Premium Employer

i

This company page is being actively managed by Tata Projects Team. If you also belong to the team, you can get access from here

Tata Projects

Compare button icon Compare button icon Compare
4.2

based on 5k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Tata Projects Assistant Quantity Surveyor Manager Interview Questions, Process, and Tips

Updated 16 Jan 2023

Tata Projects Assistant Quantity Surveyor Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(9 Questions)

  • Q1. Tell us about yourself in terms of your work experience?
  • Ans. 

    I have 5 years of experience as a Quantity Surveyor, managing projects and ensuring cost efficiency.

    • 5 years of experience as a Quantity Surveyor

    • Managed projects and ensured cost efficiency

    • Strong knowledge of quantity surveying principles and practices

    • Proficient in using software such as AutoCAD and Excel

    • Collaborated with architects, engineers, and contractors to ensure project success

  • Answered by AI
  • Q2. How many type of contracts are there?
  • Ans. 

    There are several types of contracts, including lump sum, cost plus, time and material, and unit price.

    • Lump sum contracts involve a fixed price for the entire project.

    • Cost plus contracts involve reimbursement of actual costs plus a fee for the contractor.

    • Time and material contracts involve payment for labor and materials based on actual usage.

    • Unit price contracts involve payment based on a fixed unit price for specific...

  • Answered by AI
  • Q3. Explain Project Bidding process?
  • Ans. 

    Project bidding process involves submitting proposals to clients for a construction project.

    • Identify potential projects and clients

    • Prepare a bid proposal including cost estimates, project timeline, and scope of work

    • Submit the bid proposal to the client

    • Client evaluates the proposals and selects the winning bid

    • Negotiate contract terms and sign the agreement

  • Answered by AI
  • Q4. How to reconcile steel?
  • Ans. 

    Reconciling steel involves verifying the quantity and quality of steel delivered and used in a project.

    • Compare the steel delivery note with the purchase order and the bill of quantities to ensure the correct quantity and type of steel has been delivered.

    • Inspect the steel to ensure it meets the required quality standards and specifications.

    • Record the quantity and quality of steel used in the project to ensure it matches...

  • Answered by AI
  • Q5. What is item rate analysis and how to do that?
  • Ans. 

    Item rate analysis is a method used in construction projects to determine the cost of each item or component of the project.

    • It involves breaking down the project into smaller components or items.

    • The cost of each item is then calculated based on the materials, labor, and other expenses required to complete it.

    • This helps in accurate cost estimation and budgeting for the project.

    • For example, in a building project, item ra...

  • Answered by AI
  • Q6. How to do pre construction planning? What are the main steps in that?
  • Ans. 

    Pre construction planning involves several steps to ensure successful project execution.

    • Identify project goals and objectives

    • Conduct site analysis and feasibility studies

    • Develop project scope and budget

    • Create project schedule and timeline

    • Establish communication and collaboration protocols

    • Obtain necessary permits and approvals

    • Identify potential risks and develop risk management plan

    • Select project team and assign roles a...

  • Answered by AI
  • Q7. What is your roles & responsibility on site?
  • Ans. 

    As an Assistant Quantity Surveyor Manager, my roles and responsibilities on site include cost estimation, quantity takeoff, contract administration, and project coordination.

    • Preparing cost estimates and budgets for construction projects

    • Conducting quantity takeoff and preparing bills of quantities

    • Assisting in contract administration, including reviewing and negotiating contracts

    • Monitoring project progress and ensuring c...

  • Answered by AI
  • Q8. What is per sft cost of- A. Concreting B. Steel C. Shuttering D. Plaster E. Paint F. Waterproofing
  • Ans. 

    As an Assistant Quantity Surveyor Manager, I cannot provide per sft cost without detailed project information.

    • The per sft cost of construction materials varies depending on the project location, size, and complexity.

    • Factors such as labor costs, transportation costs, and material quality also affect the per sft cost.

    • It is important to conduct a detailed cost analysis for each project to determine accurate per sft cost.

    • W...

  • Answered by AI
  • Q9. Labour output of various activities
  • Ans. 

    Labour output varies depending on the activity being performed.

    • The output of manual labour is generally lower than that of machine labour.

    • The skill level of the labourer also affects the output.

    • The type of activity being performed also affects the output.

    • For example, laying bricks may have a lower output than painting walls.

    • The output can be measured in units such as square meters or cubic meters.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. Prepare well before you appear for interview.
2. Ans should be clear and crisp.
3. Take your time to explain your point.
4. Listen carefully before answering

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Dec 2023.

Round 1 - Technical 

(5 Questions)

  • Q1. What is the standard deduction as per IS 1200?
  • Ans. 

    The standard deduction as per IS 1200 is a fixed amount that can be deducted from the measured quantities of certain items in a construction project.

    • The standard deduction is typically used for items like scaffolding, formwork, and centering in construction projects.

    • It is a fixed percentage of the measured quantity, usually ranging from 2% to 5% depending on the item and project.

    • The purpose of the standard deduction is...

  • Answered by AI
  • Q2. Steel reconciliation
  • Q3. Material properties
  • Ans. 

    Material properties refer to the characteristics and behavior of materials used in construction projects.

    • Material properties include density, strength, durability, thermal conductivity, and elasticity.

    • Understanding material properties is crucial for selecting the right materials for a project.

    • Examples of material properties affecting construction include water absorption in concrete and thermal expansion in metals.

  • Answered by AI
  • Q4. Price escalation
  • Q5. Rate Analysis, Budgeting, Client billing
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About experience, current salary, expected salary and notice period
Round 2 - Technical 

(1 Question)

  • Q1. About technical knowledge of current designation
Round 3 - One-on-one 

(1 Question)

  • Q1. About technical knowledge currently project

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go with extraordinary, reply to interviewer what you actually know
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via LinkedIn and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(3 Questions)

  • Q1. After one round from Walk in Interview didn't call for 2nd round although they b committed for the same
  • Q2. Technical questions in viva plus written test
  • Q3. Theoretical test
Round 2 - One-on-one 

(2 Questions)

  • Q1. Never called for second round
  • Q2. Yes didn't call even after selection from 1st round

Interview Preparation Tips

Interview preparation tips for other job seekers - don't expect from walk in interview
Interview experience
4
Good
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. How many years of experience do you have as a Quantity Surveyor?
  • Q2. What is the Current CTC & Expected CTC?
  • Ans. 

    Current CTC is $60,000 and Expected CTC is $70,000.

    • Current CTC is the current annual salary of the candidate.

    • Expected CTC is the annual salary the candidate is expecting from the new job.

    • It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.

    • For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.

  • Answered by AI
  • Q3. How much is the notice period in present company?
  • Q4. What is your family background?
  • Q5. Why you are planning to relocate?
  • Q6. Did you apply for any job previously with Aarvee Associates?
Round 3 - Technical 

(6 Questions)

  • Q1. Brief about yourself?
  • Q2. Do you involve in doing Cost Estimations and what type of Estimates you prepared?
  • Ans. 

    Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.

    • I prepare detailed estimates based on quantities of materials and labor required for a project.

    • I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.

    • I use software tools...

  • Answered by AI
  • Q3. How do you verify the bill which is submitted by the Contractor/Concessionaire?
  • Ans. 

    Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.

    • Check quantities mentioned in the bill against the actual work done on site.

    • Verify rates and unit prices for each item in the bill with the contract agreement.

    • Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.

    • Conduct site measurements to confirm the work completed matches the

  • Answered by AI
  • Q4. What are the evidential documents required to scrutiny the RA Bill?
  • Ans. 

    Evidential documents required for scrutinizing the RA Bill

    • Contract documents

    • Measurement sheets

    • Bills of quantities

    • Variation orders

    • Payment certificates

  • Answered by AI
  • Q5. How do you justify the change of scope works which are to be recommended to the authority?
  • Ans. 

    Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.

    • Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.

    • Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...

  • Answered by AI
  • Q6. What are the basic inputs for preparing the Bill of Quantities?
  • Ans. 

    Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.

    • Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.

    • Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.

    • Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Aarvee Associates Quantity Surveyor interview:
  • Bill of Quantities
  • Schedules in Contract Agreement
  • Rate Analysis methods
  • Bill Procedures
Interview preparation tips for other job seekers - Required minimum 5 years of experience as a Quantity Surveyor in a relevant field, then you will easily crack the interview.

I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Tell me about your roles and responsibilities as Quantity Surveyor

Interview Preparation Tips

Interview preparation tips for other job seekers - everything detailed will be asked on what is written on resume

Interview Questionnaire 

9 Questions

  • Q1. What is rolling margin
  • Ans. 

