An update survey is a follow-up survey conducted to gather new information or verify existing data.
Update surveys are typically conducted to assess changes in a project site or to verify previous survey data.
They may involve measuring new structures, boundaries, or features that were not included in the original survey.
Update surveys help ensure that project plans and estimates are accurate and up-to-date.
Examples of u...
Iam not interested in my office, but Side.
No education and me in my school.
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
Current CTC is $60,000 and Expected CTC is $70,000.
Current CTC is the current annual salary of the candidate.
Expected CTC is the annual salary the candidate is expecting from the new job.
It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.
For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.
Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.
I prepare detailed estimates based on quantities of materials and labor required for a project.
I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.
I use software tools...
Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.
Check quantities mentioned in the bill against the actual work done on site.
Verify rates and unit prices for each item in the bill with the contract agreement.
Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.
Conduct site measurements to confirm the work completed matches the
Evidential documents required for scrutinizing the RA Bill
Contract documents
Measurement sheets
Bills of quantities
Variation orders
Payment certificates
Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.
Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.
Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...
Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.
Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.
Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.
Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...
posted on 17 Apr 2022
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in May 2021. There were 4 interview rounds.
Rolling margin is a financial term that refers to the difference between the revenue generated and the variable costs incurred over a specific period of time.
Rolling margin is used to measure the profitability of a business or project.
It helps in assessing the efficiency of operations and identifying areas for cost reduction.
The formula for calculating rolling margin is: (Revenue - Variable Costs) / Revenue * 100.
For e...
If the site quantity differs from the drawing quantity, I will take the following steps to address the issue.
I will review the drawings and specifications to ensure accuracy.
I will communicate with the project team, including the architect and engineer, to clarify any discrepancies.
I will conduct a site visit to physically verify the quantities and compare them with the drawings.
If there are significant differences, I ...
Reconciliation of steel involves comparing the actual quantity of steel used in a construction project with the estimated quantity.
Reconciliation of steel is a process used in construction projects to ensure that the actual quantity of steel used matches the estimated quantity.
It involves comparing the quantity of steel recorded in the project's documentation, such as drawings and specifications, with the quantity of s...
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a concrete element.
BBS is prepared based on the structural drawings and specifications.
It includes the diameter, length, shape, and number of reinforcement bars required for the element.
BBS helps in estimating the quantity of steel required and also ensures the correct placement of reinforcement bars.
It is an essential document for t...
Rate analysis is done by breaking down the cost of each item in a construction project to determine the overall cost.
Rate analysis involves breaking down the cost of each item in a construction project.
The cost of materials, labor, and equipment is analyzed to determine the overall cost.
Quantities of each item are measured and multiplied by their respective rates to calculate the cost.
Rate analysis helps in estimating ...
Margin for OH & Profits in rate analysis is the additional amount added to cover overhead costs and generate profit.
Margin for OH & Profits is added to the direct cost of a project to cover indirect costs and generate profit.
It is usually expressed as a percentage of the direct cost.
The margin for OH & Profits varies depending on the nature of the project and market conditions.
For example, if the direct cost of a proje...
The wastage percentage for reinforcement steel varies depending on factors such as project complexity and workmanship.
Wastage percentage for reinforcement steel is typically estimated between 2-5%.
Factors such as project complexity, workmanship, and site conditions can affect the wastage percentage.
Proper planning, accurate cutting, and careful handling can help minimize wastage.
Examples of wastage include incorrect cu...
The code for structural steel is typically governed by the American Institute of Steel Construction (AISC) while reinforced steel is governed by the American Concrete Institute (ACI).
Structural steel is commonly used in the construction of buildings, bridges, and other structures.
The AISC provides standards and guidelines for the design, fabrication, and erection of structural steel.
Reinforced steel, also known as reba...
posted on 2 Jun 2021
I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.
posted on 6 Jul 2024
posted on 7 Jul 2023
I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.
Quantity surveyors play a crucial role in road projects by estimating costs, managing budgets, and ensuring project efficiency.
Estimating costs for materials, labor, and equipment
Preparing tender documents and contracts
Managing project budgets and costs
Conducting cost analysis and value engineering
Ensuring compliance with regulations and specifications
Providing financial advice and risk management
Collaborating with eng...
Billing is the process of creating and sending invoices to clients for services or products provided.
Prepare detailed breakdown of costs incurred
Calculate quantities and rates for each item
Include any additional charges or discounts
Generate invoice and send to client for payment
Track payments and follow up on overdue invoices
Inputs for Cost Estimations include project scope, materials, labor costs, equipment costs, overhead costs, and profit margin.
Project scope: Detailed understanding of the project requirements and deliverables.
Materials: Cost of all materials required for the project.
Labor costs: Cost of labor required to complete the project.
Equipment costs: Cost of any equipment or machinery needed for the project.
Overhead costs: Addi...
I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.
Cost to complete refers to the estimated amount of money required to finish a project or task.
Cost to complete is an important metric used in project management and quantity surveying.
It takes into account the remaining work, resources, and expenses needed to complete a project.
It helps in assessing the financial status of a project and making informed decisions.
Cost to complete can be calculated by subtracting the act...
Unit weight of steel bars varies based on their diameter and length.
The weight of steel bars is measured in kilograms per meter (kg/m).
The unit weight of steel bars ranges from 0.785 kg/m to 6.16 kg/m depending on their diameter.
For example, a 10mm diameter steel bar weighs around 0.62 kg/m while a 32mm diameter steel bar weighs around 6.16 kg/m.
Interview experience
Deputy Manager
607
salaries
| ₹6 L/yr - ₹16 L/yr |
Senior Engineer
426
salaries
| ₹4 L/yr - ₹12 L/yr |
Construction Engineer
304
salaries
| ₹2.4 L/yr - ₹9 L/yr |
Civil Site Engineer
227
salaries
| ₹1.5 L/yr - ₹9 L/yr |
Safety Officer
225
salaries
| ₹1.8 L/yr - ₹7.5 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra