I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
Cement consumption of M20 concrete mix ratio is 360 kg/m3.
M20 concrete mix ratio is 1:1.5:3 (1 part cement, 1.5 parts sand, 3 parts aggregate)
Cement consumption for 1 m3 of M20 concrete is 360 kg
To calculate total cement consumption, multiply 360 kg by the volume of concrete needed
Extra items added in billing should be justified with proper documentation and approval.
Ensure that the extra item was actually used on the project
Check if the extra item was approved by the client or project manager
Document the reason for adding the extra item in the billing
Provide evidence such as photos or receipts to support the inclusion of the extra item
Rate analysis involves calculating the cost of various items in a construction project.
Rate analysis helps in determining the cost of materials, labor, and equipment for each item in a project.
It involves breaking down the total cost into components like material cost, labor cost, machinery cost, and overheads.
Rate analysis is essential for accurate budgeting and cost estimation in construction projects.
For example, in...
What people are saying about Tata Projects
posted on 6 Dec 2017
Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.
Optimize processes to eliminate inefficiencies and reduce wasted time
Utilize technology tools to automate repetitive tasks and streamline workflows
Delegate tasks to team members to distribute workload and free up time for higher priority tasks
Set clear priorities and focus on important tasks to avoid wasting
posted on 20 Jul 2017
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
Exam will be conduct for aptitude test
I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
posted on 5 Aug 2022
Steel quantity can be calculated by multiplying the volume of steel by its density.
Calculate the volume of steel required for the project
Determine the density of the specific type of steel being used
Multiply the volume by the density to obtain the steel quantity
Consider any wastage or additional steel required for reinforcement
Example: To calculate steel quantity for a column, multiply the cross-sectional area of the c
The unit weight of steel refers to the weight of a specific volume of steel material.
Unit weight of steel is typically measured in kilograms per cubic meter (kg/m³).
The unit weight of steel can vary depending on the type and grade of steel.
For example, the unit weight of mild steel is around 7850 kg/m³.
Higher strength steels like stainless steel can have a higher unit weight.
Unit weight is an important factor in struct
Slab details refer to the specifications and characteristics of a concrete slab used in construction.
Slab details include the thickness, reinforcement, and type of slab.
The thickness of a slab depends on the load it needs to support.
Reinforcement in slabs is typically provided using steel bars or mesh.
Different types of slabs include one-way slab, two-way slab, flat slab, etc.
Slab details also include the finishing mat
To check column beam reinforcement and slab design on site, follow these steps:
Review the structural drawings and specifications to understand the design requirements
Inspect the reinforcement bars for proper placement, size, and spacing
Check the concrete cover thickness to ensure it meets the design requirements
Verify the alignment and verticality of columns and beams using plumb bobs or laser levels
Measure the dimensi...
How to work with us?
posted on 11 Jan 2024
I applied via AmbitionBox and was interviewed before Jan 2023. There was 1 interview round.
based on 1 interview
Interview experience
based on 48 reviews
Rating in categories
Deputy Manager
1.2k
salaries
| ₹5.8 L/yr - ₹17.5 L/yr |
Assistant Manager
727
salaries
| ₹4 L/yr - ₹14.8 L/yr |
Manager
416
salaries
| ₹8 L/yr - ₹22 L/yr |
Senior Engineer
395
salaries
| ₹3.5 L/yr - ₹13.5 L/yr |
Senior Manager
340
salaries
| ₹10.4 L/yr - ₹32.5 L/yr |
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company
KEC International