I applied via Naukri.com and was interviewed in Jan 2023. There were 4 interview rounds.
Manpower requirement can be calculated by analyzing project scope, tasks, timelines, and skill sets needed.
Determine project scope and objectives
Break down tasks and activities required to complete the project
Estimate time required for each task
Assess skill sets needed for each task
Calculate total hours required for each skill set
Consider efficiency factors and potential risks
Adjust for holidays, sick leaves, and other...
OEE stands for Overall Equipment Effectiveness, a metric used to measure the efficiency of a manufacturing process.
OEE takes into account three factors: availability, performance, and quality.
It is calculated by multiplying availability, performance, and quality percentages.
For example, if a machine is available 90% of the time, operates at 80% of its maximum speed, and produces 95% good parts, the OEE would be 68.4%.
Top trending discussions
posted on 28 Feb 2025
posted on 28 Aug 2024
I was interviewed in Jul 2024.
Transformer is a static device is change is ac voltage one level and another level but no change in frequency the work in mutual induction method.
Sailent type rotor and cylinder type rotor of uses in syuchronus machine.
Straight to straight
posted on 4 Dec 2024
Material engineer questions
posted on 29 Aug 2023
Test in apititude you advise in this better position and most great in company
Forging involves shaping metal through compression, while casting involves pouring molten metal into a mold.
Forging involves shaping metal through compressive forces, while casting involves pouring molten metal into a mold to solidify.
Forging typically results in stronger and more durable parts compared to casting.
Forging is a more precise process that allows for tighter tolerances, while casting is more suitable for c...
Forgings are metal components that are shaped by compressive forces, typically through hammering or pressing.
Forgings are typically stronger and more reliable than castings or machined parts.
Common forging processes include open-die forging, closed-die forging, and ring rolling.
Examples of forged components include crankshafts, connecting rods, and gears.
Forgings are often used in industries such as automotive, aerospa
Process in casting involves pouring molten metal into a mold to create a desired shape.
Mold preparation is crucial for successful casting
Molten metal is poured into the mold cavity
Cooling and solidification of the metal takes place inside the mold
The casting is removed from the mold and finished as needed
Forging is a manufacturing process where metal is shaped by applying compressive forces using a hammer or press.
Metal is heated to a high temperature to make it more malleable
The metal is then placed on a die and struck with a hammer or pressed to shape it
Forging can be done using different techniques like open-die forging, closed-die forging, and impression-die forging
I applied via Approached by Company and was interviewed in Sep 2023. There were 2 interview rounds.
Current Package refers to the salary and benefits offered to an employee at their current job.
Current Package includes salary, bonuses, benefits, and perks provided by the employer.
It is important for employees to understand their Current Package to evaluate their total compensation.
Examples of Current Package components: base salary, health insurance, retirement plans, paid time off, stock options.
posted on 6 May 2023
I applied via Approached by Company and was interviewed in Nov 2022. There were 3 interview rounds.
posted on 17 Dec 2022
I applied via campus placement at National Institute of Foundry and Forge Technology, Ranchi and was interviewed in Nov 2022. There were 2 interview rounds.
Average technical questions were asked
I applied via Recruitment Consulltant and was interviewed in Feb 2022. There were 2 interview rounds.
Total Productive Maintenance (TPM) is a maintenance strategy that aims to maximize equipment effectiveness and minimize downtime.
TPM involves the entire workforce in the maintenance process
It focuses on proactive maintenance to prevent breakdowns
TPM has eight pillars including autonomous maintenance, planned maintenance, and quality maintenance
TPM aims to improve overall equipment effectiveness (OEE) by reducing downti...
Environmental hazards can be mitigated through optimization methods.
Optimization methods can help reduce waste and emissions in manufacturing processes.
Design optimization can lead to more efficient and sustainable products.
Life cycle assessment can be used to identify environmental impacts and optimize for sustainability.
Examples of optimization methods include lean manufacturing, Six Sigma, and Design for Environment...
Phenol can be removed from water through various methods including adsorption, oxidation, and biodegradation.
Adsorption involves using activated carbon or other materials to attract and trap phenol molecules.
Oxidation can be achieved through the use of chemicals such as hydrogen peroxide or ozone, or through advanced oxidation processes like photocatalysis.
Biodegradation involves using microorganisms to break down phen...
Coke density and water consumption are important factors in coke production.
Coke density is typically measured in kg/m³ and can vary depending on the type of coke being produced.
Water consumption for coke production can vary depending on the production process and the quality of the raw materials.
Efficient use of water in coke production is important for both environmental and economic reasons.
Coke density and water co...
based on 1 interview
Interview experience
Assistant Manager
103
salaries
| ₹6.3 L/yr - ₹13.5 L/yr |
Senior Executive
66
salaries
| ₹4.2 L/yr - ₹9.4 L/yr |
Deputy Manager
51
salaries
| ₹8 L/yr - ₹18 L/yr |
Manager
30
salaries
| ₹13.6 L/yr - ₹22 L/yr |
Associate
27
salaries
| ₹2.4 L/yr - ₹10.5 L/yr |
JSW Steel
ArcelorMittal Nippon Steel
Steel Authority Of India
Jindal Steel and Power