviews
Meesho Interview Questions
3.7
 • 328 Interviews
Zomato Interview Questions
3.8
 • 316 Interviews
TVS Motor Interview Questions
4.0
 • 306 Interviews
View all
Production Engineer
69 salaries
unlock blur

₹2.2 L/yr - ₹5 L/yr

Assistant Engineer
56 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Quality Engineer
54 salaries
unlock blur

₹1.5 L/yr - ₹4 L/yr

Engineer
40 salaries
unlock blur

₹2.4 L/yr - ₹4.5 L/yr

Junior Engineer
23 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Explore more salaries
Compare Tracks Components with

Bharat Forge

3.8
Compare

Samvardhana Motherson Group

3.8
Compare

Sundaram Clayton

4.1
Compare

Ramkrishna Forgings

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview