Filter interviews by
I applied via Company Website and was interviewed in Aug 2023. There were 2 interview rounds.
Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of infrastructure projects.
Involves designing and constructing buildings, bridges, roads, dams, and other structures
Focuses on ensuring structures are safe, functional, and sustainable
Requires knowledge of materials, construction techniques, and project management
Involves working with architects, contractors, and gove...
HIRA stands for Hazard Identification and Risk Assessment, while JSA stands for Job Safety Analysis.
HIRA is a systematic process for identifying potential hazards in the workplace and assessing the associated risks.
JSA is a process of breaking down a job into its individual tasks to identify potential hazards and implement safety measures.
Both HIRA and JSA are important tools for ensuring workplace safety and preventin...
WTP stands for Water Treatment Plant and PSTP stands for Prefabricated Sewage Treatment Plant.
WTP is a facility where water is treated to make it safe for consumption or for other purposes.
PSTP is a type of sewage treatment plant that is pre-designed and manufactured off-site before being transported to the final location for installation.
Both WTP and PSTP play crucial roles in ensuring clean water supply and proper se...
I appeared for an interview in Feb 2025, where I was asked the following questions.
involves systematically identifying potential hazards in a workplace or activity and then evaluating the likelihood and severity of harm that could result from those hazards, ultimately aiming to minimize risks
specialized clothing or equipment worn to minimize exposure to workplace hazards and prevent injuries, illnesses, and the spread of infection.
the risk of hazardous atmospheres (toxic, flammable, or oxygen-deficient), engulfment/entrapment, flooding, and extreme temperatures,
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.
Transformers are electrical devices that transfer energy between two or more circuits through electromagnetic induction, ensuring safety and efficiency.
Types of transformers include step-up, step-down, isolation, and auto-transformers.
Safety measures for transformers include proper grounding, regular maintenance, and overcurrent protection.
Friction in transformers can lead to overheating and insulation breakdown, so pr...
Change of scope refers to any modifications or additions to the original project plan.
Change of scope can include additional work, removal of work, or alterations to existing work.
It is important to document any changes in scope to avoid disputes later on.
Changes in scope may impact project timelines, costs, and resources.
Examples of change of scope include client requests for additional features, design changes, or un...
Tata Steel Utilities and Infrastructure Services interview questions for popular designations
Get interview-ready with Top Tata Steel Utilities and Infrastructure Services Interview Questions
Water treatment plant process involves several steps. In case of pressure pump running anticlockwise, the pump should be stopped and checked. In case of power failure, the generator should be started. Running amper is the measure of electrical current flowing through a circuit.
Water treatment plant process involves coagulation, sedimentation, filtration, and disinfection.
If pressure pump is running anticlockwise, it ma...
I applied via Campus Placement and was interviewed in Mar 2023. There were 4 interview rounds.
There were several questions on aptitude of intermediate level. One having a strong mathematics base can easily clear the round.
In this round there will be a group of 5 or 7 students and a topic was given which everyone had to put their views upon.
I applied via Job Portal and was interviewed in Mar 2023. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 2 interview rounds.
Top trending discussions
The duration of Tata Steel Utilities and Infrastructure Services interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 32 interviews
Interview experience
based on 343 reviews
Rating in categories
Project Officer
73
salaries
| ₹2.5 L/yr - ₹7.5 L/yr |
Assistant Manager
49
salaries
| ₹4.3 L/yr - ₹9.5 L/yr |
Deputy Manager
40
salaries
| ₹6 L/yr - ₹12 L/yr |
Manager
26
salaries
| ₹4.6 L/yr - ₹16 L/yr |
Senior Officer
25
salaries
| ₹4.8 L/yr - ₹8 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon