Filter interviews by
I applied via Referral and was interviewed in Nov 2022. There were 3 interview rounds.
Relocation is feasible based on job requirements, salary expectations, and family considerations.
Relocation can be discussed based on the job location and company policies.
Salary negotiations may influence the decision to relocate; for example, a higher salary may justify moving.
Family considerations, such as spouse employment or children's schooling, play a crucial role in relocation decisions.
Construction planning at site involves creating a detailed schedule of activities and resources required for the project.
Identify project objectives and constraints
Develop a work breakdown structure
Estimate activity durations and dependencies
Allocate resources and create a schedule
Monitor and control progress
Adjust plans as necessary
Top trending discussions
I appeared for an interview in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
I expect a competitive salary that reflects my experience and the value I bring to the team, ideally in the range of $X to $Y.
Research industry standards: For example, according to Glassdoor, the average salary for a Senior Engineer in my area is $X.
Consider my experience: With over Y years in the field, I have successfully led projects that increased efficiency by Z%.
Factor in company size and location: Larger compani...
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Managed various projects including software development, system integration, and process improvement.
Led a team in developing a new software application for streamlining customer data management
Implemented system integration solutions to improve communication between different departments
Executed process improvement initiatives to increase efficiency and reduce costs
Collaborated with cross-functional teams to ensure pr...
Continuous learning, growth, challenging projects, leadership opportunities, work-life balance
Continuous learning and skill development through training and certifications
Opportunities for career growth and advancement
Challenging projects that allow for problem-solving and innovation
Leadership opportunities to mentor and guide junior team members
Maintaining a healthy work-life balance to prevent burnout
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
posted on 23 Aug 2023
Response Surface Methodology (RSM) is a statistical technique used to model and analyze the relationship between a response variable and multiple input variables.
Design a set of experiments based on a factorial design
Collect data from the experiments
Fit a regression model to the data
Analyze the model to determine optimal input settings for the response variable
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I faced a critical project deadline with unexpected technical challenges, requiring quick problem-solving and team collaboration.
Led a team during a major software deployment that faced unexpected bugs just days before launch.
Implemented a rapid response strategy, organizing daily stand-ups to address issues in real-time.
Collaborated with cross-functional teams to identify root causes and develop effective solutions.
Su...
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
based on 2 reviews
Rating in categories
Senior Engineer
142
salaries
| ₹7 L/yr - ₹22 L/yr |
Process Engineer
121
salaries
| ₹5.5 L/yr - ₹16 L/yr |
Senior Principal Engineer
108
salaries
| ₹15 L/yr - ₹38 L/yr |
Deputy Manager
107
salaries
| ₹7 L/yr - ₹22 L/yr |
Piping Designer
107
salaries
| ₹3.7 L/yr - ₹14.7 L/yr |
L&T Construction
Shapoorji Pallonji Group
Saint-Gobain
AECOM