Upload Button Icon Add office photos

Filter interviews by

Tata Steel Utilities and Infrastructure Services Civil Engineer Interview Questions and Answers

Updated 25 Sep 2023

Tata Steel Utilities and Infrastructure Services Civil Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is civil engineering
  • Ans. 

    Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of infrastructure projects.

    • Involves designing and constructing buildings, bridges, roads, dams, and other structures

    • Focuses on ensuring structures are safe, functional, and sustainable

    • Requires knowledge of materials, construction techniques, and project management

    • Involves working with architects, contractors, and gove...

  • Answered by AI
  • Q2. Civil engineering is build anything for other faculties
  • Q3. What is HIRA and JSA
  • Ans. 

    HIRA stands for Hazard Identification and Risk Assessment, while JSA stands for Job Safety Analysis.

    • HIRA is a systematic process for identifying potential hazards in the workplace and assessing the associated risks.

    • JSA is a process of breaking down a job into its individual tasks to identify potential hazards and implement safety measures.

    • Both HIRA and JSA are important tools for ensuring workplace safety and preventin...

  • Answered by AI
  • Q4. Hira-Hazard identification risk assessment
  • Q5. What is wtp and PSTP
  • Ans. 

    WTP stands for Water Treatment Plant and PSTP stands for Prefabricated Sewage Treatment Plant.

    • WTP is a facility where water is treated to make it safe for consumption or for other purposes.

    • PSTP is a type of sewage treatment plant that is pre-designed and manufactured off-site before being transported to the final location for installation.

    • Both WTP and PSTP play crucial roles in ensuring clean water supply and proper se...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - All ways be positive for interview

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Steel structures
  • Q2. Shuttering work
  • Q3. Steel structures bbs

Interview Preparation Tips

Interview preparation tips for other job seekers - # Work experience #
∞ . Conventional shuttering, ∞. Aluform shuttering. system formwork,
∞. Reinforcement checking and BBS
∞. Site execution as per drowning.

★. 3rd year experience and at Alcove Developers LLP , high-rise, residential building project, new kalkata project - 22 nos tower (G+30) with non - tower, club house, road , stp , RWHT , from 15 th December, 2020 currently working in this role ( G+2 podium+ 28 typical floor) tower in charge.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at Vani Vidya Bithi, Kolkata and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Aptitude, verbal, core, logical questions

Round 2 - Technical 

(3 Questions)

  • Q1. Questions from favourite subject
  • Q2. BMD of a frame
  • Ans. 

    BMD of a frame refers to the bending moment diagram which shows the variation of bending moment along the length of a structural frame.

    • BMD is a graphical representation of the variation of bending moment in a structural frame.

    • It helps in analyzing the internal forces and stresses in the frame.

    • BMD is typically plotted with the bending moment on the y-axis and the length of the frame on the x-axis.

    • The BMD can be used to ...

  • Answered by AI
  • Q3. Base pressure diagram of foundation
  • Ans. 

    Base pressure diagram of foundation shows the distribution of pressure on the foundation base.

    • Base pressure diagram helps in understanding how the load is distributed on the foundation base.

    • It is important for designing foundations to ensure they can support the load effectively.

    • The diagram typically shows higher pressure under the columns and lower pressure in between.

    • It is used to determine the size and depth of the ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You need in depth knowlege of subject and they can ask you to design a foundation.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How to find grades of concrete which is already mixed
  • Ans. 

    Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.

    • Perform a slump test to determine the workability of the concrete mix.

    • Take samples from the mixed batch and cast test specimens for compressive strength testing.

    • Conduct compressive strength tests on the specimens to determine the grade of concrete.

    • Compare the test results with the standar

  • Answered by AI
  • Q2. What are the site and laboratory test on bricks and cement
  • Ans. 

    Site and laboratory tests on bricks and cement are essential for ensuring quality and durability of construction materials.

    • Site tests for bricks include visual inspection, water absorption test, compressive strength test, and efflorescence test.

