i
Tata Projects
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.
I have 5 years of experience as a Quantity Surveyor, managing projects and ensuring cost efficiency.
5 years of experience as a Quantity Surveyor
Managed projects and ensured cost efficiency
Strong knowledge of quantity surveying principles and practices
Proficient in using software such as AutoCAD and Excel
Collaborated with architects, engineers, and contractors to ensure project success
There are several types of contracts, including lump sum, cost plus, time and material, and unit price.
Lump sum contracts involve a fixed price for the entire project.
Cost plus contracts involve reimbursement of actual costs plus a fee for the contractor.
Time and material contracts involve payment for labor and materials based on actual usage.
Unit price contracts involve payment based on a fixed unit price for specific...
Project bidding process involves submitting proposals to clients for a construction project.
Identify potential projects and clients
Prepare a bid proposal including cost estimates, project timeline, and scope of work
Submit the bid proposal to the client
Client evaluates the proposals and selects the winning bid
Negotiate contract terms and sign the agreement
Reconciling steel involves verifying the quantity and quality of steel delivered and used in a project.
Compare the steel delivery note with the purchase order and the bill of quantities to ensure the correct quantity and type of steel has been delivered.
Inspect the steel to ensure it meets the required quality standards and specifications.
Record the quantity and quality of steel used in the project to ensure it matches...
Item rate analysis is a method used in construction projects to determine the cost of each item or component of the project.
It involves breaking down the project into smaller components or items.
The cost of each item is then calculated based on the materials, labor, and other expenses required to complete it.
This helps in accurate cost estimation and budgeting for the project.
For example, in a building project, item ra...
Pre construction planning involves several steps to ensure successful project execution.
Identify project goals and objectives
Conduct site analysis and feasibility studies
Develop project scope and budget
Create project schedule and timeline
Establish communication and collaboration protocols
Obtain necessary permits and approvals
Identify potential risks and develop risk management plan
Select project team and assign roles a...
As an Assistant Quantity Surveyor Manager, my roles and responsibilities on site include cost estimation, quantity takeoff, contract administration, and project coordination.
Preparing cost estimates and budgets for construction projects
Conducting quantity takeoff and preparing bills of quantities
Assisting in contract administration, including reviewing and negotiating contracts
Monitoring project progress and ensuring c...
As an Assistant Quantity Surveyor Manager, I cannot provide per sft cost without detailed project information.
The per sft cost of construction materials varies depending on the project location, size, and complexity.
Factors such as labor costs, transportation costs, and material quality also affect the per sft cost.
It is important to conduct a detailed cost analysis for each project to determine accurate per sft cost.
W...
Labour output varies depending on the activity being performed.
The output of manual labour is generally lower than that of machine labour.
The skill level of the labourer also affects the output.
The type of activity being performed also affects the output.
For example, laying bricks may have a lower output than painting walls.
The output can be measured in units such as square meters or cubic meters.
posted on 11 May 2018
I was interviewed before Mar 2020.
posted on 18 Jan 2020
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Maintain elevation of underground piping by using level instruments and proper installation techniques.
Use a level instrument to check the elevation of the piping during installation.
Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.
Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.
Consider using supports o...
In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer complaints and resolved issues in a timely manner
Created and implemented strategies to improve efficiency and productivity
Collaborated with other departments to achieve company goals
Conducted performanc
Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.
Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.
Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.
Cast iron electrodes have a high nickel content to prevent cracking.
Aluminum electrodes have a special coating ...
posted on 12 Oct 2020
I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.
posted on 4 Mar 2022
I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.
posted on 18 Oct 2021
I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.
posted on 23 Oct 2021
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 2 May 2021
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Deputy Manager
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
719
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
407
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
387
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
366
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Reliance Infrastructure
GMR Group
Hindustan Construction Company