    Rolling margin is a financial term that refers to the difference between the revenue generated and the variable costs incurred over a specific period of time.

    • Rolling margin is used to measure the profitability of a business or project.

    • It helps in assessing the efficiency of operations and identifying areas for cost reduction.

    • The formula for calculating rolling margin is: (Revenue - Variable Costs) / Revenue * 100.

    • For e...

  • Answered by AI
  • Q2. What will you do if the site qty differ from Drawing qty
  • Ans. 

    If the site quantity differs from the drawing quantity, I will take the following steps to address the issue.

    • I will review the drawings and specifications to ensure accuracy.

    • I will communicate with the project team, including the architect and engineer, to clarify any discrepancies.

    • I will conduct a site visit to physically verify the quantities and compare them with the drawings.

    • If there are significant differences, I ...

  • Answered by AI
  • Q3. Tell me about ur self
  • Q4. What is reconciliation of steel
  • Ans. 

    Reconciliation of steel involves comparing the actual quantity of steel used in a construction project with the estimated quantity.

    • Reconciliation of steel is a process used in construction projects to ensure that the actual quantity of steel used matches the estimated quantity.

    • It involves comparing the quantity of steel recorded in the project's documentation, such as drawings and specifications, with the quantity of s...

  • Answered by AI
  • Q5. What is the procedure for BBS
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a concrete element.

    • BBS is prepared based on the structural drawings and specifications.

    • It includes the diameter, length, shape, and number of reinforcement bars required for the element.

    • BBS helps in estimating the quantity of steel required and also ensures the correct placement of reinforcement bars.

    • It is an essential document for t...

  • Answered by AI
  • Q6. How you do the rate analysis
  • Ans. 

    Rate analysis is done by breaking down the cost of each item in a construction project to determine the overall cost.

    • Rate analysis involves breaking down the cost of each item in a construction project.

    • The cost of materials, labor, and equipment is analyzed to determine the overall cost.

    • Quantities of each item are measured and multiplied by their respective rates to calculate the cost.

    • Rate analysis helps in estimating ...

  • Answered by AI
  • Q7. What is margin for OH & Profits in Rate analysis
  • Ans. 

    Margin for OH & Profits in rate analysis is the additional amount added to cover overhead costs and generate profit.

    • Margin for OH & Profits is added to the direct cost of a project to cover indirect costs and generate profit.

    • It is usually expressed as a percentage of the direct cost.

    • The margin for OH & Profits varies depending on the nature of the project and market conditions.

    • For example, if the direct cost of a proje...

  • Answered by AI
  • Q8. Wastage % for Reinforcement Steel
  • Ans. 

    The wastage percentage for reinforcement steel varies depending on factors such as project complexity and workmanship.

    • Wastage percentage for reinforcement steel is typically estimated between 2-5%.

    • Factors such as project complexity, workmanship, and site conditions can affect the wastage percentage.

    • Proper planning, accurate cutting, and careful handling can help minimize wastage.

    • Examples of wastage include incorrect cu...

  • Answered by AI
  • Q9. Code for Structural steel and reinforced steel
  • Ans. 

    The code for structural steel is typically governed by the American Institute of Steel Construction (AISC) while reinforced steel is governed by the American Concrete Institute (ACI).

    • Structural steel is commonly used in the construction of buildings, bridges, and other structures.

    • The AISC provides standards and guidelines for the design, fabrication, and erection of structural steel.

    • Reinforced steel, also known as reba...

  • Answered by AI

I applied via Company Website and was interviewed before Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Some basic questions of mathematics up to 10th class.

Round 3 - HR 

(3 Questions)

  • Q1. Current company role and responsibility
  • Q2. Why are you change your current company
  • Q3. What is your current salary and what's you accept to us

Interview Preparation Tips

Interview preparation tips for other job seekers - Please keep in mind iscode 1200 and cpwd specification volume1 and 2.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Apr 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Aptitude Test 

It was around 5-10 minutes online test.

Round 3 - Technical 

(1 Question)

  • Q1. Questions related to Client and Subcontractor Billing, Code related to Subcontractors billing, Statutory additions and deductions in payments related to client and subcontractor bills.
Round 4 - Technical 

(2 Questions)

  • Q1. Regarding reconciliation of Material
  • Q2. What is the percentage of wastage
  • Ans. 

    The percentage of wastage varies depending on the project and materials used.

    • The percentage of wastage can be calculated by dividing the amount of material wasted by the total amount of material used and multiplying by 100.

    • Factors that can contribute to wastage include poor planning, inaccurate measurements, and human error.

    • The percentage of wastage can be reduced through careful planning, accurate measurements, and pr...

  • Answered by AI
Round 5 - HR 

(1 Question)

  • Q1. Your current CTC and your expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - All interviews done telephonically, you may choose the convenient time for your interview by requesting the same.

I applied via Referral and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Aptitude Test 

General mathematical question like work, force, percentage etc.

Round 3 - Technical 

(4 Questions)

  • Q1. What type of boq you worked earlier ?
  • Q2. What is Secured advance in client billing ?
  • Ans. 

    Secured advance in client billing is a payment made by the client to the contractor before the work is completed.

    • It is a form of pre-payment made by the client to the contractor

    • It is usually made to help the contractor cover the cost of materials and labor before the work is completed

    • The amount of the secured advance is usually a percentage of the total contract value

    • The contractor must provide security for the advance...

  • Answered by AI
  • Q3. Shear force max at which point ?
  • Ans. 

    Shear force max depends on the material and cross-sectional shape of the beam.

    • Shear force max is the maximum force that a beam can withstand before it fails in shear.

    • It depends on the material properties of the beam, such as its yield strength and modulus of elasticity.

    • It also depends on the cross-sectional shape of the beam, such as whether it is rectangular, circular, or I-shaped.

    • Calculating shear force max requires ...

  • Answered by AI
  • Q4. Wastage percentage of diff types of work
  • Ans. 

    The wastage percentage varies depending on the type of work.

    • Wastage percentage for construction work can range from 5% to 20% depending on the type of material used.

    • For electrical work, the wastage percentage can be around 2% to 5% due to damaged or defective components.

    • In plumbing work, the wastage percentage can be around 10% to 15% due to incorrect measurements or damaged pipes.

    • For painting work, the wastage percent...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Very polite and humble , he guided if any wrong answer you will give

Tata Projects Interview FAQs

How many rounds are there in Tata Projects Assistant Quantity Surveyor Manager interview?
Tata Projects interview process usually has 2 rounds. The most common rounds in the Tata Projects interview process are One-on-one Round and Resume Shortlist.
What are the top questions asked in Tata Projects Assistant Quantity Surveyor Manager interview?

Some of the top questions asked at the Tata Projects Assistant Quantity Surveyor Manager interview -

  1. How many type of contracts are the...read more
  2. What is item rate analysis and how to do th...read more
  3. What is per sft cost of- A. Concreting B. Steel C. Shuttering D. Plaster E. Pai...read more

Tell us how to improve this page.

Join Tata Projects Simplify. Create.

Interview Questions from Similar Companies

KEC International Interview Questions
4.1
 • 286 Interviews
TCE Interview Questions
3.8
 • 240 Interviews
Saint-Gobain Interview Questions
4.0
 • 169 Interviews
Worley Interview Questions
4.1
 • 107 Interviews
View all
Tata Projects Assistant Quantity Surveyor Manager Salary
based on 7 salaries
₹4.5 L/yr - ₹9.1 L/yr
14% less than the average Assistant Quantity Surveyor Manager Salary in India
View more details

Tata Projects Assistant Quantity Surveyor Manager Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

-

Skill development

-

Work-life balance

-

Salary

-

Job security

-

Company culture

-

Promotions

-

Work satisfaction

Explore 1 Review and Rating
Deputy Manager
1.1k salaries
unlock blur

₹5.8 L/yr - ₹17 L/yr

Assistant Manager
850 salaries
unlock blur

₹5 L/yr - ₹14.8 L/yr

Senior Engineer
400 salaries
unlock blur

₹4 L/yr - ₹14 L/yr

Manager
397 salaries
unlock blur

₹8 L/yr - ₹24.1 L/yr

Senior Manager
346 salaries
unlock blur

₹10.4 L/yr - ₹32.5 L/yr

Explore more salaries
Compare Tata Projects with

Larsen & Toubro Limited

4.0
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview