Filter interviews by
Performance Management Systems (PMS) is a process that involves setting goals, monitoring progress, providing feedback, and evaluating performance.
Set clear and specific goals for employees to achieve.
Regularly monitor progress towards these goals.
Provide feedback to employees on their performance.
Evaluate performance based on predetermined criteria.
Use performance data to make decisions about promotions, bonuses, and
Grasim focuses on employee engagement through various initiatives such as wellness programs, recognition awards, and career development opportunities.
Wellness programs to promote physical and mental well-being
Recognition awards to acknowledge and appreciate employees' hard work
Career development opportunities such as training programs and mentorship
Employee feedback mechanisms to ensure continuous improvement
I applied via Campus Placement and was interviewed in Sep 2024. There was 1 interview round.
Stress is the force applied to a material, while strain is the resulting deformation. They are measured in units of force per unit area and are important in engineering and materials science.
Stress is the force applied to a material per unit area
Strain is the resulting deformation or change in shape of the material
Stress is typically measured in units like Pascals (Pa) or pounds per square inch (psi)
Strain is a dimensi...
Hospet Steels interview questions for popular designations
I applied via Company Website and was interviewed in Oct 2022. There was 1 interview round.
To test the short circuit terminal, use a multimeter to measure the resistance between the terminal and ground.
Set the multimeter to the resistance (ohms) mode.
Disconnect the power source from the circuit.
Connect one probe of the multimeter to the short circuit terminal and the other probe to a known ground point.
If the multimeter shows a very low resistance reading (close to zero), it indicates a short circuit.
If the ...
Get interview-ready with Top Hospet Steels Interview Questions
I applied via Naukri.com and was interviewed in Dec 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Feb 2022. There were 2 interview rounds.
Total Productive Maintenance (TPM) is a maintenance strategy that aims to maximize equipment effectiveness and minimize downtime.
TPM involves the entire workforce in the maintenance process
It focuses on proactive maintenance to prevent breakdowns
TPM has eight pillars including autonomous maintenance, planned maintenance, and quality maintenance
TPM aims to improve overall equipment effectiveness (OEE) by reducing downti...
Environmental hazards can be mitigated through optimization methods.
Optimization methods can help reduce waste and emissions in manufacturing processes.
Design optimization can lead to more efficient and sustainable products.
Life cycle assessment can be used to identify environmental impacts and optimize for sustainability.
Examples of optimization methods include lean manufacturing, Six Sigma, and Design for Environment...
Phenol can be removed from water through various methods including adsorption, oxidation, and biodegradation.
Adsorption involves using activated carbon or other materials to attract and trap phenol molecules.
Oxidation can be achieved through the use of chemicals such as hydrogen peroxide or ozone, or through advanced oxidation processes like photocatalysis.
Biodegradation involves using microorganisms to break down phen...
Coke density and water consumption are important factors in coke production.
Coke density is typically measured in kg/m³ and can vary depending on the type of coke being produced.
Water consumption for coke production can vary depending on the production process and the quality of the raw materials.
Efficient use of water in coke production is important for both environmental and economic reasons.
Coke density and water co...
I applied via Campus Placement and was interviewed in Mar 2022. There was 1 interview round.
The alloy steel industry is a sector that produces steel with specific properties by adding alloying elements.
Alloy steel industry produces steel with enhanced properties by adding alloying elements like chromium, nickel, or molybdenum.
The process steps in the alloy steel industry include melting, refining, casting, and heat treatment.
Melting involves heating the raw materials, including iron ore and alloying elements,...
Top trending discussions
Interview experience
based on 142 reviews
Rating in categories
Deputy Manager
72
salaries
| ₹5.7 L/yr - ₹12 L/yr |
Junior Engineer
51
salaries
| ₹1.9 L/yr - ₹4 L/yr |
Engineer
43
salaries
| ₹1.5 L/yr - ₹6.2 L/yr |
Executive
37
salaries
| ₹3.8 L/yr - ₹8.5 L/yr |
Manager
23
salaries
| ₹5.2 L/yr - ₹17 L/yr |
JSW Steel
Tata Steel
Steel Authority Of India
Jindal Steel and Power