    • Laboratory tests for bricks involve water absorption test, compressive strength test, efflorescence test, and soundness test.

    • Site tests for cement include checking the color, sm...

  • Answered by AI
  • Q3. Plastering work calculation for different size of wall
  • Ans. 

    Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.

    • Calculate the surface area of the wall by multiplying the height and length of each wall segment.

    • Determine the total surface area to be plastered by adding up the surface areas of all wall segments.

    • Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.

    • Consi...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. BB, measurements
Round 3 - HR 

(1 Question)

  • Q1. Basic about previous company and CTC
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. What is your CTC
  • Ans. 

    My current CTC is $80,000 per year.

    • My current CTC is $80,000 per year

    • It includes base salary, bonuses, and benefits

    • I am open to negotiation based on the job role and responsibilities

  • Answered by AI
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Nov 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

Question from data interpretation

Round 3 - Aptitude Test 

Question from percentage aur arithmetic based

Round 4 - Group Discussion 

Topic related to general awareness

Interview Preparation Tips

Topics to prepare for L&T Construction Civil Engineer interview:
  • Company
  • L&t
  • History of l&t
Interview preparation tips for other job seekers - Ambition is the first step to success the second step is action.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Any civil engineer work 12 year experience

Round 2 - Technical 

(2 Questions)

  • Q1. What is your company name
  • Q2. Location in my nearest home town

Interview Preparation Tips

Interview preparation tips for other job seekers - Hard work and clear attitude

I applied via Naukri.com and was interviewed in Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Question is about where you current working ,past working releted question for experience person and some steel BBS question
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via campus placement at Motilal Nehru Institute National Institute of Technology (NIT), Allahabad and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Question had been asked from civil engineering syllabus

Round 3 - Technical 

(3 Questions)

  • Q1. It's selection process was very smooth just easy to medium Technical question had been asked during interview
  • Q2. It is based on Student area of interest
  • Q3. Basic HR question also had been asked only for confirmation

Interview Preparation Tips

Interview preparation tips for other job seekers - Student should have good knowledge in their area of interest subject

Tata Steel Utilities and Infrastructure Services Interview FAQs

How many rounds are there in Tata Steel Utilities and Infrastructure Services Civil Engineer interview?
Tata Steel Utilities and Infrastructure Services interview process usually has 2 rounds. The most common rounds in the Tata Steel Utilities and Infrastructure Services interview process are Resume Shortlist and Technical.
What are the top questions asked in Tata Steel Utilities and Infrastructure Services Civil Engineer interview?

Some of the top questions asked at the Tata Steel Utilities and Infrastructure Services Civil Engineer interview -

  1. What is civil engineer...read more
  2. What is HIRA and ...read more
  3. What is wtp and P...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Tata Steel Utilities and Infrastructure Services interview
Company Website
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
36% less than the average Civil Engineer Salary in India
View more details

Tata Steel Utilities and Infrastructure Services Civil Engineer Reviews and Ratings

based on 3 reviews

3.7/5

Rating in categories

4.3

Skill development

4.3

Work-Life balance

3.4

Salary & Benefits

3.7

Job Security

4.0

Company culture

3.4

Promotions/Appraisal

3.7

Work Satisfaction

Explore 3 Reviews and Ratings
Project Officer
66 salaries
unlock blur

₹2.5 L/yr - ₹7.1 L/yr

Assistant Manager
46 salaries
unlock blur

₹4.3 L/yr - ₹9 L/yr

Manager
33 salaries
unlock blur

₹4.6 L/yr - ₹16 L/yr

Deputy Manager
33 salaries
unlock blur

₹6 L/yr - ₹12.4 L/yr

Senior Officer
21 salaries
unlock blur

₹4.8 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Tata Steel Utilities and Infrastructure Services with

Larsen & Toubro Limited

4.0
Compare

Reliance Infrastructure

4.1
Compare

Adani Enterprises

3.8
Compare

Essar Group

3.8
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview